Loading...
20190467 Station Lane Apts Transmittal Ltr 8-14-19 LANSING ENGINEERING PC Letter of Transmittal 2452 State Route 9, Suite 301 Malta, NY 12020 Telephone: (51 8] 899-5243 Facsimile: (51 8) 899-5245 Date: August 14, 2019 Proj. #- 780.00 RE: Station Lane Apartments Site Plan To: Susan Barden Principal Planner City of Saratoga Springs 474 Broadway Saratoga Springs, NY 12866 We are sending you ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ❑ Prints ® Plans/Originals El Specifications ® Copy of Letter LI Change Order ❑ Samples ® Report COPIES DATE NO. DESCRIPTION 3 8/14/19 Comment Response Letter 3 8/14/19 Full Size Plan Set 3 8/14/19 NYSDEC Wetland Permit Modification 3 8/14/19 Floodplain Map 1 8/14/19 SWPPP 1 8/14/19 CD THESE ARE TRANSMITTED as checked below: ® For approval LI Approved as submitted ❑ Resubmit 1 copies for approval El Other: El For your use ❑ Approved as noted ❑ Submit copies for distribution [III]As requested LI Returned for corrections 111 Return corrected prints LI For review and comment El For bids due El Borrowed prints returned REMARKS: Susan, Attached please find the Comment Response Letter addressing the comment letter provided by Bradley Grant, Senior Project Manager along with revised site plans. Also attached is (I) revised SWPPP for Bradley Grant's final review. If additional copies of the SWPPP are required, please contact me or see the CD for a digital copy. Please contact me with any questions at (518)-899-5243 ext. 107. Thank You. SIGNED: Douglas E. Flynn, Project Engineer If enclosures are not as noted, kindly notify us immediately P:IPROJECTS178000-Askew-Station Lane Apartments\DES]GN APPLICATIONS CORRESPONDENCEIDRAFTS178000-20]9 08_14-Trans doc