Loading...
20190246 Lake Local EAF Full Environmental Assessment Form Part 1 -Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information;indicate whether missing information does not exist, or is not reasonably available to the sponsor;and,when possible,generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A&B. In Sections C,D&E,most items contain an initial question that must be answered either"Yes"or"No". If the answer to the initial question is"Yes",complete the sub-questions that follow. If the answer to the initial question is"No",proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the project sponsor to verify that the information contained in Part lis accurate and complete. A.Project and Sponsor Information. Name of Action or Project: 550 Union Project Location(describe,and attach a general location map): 550 Union Avenue,Saratoga Springs,NY 12866 Brief Description of Proposed Action(include purpose or need): The project proposes to expand both a water sports rental shop(up to 2,400 sf),a restaurant(up to 15,000 sf),and add a Bed and Breakfast(up to 8,230 sf)and an Inn(up to 22,500 sf).The site contains a lake front marina which is permit 95 rental boat slips and 14 customer boat parking spaces for the restaurant. The project will require a lot line adjustment to combine the lots into one.The project may require a zoning amendment because the project site is within two districts. Name of Applicant/Sponsor: Telephone:587-7210 x26 550 Union LLC. E-Mail: jhaynes@phinneydesign.com Address:142 Grand Avnue City/PO:Saratoga Springs State:NY Zip Code:12866 Project Contact(if not same as sponsor;give name and title/role): Telephone:587-8100 The LA Group,PC E-Mail:mbrobston@thelagroup.com Address: 40 Long Alley City/PO: State: Zip Code: Saratoga Springs NY 12866 Property Owner (if not same as sponsor): Telephone: E-Mail: Address: City/PO: State: Zip Code: Page 1 of 13 RESET FORM B.Government Approvals B.Government Approvals Funding,or Sponsorship. ("Funding"includes grants,loans,tax relief,and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Council,Town Board, EYesENo or Village Board of Trustees b. City,Town or Village OYes❑No Saratoga Springs Planning Board Special Use November 2016-Special Use Planning Board or Commission Permit,Site Plan Approval, Lot Line Adjustment December 2016-Site Plan, Lot Line c. City Council,Town or 0Yes❑No Saratoga Springs City Council-Zoning Village Zoning Board of Appeals Amendment(possible) d.Other local agencies OYes❑No Saratoga Springs Design Review Commission- December 2016 Architectural Review e. County agencies OYes❑No Saratoga County Planning Board-Advisory November 2016 Opinion f. Regional agencies EYesENo g. State agencies EYesENo h.Federal agencies ❑Yes❑No i. Coastal Resources. i. Is the project site within a Coastal Area,or the waterfront area of a Designated Inland Waterway? 0Yes❑No If Yes, ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? ❑YesmNo iii. Is the project site within a Coastal Erosion Hazard Area? ❑Yes0No C.Planning and Zoning C.1.Planning and zoning actions. Will administrative or legislative adoption,or amendment of a plan,local law,ordinance,rule or regulation be the ❑Yes®No only approval(s)which must be granted to enable the proposed action to proceed? • If Yes,complete sections C,F and G. • If No,proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2.Adopted land use plans. a.Do any municipally-adopted (city,town,village or county)comprehensive land use plan(s)include the site ❑Yes®No where the proposed action would be located? If Yes,does the comprehensive plan include specific recommendations for the site where the proposed action ❑Yes❑No would be located? b.Is the site of the proposed action within any local or regional special planning district(for example: Greenway ®Yes❑No Brownfield Opportunity Area(BOA);designated State or Federal heritage area;watershed management plan; or other?) If Yes,identify the plan(s): Saratoga Lake Association c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, ❑Yes0No or an adopted municipal farmland protection plan? If Yes,identify the plan(s): Page 2 of 13 RESET FORM C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. ®Yes❑No If Yes,what is the zoning classification(s)including any applicable overlay district? WRB-Water Related Business within the Corridor Lodging District,Rural Residential within the Corridor Lodging District b. Is the use permitted or allowed by a special or conditional use permit? ®Yes❑No c.Is a zoning change requested as part of the proposed action? ®Yes❑No If Yes, i. What is the proposed new zoning for the site? WRB-Water Related Business changed from Rural Residential,Anticipated to be changed with revised city zoning. C.4.Existing community services. a.In what school district is the project site located? Saratoga Springs City School District b.What police or other public protection forces serve the project site? Saratoga Springs Police Department c.Which fire protection and emergency medical services serve the project site? Saratoga Springs Emergency Services d.What parks serve the project site? All parks within the city limits D.Project Details D.1.Proposed and Potential Development a.What is the general nature of the proposed action(e.g.,residential,industrial,commercial,recreational; if mixed,include all components)?The proposed action is commercial with lodging b. a. Total acreage of the site of the proposed action? 3.22 acres b.Total acreage to be physically disturbed? 3.22 acres c. Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 3.22 acres c.Is the proposed action an expansion of an existing project or use? ®Yes❑No i. If Yes,what is the approximate percentage of the proposed expansion and identify the units(e.g.,acres,miles,housing units, square feet)? % 215 Units: square feet d.Is the proposed action a subdivision,or does it include a subdivision? ❑Yes No If Yes, i. Purpose or type of subdivision?(e.g.,residential,industrial,commercial; if mixed,specify types) ii. Is a cluster/conservation layout proposed? ❑Yes❑No iii. Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum e.Will proposed action be constructed in multiple phases? ®Yes❑No i. If No,anticipated period of construction: 27 months ii. If Yes: • Total number of phases anticipated 2 or 3 • Anticipated commencement date of phase 1 (including demolition) Feb month 2017 year • Anticipated completion date of final phase May month 2019 year • Generally describe connections or relationships among phases,including any contingencies where progress of one phase may determine timing or duration of future phases: Phase one would be the restaurant expansion,Phase two(maybe three)would be the Bed and Breakfast and Inn. Page 3 of 13 RESET FORM f.Does the project include new residential uses? ❑Yes®No If Yes, show numbers of units proposed. One Family Two Family Three Family Multiple Family(four or more) Initial Phase At completion of all phases g.Does the proposed action include new non-residential construction(including expansions)? ®Yes❑No If Yes, i. Total number of structures 7 ii. Dimensions(in feet)of largest proposed structure: 40 height; 64'width; and 64'length iii. Approximate extent of building space to be heated or cooled: 50,000 square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any ❑Yes®No liquids,such as creation of a water supply,reservoir,pond,lake,waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment,the principal source of the water: ❑ Ground water❑Surface water streams ❑Other specify: iii. If other than water,identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure(e.g.,earth fill,rock,wood,concrete): D.2. Project Operations a.Does the proposed action include any excavation,mining,or dredging,during construction,operations,or both? flYesNo (Not including general site preparation,grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i.What is the purpose of the excavation or dredging? ii. How much material(including rock,earth, sediments,etc.)is proposed to be removed from the site? • Volume(specify tons or cubic yards): • Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged,and plans to use,manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? EYesENo If yes,describe. v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? ❑Yes❑No ix. Summarize site reclamation goals and plan: b.Would the proposed action cause or result in alteration of,increase or decrease in size of,or encroachment EYesNo into any existing wetland,waterbody,shoreline,beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected(by name,water index number,wetland map number or geographic description): Page 4 of 13 RESET FORM ii. Describe how the proposed action would affect that waterbody or wetland,e.g.excavation,fill,placement of structures,or alteration of channels,banks and shorelines. Indicate extent of activities,alterations and additions in square feet or acres: iii. Will proposed action cause or result in disturbance to bottom sediments? ❑Yes❑No If Yes,describe: iv. Will proposed action cause or result in the destruction or removal of aquatic vegetation? ❑YesENo If Yes: • acres of aquatic vegetation proposed to be removed • expected acreage of aquatic vegetation proposed to be removed • purpose of proposed removal(e.g.beach clearing,invasive species control,boat access): • proposed method of plant removal: • if chemical/herbicide treatment will be used,specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c.Will the proposed action use,or create a new demand for water? OYes❑No If Yes: i. Total anticipated water usage/demand per day: 20,000(peak), 11,730(off-peak) gallons/day ii. Will the proposed action obtain water from an existing public water supply? 0Yes EINo If Yes: • Name of district or service area: Saratoga Springs • Does the existing public water supply have capacity to serve the proposal? m Yes❑No • Is the project site in the existing district? m Yes❑No • Is expansion of the district needed? E Yes®No • Do existing lines serve the project site? m Yes❑No iii. Will line extension within an existing district be necessary to supply the project? EYes®No If Yes: • Describe extensions or capacity expansions proposed to serve this project: • Source(s)of supply for the district: Saratoga Springs iv. Is a new water supply district or service area proposed to be formed to serve the project site? ❑YesONo If,Yes: • Applicant/sponsor for new district: • Date application submitted or anticipated: • Proposed source(s)of supply for new district: v. If a public water supply will not be used,describe plans to provide water supply for the project: vi. If water supply will be from wells(public or private),maximum pumping capacity: gallons/minute. d.Will the proposed action generate liquid wastes? m Yes❑No If Yes: i. Total anticipated liquid waste generation per day: 20,000(peak) gallons/day 11,730(off-peak) ii. Nature of liquid wastes to be generated(e.g., sanitary wastewater,industrial;if combination,describe all components and approximate volumes or proportions of each): Sanitary Wastewater and Kitchen waste iii. Will the proposed action use any existing public wastewater treatment facilities? m Yes❑No If Yes: • Name of wastewater treatment plant to be used: Saratoga County Sewer District#1 • Name of district: Saratoga Springs County District#1 • Does the existing wastewater treatment plant have capacity to serve the project? m Yes❑No • Is the project site in the existing district? m Yes❑No • Is expansion of the district needed? ❑Yes mNo Page 5 of 13 RESET FORM • Do existing sewer lines serve the project site? ®Yes❑No • Will line extension within an existing district be necessary to serve the project? ❑Yes No If Yes: • Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater(sewage)treatment district be formed to serve the project site? [Wes®No If Yes: • Applicant/sponsor for new district: • Date application submitted or anticipated: • What is the receiving water for the wastewater discharge? v. If public facilities will not be used,describe plans to provide wastewater treatment for the project,including specifying proposed receiving water(name and classification if surface discharge,or describe subsurface disposal plans): vi. Describe any plans or designs to capture,recycle or reuse liquid waste: e.Will the proposed action disturb more than one acre and create stormwater runoff,either from new point ®Yes❑No sources(i.e. ditches,pipes,swales,curbs,gutters or other concentrated flows of stormwater)or non-point source(i.e. sheet flow)during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? Square feet or 2.3 acres(impervious surface) Square feet or 3.22 acres(parcel size) ii. Describe types of new point sources.Surface RunnOoff iii. Where will the stormwater runoff be directed(i.e.on-site stormwater management facility/structures,adjacent properties, groundwater,on-site surface water or off-site surface waters)? Stormwater runoff will be collected on site detained. • If to surface waters,identify receiving water bodies or wetlands: • Will stormwater runoff flow to adjacent properties? ❑Yes❑No iv. Does proposed plan minimize impervious surfaces,use pervious materials or collect and re-use stormwater? ®Yes❑No f. Does the proposed action include,or will it use on-site,one or more sources of air emissions,including fuel ❑Yes®No combustion,waste incineration,or other processes or operations? If Yes,identify: i.Mobile sources during project operations(e.g.,heavy equipment,fleet or delivery vehicles) ii. Stationary sources during construction(e.g.,power generation, structural heating,batch plant,crushers) iii. Stationary sources during operations(e.g.,process emissions,large boilers,electric generation) g.Will any air emission sources named in D.2.f(above),require a NY State Air Registration,Air Facility Permit, ❑Yes No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet ❑Yes❑No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application,the project will generate: • Tons/year(short tons)of Carbon Dioxide(CO2) • Tons/year(short tons)of Nitrous Oxide(N20) • Tons/year(short tons)of Perfluorocarbons(PFCs) • Tons/year(short tons)of Sulfur Hexafluoride(SF6) • Tons/year(short tons)of Carbon Dioxide equivalent of Hydroflourocarbons(HFCs) • Tons/year(short tons)of Hazardous Air Pollutants(HAPs) Page 6 of 13 RESET FORM h.Will the proposed action generate or emit methane(including,but not limited to,sewage treatment plants, UYesNo landfills,composting facilities)? If Yes: i. Estimate methane generation in tons/year(metric): ii.Describe any methane capture,control or elimination measures included in project design(e.g.,combustion to generate heat or electricity,flaring): i.Will the proposed action result in the release of air pollutants from open-air operations or processes,such as DYesNo quarry or landfill operations? If Yes: Describe operations and nature of emissions(e.g.,diesel exhaust,rock particulates/dust): j.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial ❑Yes®No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected(Check all that apply): ❑Morning ❑Evening ❑Weekend ❑Randomly between hours of to . ii. For commercial activities only,projected number of semi-trailer truck trips/day: iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? ❑Yes❑No v. If the proposed action includes any modification of existing roads,creation of new roads or change in existing access,describe: vi. Are public/private transportation service(s)or facilities available within V2 mile of the proposed site? ❑Yes❑No vii Will the proposed action include access to public transportation or accommodations for use of hybrid,electric ❑Yes❑No or other alternative fueled vehicles? viii.Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing ❑Yes❑No pedestrian or bicycle routes? k.Will the proposed action(for commercial or industrial projects only)generate new or additional demand ®Yes❑No for energy? If Yes: i. Estimate annual electricity demand during operation of the proposed action: 300,000 kwh ii. Anticipated sources/suppliers of electricity for the project(e.g.,on-site combustion,on-site renewable,via grid/local utility,or other): Local Provider iii. Will the proposed action require a new,or an upgrade to,an existing substation? UYesNo 1. Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations: • Monday-Friday: 7 am-7pm • Monday-Friday: Restaurant 8am-midnight Rental shop • Saturday: 7am-7pm • Saturday: Restaurant 8am-midnight 7am-8pm/dusk • Sunday: 7am-7pm • Sunday: Restaurant 8am-midnight Marina 7am-6pm office • Holidays: • Holidays: Restaurant 8am-midnight Inn/B&B 24 hrs Page 7 of 13 RESET FORM m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ®Yes❑No operation,or both? If yes: i. Provide details including sources,time of day and duration: Construction noises during hours ii. Will proposed action remove existing natural barriers that could act as a noise barrier or screen? ❑Yes®No Describe: n.. Will the proposed action have outdoor lighting? ®Yes❑No If yes: i. Describe source(s),location(s),height of fixture(s),direction/aim,and proximity to nearest occupied structures: Lighting will be included for building entrances and exits,dark-sky friendly lighting for parking spaces between building. ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ❑Yes®No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? ®Yes❑No If Yes,describe possible sources,potential frequency and duration of odor emissions,and proximity to nearest occupied structures: Kitchen exhaust during hours of operation approx. 190'from nearest residence. p.Will the proposed action include any bulk storage of petroleum(combined capacity of over 1,100 gallons) ❑Yes®No or chemical products(185 gallons in above ground storage or an amount in underground storage)? If Yes: i. Product(s)to be stored ii. Volume(s) per unit time (e.g.,month,year) iii. Generally describe proposed storage facilities: q.Will the proposed action(commercial,industrial and recreational projects only)use pesticides(i.e.,herbicides, ❑Yes No insecticides)during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? ❑ Yes ❑No r.Will the proposed action(commercial or industrial projects only)involve or require the management or disposal ® Yes ❑No of solid waste(excluding hazardous materials)? If Yes: i. Describe any solid waste(s)to be generated during construction or operation of the facility: • Construction: 1.5 tons per month (unit of time) • Operation: 1 tons per month (unit of time) ii. Describe any proposals for on-site minimization,recycling or reuse of materials to avoid disposal as solid waste: • Construction:Cardboard recycling • Operation: recycling of all recyclable materials iii. Proposed disposal methods/facilities for solid waste generated on-site: • Construction: Local waste hauler • Operation: Local waste hauler Page 8 of 13 RESET FORM s.Does the proposed action include construction or modification of a solid waste management facility? El Yes® No If Yes: i. Type of management or handling of waste proposed for the site(e.g.,recycling or transfer station,composting,landfill,or other disposal activities): ii. Anticipated rate of disposal/processing: • Tons/month,if transfer or other non-combustion/thermal treatment,or • Tons/hour,if combustion or thermal treatment iii. If landfill,anticipated site life: years t.Will proposed action at the site involve the commercial generation,treatment,storage,or disposal of hazardous EYes No waste? If Yes: i. Name(s)of all hazardous wastes or constituents to be generated,handled or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization,recycling or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? EYesNo If Yes:provide name and location of facility: If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: E. Site and Setting of Proposed Action E.1.Land uses on and surrounding the project site a. Existing land uses. i. Check all uses that occur on,adjoining and near the project site. ❑ Urban ❑ Industrial ® Commercial ® Residential(suburban) ❑ Rural(non-farm) ❑ Forest 0 Agriculture ® Aquatic 0 Other(specify): ii. If mix of uses,generally describe: The project site is adjacent to Saratoga Lake,there are existing residence to the west and a commercial business across Union to the North. b.Land uses and covertypes on the project site. Land use or Current Acreage After Change Covertype Acreage Project Completion (Acres+/-) • Roads,buildings,and other paved or impervious surfaces 2.0 2.3 +.3 • Forested • Meadows,grasslands or brushlands(non- agricultural,including abandoned agricultural) • Agricultural (includes active orchards,field,greenhouse etc.) • Surface water features (lakes,ponds,streams,rivers,etc.) • Wetlands(freshwater or tidal) • Non-vegetated(bare rock,earth or fill) • Other Describe:Lawn and Landscape 1.2 .9 -.3 Page 9 of 13 RESET FORM c. Is the project site presently used by members of the community for public recreation? ❑Yes❑✓ No i. If Yes: explain: d.Are there any facilities serving children,the elderly,people with disabilities(e.g.,schools,hospitals,licensed ❑Yes®No day care centers,or group homes)within 1500 feet of the project site? If Yes, i. Identify Facilities: e. Does the project site contain an existing dam? ❑Yes®No If Yes: i. Dimensions of the dam and impoundment: • Dam height: feet • Dam length: feet • Surface area: acres • Volume impounded: gallons OR acre-feet ii. Dam's existing hazard classification: iii. Provide date and summarize results of last inspection: f.Has the project site ever been used as a municipal,commercial or industrial solid waste management facility, ❑YesIONo or does the project site adjoin property which is now,or was at one time,used as a solid waste management facility? If Yes: i. Has the facility been formally closed? El Yes❑ No • If yes,cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g.Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin ❑Yeses No property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste? If Yes: i. Describe waste(s)handled and waste management activities,including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site,or have any ❑Yes® No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site ❑Yes❑No Remediation database? Check all that apply: ❑ Yes—Spills Incidents database Provide DEC ID number(s): ❑ Yes—Environmental Site Remediation database Provide DEC ID number(s): El Neither database ii. If site has been subject of RCRA corrective activities,describe control measures: iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? ❑Yes❑No If yes,provide DEC ID number(s): iv. If yes to(i), (ii)or(iii)above,describe current status of site(s): Page 10 of 13 RESET FORM v. Is the project site subject to an institutional control limiting property uses? ❑Yes❑No • If yes,DEC site ID number: • Describe the type of institutional control(e.g.,deed restriction or easement): • Describe any use limitations: • Describe any engineering controls: • Will the project affect the institutional or engineering controls in place? ❑Yes❑No • Explain: E.2. Natural Resources On or Near Project Site a.What is the average depth to bedrock on the project site? >17 feet b.Are there bedrock outcroppings on the project site? ❑Yes ONo If Yes,what proportion of the site is comprised of bedrock outcroppings? % c. Predominant soil type(s)present on project site: Udipsamments,dredged 70 % Windsor Loamy Sand 30 % d.What is the average depth to the water table on the project site? Average: +/-5 feet e. Drainage status of project site soils:❑ Well Drained: 30%of site ❑ Moderately Well Drained: 60%of site ❑ Poorly Drained 10%of site f.Approximate proportion of proposed action site with slopes: ® 0-10%: 70 %of site ® 10-15%: 20 %of site ® 15%or greater: 10 %of site g.Are there any unique geologic features on the project site? ❑Yes®No If Yes,describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies(including streams,rivers, 0Yes❑No ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? ❑Yes®No If Yes to either i or ii,continue. If No, skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, 0Yes❑No state or local agency? iv. For each identified regulated wetland and waterbody on the project site,provide the following information: • Streams: Name Classification • Lakes or Ponds: Name Saratoga Lake Classification • Wetlands: Name Approximate Size • Wetland No. (if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired ['Yes IZINo waterbodies? If yes,name of impaired water body/bodies and basis for listing as impaired: i. Is the project site in a designated Floodway? OYes❑No j. Is the project site in the 100 year Floodplain? OYes❑No k.Is the project site in the 500 year Floodplain? OYes❑No 1. Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer? ❑Yes 171No If Yes: i. Name of aquifer: Page 11 of 13 RESET FORM m. Identify the predominant wildlife species that occupy or use the project site: Multiple Bird Species Amphibian species Small Rodents Insects n.Does the project site contain a designated significant natural community? ❑Yes IZINo If Yes: i. Describe the habitat/community(composition,function,and basis for designation): ii. Source(s)of description or evaluation: iii. Extent of community/habitat: • Currently: acres • Following completion of project as proposed: acres • Gain or loss(indicate+or-): acres o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as ❑YesIZINo endangered or threatened,or does it contain any areas identified as habitat for an endangered or threatened species? p. Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of ❑YesmNo special concern? q. Is the project site or adjoining area currently used for hunting,trapping,fishing or shell fishing? ['Yes IZINo If yes,give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a. Is the project site,or any portion of it,located in a designated agricultural district certified pursuant to ['Yes No Agriculture and Markets Law,Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number: b.Are agricultural lands consisting of highly productive soils present? ['Yes®No i. If Yes: acreage(s)on project site? ii. Source(s)of soil rating(s): c. Does the project site contain all or part of,or is it substantially contiguous to,a registered National ❑Yes®No Natural Landmark? If Yes: i. Nature of the natural landmark: ❑Biological Community ❑ Geological Feature ii. Provide brief description of landmark,including values behind designation and approximate size/extent: d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? ❑Yes®No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 12 of 13 RESET FORM e. Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district ❑Yes®No which is listed on,or has been nominated by the NYS Board of Historic Preservation for inclusion on,the State or National Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: ❑Archaeological Site ❑Historic Building or District ii. Name: iii. Brief description of attributes on which listing is based: f.Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for ®Yes❑No archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory? g. Have additional archaeological or historic site(s)or resources been identified on the project site? ❑Yes No If Yes: i.Describe possible resource(s): ii. Basis for identification: h.Is the project site within five miles of any officially designated and publicly accessible federal, state,or local ❑Yes®No scenic or aesthetic resource? If Yes: i. Identify resource: ii. Nature of,or basis for,designation(e.g.,established highway overlook,state or local park, state historic trail or scenic byway, etc.): iii. Distance between project and resource: miles. i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers ❑Yes®No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? ❑Yes❑No F.Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal,please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Date Signature Title PRINT FORM Page 13 of 13 RESET FORM