20190232 Flat Rock Centre Parking Structure - SEQRA FEAF P1 Fall Environmental Assessment Form Part I .Project and Setting Instructions for Completing Part 1 Part I is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review,and may be subject to further verification. Complete Part I based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information; indicate whether missing information does not exist, or is not reasonably available to the sponsor;and,when possible,generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A&B. In Sections C,D&E,most items contain an initial question that must be answered either"Yes"or"No". If the answer to the initial question is"Yes",complete the sub-questions that follow. If the answer to the initial question is"No",proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the project sponsor to verify that the information contained in Part I is accurate and complete. A.Project and Sponsor Information. Name of Action or Project: Flat Rock Centre Project Location(describe,and attach a general location map): The±2.62 acres of land located between Maple Ave.,York St.,and High Rock Ave.(parcel ID#165.52-4-45.1,-45.2)within the City of Saratoga Springs. Brief Description of Proposed Action(include purpose or need): The redevelopment of this former Urban Renewal site to include the establishment of a public park(Flat Rock Park)at the southerly end of the parcel along lake Avenue and where Flat Rock spring once existed,the continuation of the Park at the easterly side of the parcel along High Rock Avenue,which will connect Flat Rock Park to High Rock Park and include the Greenbelt Trail Downtown Connector,the development of a multi-story municipal parking structure to accommodate±600 spaces,and the retention of out-parcels for possible future development. Name of Applicant/Sponsor: Telephone:518-587-3550 City of Saratoga Springs E-Mail: bbirge@saratoga-springs.org Address:474 Broadway City/PO:Saratoga Springs State:NY Zip Code:12866 r Project Contact(if not same as sponsor;give name and title/role): Telephone:518-587-3550 Bradley Birge;Administrator of Planning and Economic Development E-Mail: bbirge@saratoga-springs.org Address: City/PO: State: Zip Code: Property Owner (if not same as sponsor): Telephone: 587-3550 City of Saratoga Springs E-Mail: Address: City Hall,474 Broadway City/PO: State: Zip Code: Saratoga Springs NY 12866 Page 1 of 13 RESET FORM B.Government Approvals B.Government Approvals Funding,or Sponsorship. ("Funding"includes grants,loans,tax relief,and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a.City Council,Town Board, ®YesDNo Saratoga Springs City Council December 2018 or Village Board of Trustees b.City,Town or Village EYes0No Planning Board or Commission c.City Council,Town or ElYes®No Village Zoning Board of Appeals d.Other local agencies ®YesEJNo Sarartoga Springs City Center Authority December 2018 e.County agencies Eyes®No f. Regional agencies ❑Yes®No , g.State agencies ®YesENo NYS DOT-Greenbelt Trail December 2018 NYS DEC-Greenbelt Trail December 2018 h.Federal agencies ❑Yes®No i. Coastal Resources. i. Is the project site within a Coastal Area,or the waterfront area of a Designated Inland Waterway? ❑Yes®No If Yes, ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? 0 YesENo iii. Is the project site within a Coastal Erosion Hazard Area? 0 YesONo C.Planning and Zoning Cl.Planning and zoning actions. Will administrative or legislative adoption,or amendment of a plan,local law,ordinance,rule or regulation be the EYes®No only approval(s)which must be granted to enable the proposed action to proceed? • If Yes,complete sections C,F and G. ® If No,proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2.Adopted land use plans. a.Do any municipally-adopted (city,town,village or county)comprehensive land use plan(s)include the site C�'JYes0No where the proposed action would be located? If Yes,does the comprehensive plan include specific recommendations for the site where the proposed action ❑Yes®No would be located? b. Is the site of the proposed action within any local or regional special planning district(for example: Greenway ®YesDNo Brownfield Opportunity Area(BOA);designated State or Federal heritage area;watershed management plan; or other?) If Yes,identify the plan(s): NYS Heritage Area:Mohawk Valley Heritage Corridor NYS Heritage Area:Saratoga c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, ®YesDNo or an adopted municipal farmland protection plan? If Yes,identify the plan(s): City of Saratoga Open Space Plan 1994,2002 Page 2 of 13 RESET FORM C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. 1 Yes❑No If Yes,what is the zoning classification(s) including any applicable overlay district? Transect-6 Urban Core District b. Is the use permitted or allowed by a special or conditional use permit? ❑Yes®No c.Is a zoning change requested as part of the proposed action? ❑Yes®No If Yes, 1. What is the proposed new zoning for the site? C.4.Existing community services. a.In what school district is the project site located? Saratoga Springs City Schools b.What police or other public protection forces serve the project site? City of Saratoga Springs c.Which fire protection and emergency medical services serve the project site? City of Saratoga Springs Fire and EMS d.What parks serve the project site? High Rock Park is adjacent;several others,including Congress Park,are located within 1 mile of the site. D.Project Details D.I.Proposed and Potential Development a.What is the general nature of the proposed action(e.g.,residential,industrial,commercial,recreational; if mixed,include all components)?construction of municipal parking facility;expansion of High Rock park;establishment of Flat Rock park; inclusion of Greenbelt Trail Downtown Connector; retention of out-parcels for possible future development b.a.Total acreage of the site of the proposed action? 2.62 acres b.Total acreage to be physically disturbed? 2.62 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 2.62 acres c.Is the proposed action an expansion of an existing project or use? YesINo i. If Yes,what is the approximate percentage of the proposed expansion and identify the units(e.g.,acres,miles,housing units, square feet)? % Units: d.Is the proposed action a subdivision,or does it include a subdivision? [ Yes ONo If Yes, i. Purpose or type of subdivision?(e.g.,residential,industrial,commercial;if mixed,specify types) ii. Is a cluster/conservation layout proposed? ❑Yes ONo iii.Number of lots proposed? iv. Minimum and maximum proposed lot sizes? Minimum Maximum e.Will proposed action be constructed in multiple phases? ®YesONo i. If No,anticipated period of construction: months ii. If Yes: • Total number of phases anticipated 2 o Anticipated commencement date of phase I (including demolition) 5 month 2619 year ® Anticipated completion date of final phase 5 month 2020 year • Generally describe connections or relationships among phases, including any contingencies where progress of one phase may determine timing or duration of future phases: Phase 1 will focus on the construction of a new parking structure on the Northern end of the property and the Greenbelt Trail downtown connector pathway along High Rock Ave to Lake Ave.Phase 2 designs,final components and configuration will include a range of potential public uses such as parklands, building infill,public amenities and parking. Page 3 of 13 f.Does the project include new residential uses? ,]Yes®No If Yes,show numbers of units proposed. One Family Two Family Three Family Multiple Family(four or more) Initial Phase At completion of all phases g.Does the proposed action include new non-residential construction(including expansions)? ®Yes[ No If Yes, i.Total number of structures 1 ii. Dimensions(in feet)of largest proposed structure: 70 height; 180 width; and 320 length iii. Approximate extent of building space to be heated or cooled: 5,000 square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any ]Yes®No liquids,such as creation of a water supply,reservoir,pond,lake,waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment,the principal source of the water: ❑ Ground water t:i Surface water streams flOther specify: iii. If other than water,identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons;surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure(e.g.,earth fill,rock,wood,concrete): Di. Project Operations a.Does the proposed action include any excavation,mining,or dredging,during construction,operations,or both? DYes[ZiNo (Not including general site preparation,grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i.What is the purpose of the excavation or dredging? ii. How much material(including rock,earth,sediments,etc.)is proposed to be removed from the site? O Volume(specify tons or cubic yards): O Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged,and plans to use,manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? DYesDNo If yes,describe. v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? ❑Yes❑No ix. Summarize site reclamation goals and plan: b.Would the proposed action cause or result in alteration of,increase or decrease in size of,or encroachment ❑Yes®No into any existing wetland,waterbody,shoreline,beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected(by name,water index number,wetland map number or geographic description): Page 4 of 13 RESET FORM ii. Describe how the proposed action would affect that waterbody or wetland,e.g.excavation,fill,placement of structures,or alteration of channels,banks and shorelines. Indicate extent of activities,alterations and additions in square feet or acres: iii. Will proposed action cause or result in disturbance to bottom sediments? ❑YesEiNo If Yes,describe: iv. Will proposed action cause or result in the destruction or removal of aquatic vegetation? ❑YesDNo If Yes: O acres of aquatic vegetation proposed to be removed • expected acreage of aquatic vegetation proposed to be removed o purpose of proposed removal(e.g.beach clearing, invasive species control,boat access): O proposed method of plant removal: O if chemical/herbicide treatment will be used,specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c.Will the proposed action use,or create a new demand for water? ®Yes❑No If Yes: i. Total anticipated water usage/demand per day: 400 gallons/day ii. Will the proposed action obtain water from an existing public water supply? ®Yes❑No If Yes: o Name of district or service area: City of Saratoga Springs,NY • Does the existing public water supply have capacity to serve the proposal? ®Yes0 No • Is the project site in the existing district? i Yes❑No ® Is expansion of the district needed? ❑Yes®No O Do existing lines serve the project site? Yes❑No iii. Will line extension within an existing district be necessary to supply the project? ❑Yes OTo If Yes: O Describe extensions or capacity expansions proposed to serve this project: • Source(s)of supply for the district: City of Saratoga Springs,NY iv. Is a new water supply district or service area proposed to be formed to serve the project site? ❑ Yes®No If,Yes: ® Applicant/sponsor for new district: O Date application submitted or anticipated: O Proposed source(s)of supply for new district: v. If a public water supply will not be used,describe plans to provide water supply for the project: vi.If water supply will be from wells(public or private),maximum pumping capacity: gallons/minute. d.Will the proposed action generate liquid wastes? ®Yes❑No If Yes: i. Total anticipated liquid waste generation per day: 400 gallons/day ii. Nature of liquid wastes to be generated(e.g.,sanitary wastewater,industrial;if combination,describe all components and approximate volumes or proportions of each): Sanitary waste iii. Will the proposed action use any existing public wastewater treatment facilities? ®Yes LJNo If Yes: • Name of wastewater treatment plant to be used: Saratoga County Sewer District#1 • Name of district: o Does the existing wastewater treatment plant have capacity to serve the project? ®Yes❑No • Is the project site in the existing district? ®Yes❑No • Is expansion of the district needed? ❑Yes INo Page 5 of 13 RESET FORM O Do existing sewer lines serve the project site? ca Yes[=No O Will line extension within an existing district be necessary to serve the project? [ Yes ViNo If Yes: i Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater(sewage)treatment district be formed to serve the project site? ❑Yes ONo If Yes: 4, Applicant/sponsor for new district: O Date application submitted or anticipated: • What is the receiving water for the wastewater discharge? v. If public facilities will not be used,describe plans to provide wastewater treatment for the project, including specifying proposed receiving water(name and classification if surface discharge,or describe subsurface disposal plans): vi. Describe any plans or designs to capture,recycle or reuse liquid waste: e.Will the proposed action disturb more than one acre and create stormwater runoff,either from new point JYes❑No sources(i.e.ditches,pipes,swales,curbs,gutters or other concentrated flows of stormwater)or non-point source(i.e.sheet flow)during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? 79,279 Square feet or 1.82 acres(impervious surface) 114,127 Square feet or 2.62 acres(parcel size/lease area) ii. Describe types of new point sources. Stormwater collection will be through a closed stormwater system iii. Where will the stormwater runoff be directed(i.e.on-site stormwater management facility/structures,adjacent properties, groundwater,on-site surface water or off-site surface waters)? On-site stormwater treatment that is connected to a municipal stormwater collection system and includes a hydro-dynamic separator prior to connecting. O If to surface waters,identify receiving water bodies or wetlands: ® Will stormwater runoff flow to adjacent properties? ❑Yes®No iv. Does proposed plan minimize impervious surfaces,use pervious materials or collect and re-use stormwater? YesD No f. Does the proposed action include,or will it use on-site,one or more sources of air emissions,including fuel :Wes®No combustion,waste incineration,or other processes or operations? If Yes,identify: i.Mobile sources during project operations(e.g.,heavy equipment,fleet or delivery vehicles) ii. Stationary sources during construction(e.g.,power generation,structural heating,batch plant,crushers) iii. Stationary sources during operations(e.g.,process emissions,large boilers,electric generation) g.Will any air emission sources named in D.2.f(above),require a NY State Air Registration,Air Facility Permit, ❑Yes®No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet ❑Yes❑No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application,the project will generate: ® Tons/year(short tons)of Carbon Dioxide(CO2) Tons/year(short tons)of Nitrous Oxide(N20) Tons/year(short tons)of Perfluorocarbons(PFCs) ® Tons/year(short tons)of Sulfur Hexafluoride(SF6) Tons/year(short tons)of Carbon Dioxide equivalent of Hydroflourocarbons(HFCs) ® .Tons/year(short tons)of Hazardous Air Pollutants(HAPs) Page 6 of 13 RESET FORM h.Will the proposed action generate or emit methane(including,but not limited to,sewage treatment plants, ❑Yes®No landfills,composting facilities)? If Yes: i. Estimate methane generation in tons/year(metric): ii. Describe any methane capture,control or elimination measures included in project design(e.g.,combustion to generate heat or electricity,flaring): i.Will the proposed action result in the release of air pollutants from open-air operations or processes,such as OYes®No quarry or landfill operations? If Yes:Describe operations and nature of emissions(e.g.,diesel exhaust,rock particulates/dust): j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial ®YesDNo new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected(Check all that apply): ®Morning ® Evening ®Weekend ®Randomly between hours of 7am to 2pm .&4pm to 6pm ii. For commercial activities only,projected number of semi-trailer truck trips/day: N/A iii. Parking spaces: Existing 277 Proposed +6q0 Net increase/decrease ±323 iv. Does the proposed action include any shared use parking? ®Yes[]No v. If the proposed action includes any modification of existing roads,creation of new roads or change in existing access,describe: I►"► !. ► 1! ' '1 .1 1 III 11 " . .10 1 ► ■ I II l 'S 00.1 vi. Are public/private transportation service(s)or facilities available within %2 mile of the proposed site? ®YesONo vii Will the proposed action include access to public transportation or accommodations for use of hybrid,electric OYesO No or other alternative fueled vehicles? Car charging stations anticipated viii.Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing ®YesDNo pedestrian or bicycle routes? k, Will the proposed action(for commercial or industrial projects only)generate new or additional demand OYesONo for energy? If Yes: i. Estimate annual electricity demand during operation of the proposed action: ±8,000 kwhlmth;±96,000 kwh/yr.) ii. Anticipated sources/suppliers of electricity for the project(e.g.,on-site combustion,on-site renewable,via grid/local utility,or other): Via Grid/Local utility-National Grid/solar panel utilization iii. Will the proposed action require a new,or an upgrade to,an existing substation? DYesNo 1.Hours of operation. Answer all items which apply. 1. During Construction: ii. During Operations: ® Monday-Friday: 7am-6pm • Monday-Friday: 24 Hours o Saturday: 7am-6pm • Saturday: 24 Hours O Sunday: N/A o Sunday: 24 Hours ® Holidays: N/A 0 Holidays: 24 Hours Page 7 of 13 RESET FORM m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ®Yes❑No operation,or both? If yes: i. Provide details including sources,time of day and duration: Typical construction-related activities(lam-spm typically) ii. Will proposed action remove existing natural barriers that could act as a noise barrier or screen? ❑Yes No Describe: n.. Will the proposed action have outdoor lighting? ®Yes❑No If yes: i. Describe source(s), location(s),height of fixture(s),direction/aim,and proximity to nearest occupied structures: Security lighting,dark sky fixtures,street lights at±20ft and interior lighting.±85ft to Mouzon House main structure,and±83ft to the High Rock Condominiums. ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ❑Yes No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? ❑Yes No If Yes,describe possible sources,potential frequency and duration of odor emissions,and proximity to nearest occupied structures: p.Will the proposed action include any bulk storage of petroleum(combined capacity of over 1,100 gallons) ❑Yes®No or chemical products(185 gallons in above ground storage or an amount in underground storage)? If Yes: i. Product(s)to be stored ii. Volume(s) per unit time _ (e.g.,month,year) iii. Generally describe proposed storage facilities: q.Will the proposed action(commercial,industrial and recreational projects only)use pesticides(i.e.,herbicides, ❑Yes No insecticides)during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? ❑ Yes ❑No r.Will the proposed action(commercial or industrial projects only)involve or require the management or disposal ® Yes ❑No of solid waste(excluding hazardous materials)? If Yes: 1. Describe any solid waste(s)to be generated during construction or operation of the facility: • Construction: 20 tons per month (unit of time) O Operation: I tons per month (unit of time) ii. Describe any proposals for on-site minimization,recycling or reuse of materials to avoid disposal as solid waste: • Construction:Recycling of materials when feasible O Operation: Recycling iii. Proposed disposal methods/facilities for solid waste generated on-site: ✓ Construction: Removed per hauler's permit to approved construction debris facility ® Operation: Removed per hauler's permit to approved construction debris facility Page 8of 13 RESET FORM s.Does the proposed action include construction or modification of a solid waste management facility? 0 Yes® No If Yes: i. Type of management or handling of waste proposed for the site(e.g.,recycling or transfer station,composting,landfill,or other disposal activities): ii. Anticipated rate of disposal/processing: Tons/month,if transfer or other non-combustion/thermal treatment,or Tons/hour,if combustion or thermal treatment iii. If landfill,anticipated site life: years t.Will proposed action at the site involve the commercial generation,treatment,storage,or disposal of hazardous DYes 1No waste? If Yes: i. Name(s)of all hazardous wastes or constituents to be generated,handled or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii.Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization,recycling or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? ❑Yes❑No If Yes:provide name and location of facility: If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: E.Site and Setting of Proposed Action E.1.Land uses on and surrounding the project site a.Existing land uses. i. Check all uses that occur on,adjoining and near the project site. ® Urban 0 Industrial ® Commercial ® Residential(-Rilsturban) 0 Rural(non-farm) ❑ Forest 0 Agriculture ❑ Aquatic 1 Other(specify):Convention,hotel,municipal center,parks ii. If mix of uses,generally describe: The site is developed as urban,adjacent to mixed use areas. b.Land uses and covertypes on the project site. Land use or Current Acreage After Change Covertype Acreage Project Completion (Acres+/-) ® Roads,buildings,and other paved or impervious surfaces 1.96 1.66 -0.3 O Forested N/A N/A N/A ® Meadows,grasslands or brushlands(non- agricultural,including abandoned agricultural) NIA N/A N/A ® Agricultural N/A N/A N/A (includes active orchards,field,greenhouse etc.) O Surface water features (lakes,ponds,streams,rivers,etc.) N/A N/A N/A O Wetlands(freshwater or tidal) N/A N/A N/A o Non-vegetated(bare rock,earth or fill) • Other Describe: lawns/landscaping 0.66 0.9E +0.3 Page 9 of 13 RESET FORM c.Is the project site presently used by members of the community for public recreation? ❑Yes0No 1. If Yes:explain: d.Are there any facilities serving children,the elderly,people with disabilities(e.g.,schools,hospitals,licensed JYesDNo day care centers,or group homes)within 1500 feet of the project site? If Yes, 1. Identify Facilities: Lake Avenue Elementary School,Saratoga Springs Public Library,Children's Museum,Temple Sinai e.Does the project site contain an existing dam? []Yes®No If Yes: i. Dimensions of the dam and impoundment: • Dam height: feet • Dam length: feet • Surface area: acres • Volume impounded: gallons OR acre-feet ii. Dam's existing hazard classification: iii. Provide date and summarize results of last inspection: f.Has the project site ever been used as a municipal,commercial or industrial solid waste management facility, [,�YesJNo or does the project site adjoin property which is now,or was at one time,used as a solid waste management facility? If Yes: i. Has the facility been formally closed? []Yes❑ No o If yes,cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: iii. Describe any development constraints due to the prior solid waste activities: g.Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin Yes®No property which is now or was at one time used to commercially treat,store and/or dispose of hazardous waste? If Yes: r. Describe waste(s)handled and waste management activities,including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site,or have any 1Yes❑ No remedial actions been conducted at or adjacent to the proposed site? If Yes: 1. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site 1YesE]No Remediation database? Check all that apply: ® Yes--Spills Incidents database Provide DEC ID number(s): See attached ® Yes—Environmental Site Remediation database Provide DEC ID number(s): See attached [] Neither database ii. If site has been subject of RCRA corrective activities,describe control measures: NIA iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? YesDNo If yes,provide DEC ID number(s): #546036,V00300,Van Raalte Knitting Mill,#546015,Excelsior Gas Plant,#V00475,Lake Avenue Gas Plant iv. If yes to(i},(ii)or(iii)above,describe current status of site(s): Inactive or closed Page 10 of 13 RESET FORM v. Is the project site subject to an institutional control limiting property uses? Yes0No O If yes,DEC site ID number: O Describe the type of institutional control(e.g.,deed restriction or easement): O Describe any use limitations: O Describe any engineering controls: O Will the project affect the institutional or engineering controls in place? E]Yesd No O Explain: E.Z. Natural Resources On or Near Project Site a.What is the average depth to bedrock on the project site? 10± feet b.Are there bedrock outcroppings on the project site? []YesONo If Yes,what proportion of the site is comprised of bedrock outcroppings? c.Predominant soil type(s)present on project site: Peerfield loamy fine sand 80 % Galway loam(urban fill mixed) 20 % d. What is the average depth to the water table on the project site? Average: 5± feet e.Drainage status of project site soils:® Well Drained: 2%of site ® Moderately Well Drained: 10%of site ® Poorly Drained 88%of site f.Approximate proportion of proposed action site with slopes: ® 0-10%: 90 %of site ® 10-15%: 5 %of site j 15%or greater: 5 %of site g.Are there any unique geologic features on the project site? ❑Yes0No If Yes,describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies(including streams,rivers, OYes®No ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? EJYes®No If Yes to either i or ii,continue. If No,skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, DYesONo state or local agency? iv. For each identified regulated wetland and waterbody on the project site,provide the following information: • Streams: Name Classification • Lakes or Ponds: Name Classification ® Wetlands: Name Approximate Size ® Wetland No.(if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired :Wes ONo waterbodies? If yes,name of impaired water body/bodies and basis for listing as impaired: i.Is the project site in a designated Floodway? ❑Yes ONo j.Is the project site in the 100 year Floodplain? ]Yes®N° k.Is the project site in the 500 year Floodplain? Dyes[,INo I.Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer? E]Yes No If Yes: i. Name of aquifer: Page 1 1 of 13 RESET FORM m. Identify the predominant wildlife species that occupy or use the project site: Squirrels,bird species,chipmunks (typical urban open/paved area species) n.Does the project site contain a designated significant natural community? El Yes JNo If Yes: 1. Describe the habitaticommunity(composition,function,and basis for designation): ii. Source(s)of description or evaluation: iii. Extent of community/habitat: O Currently: acres 0 Following completion of project as proposed: acres o Gain or loss(indicate+or--): acres o.Does project site contain any species of plant or animal that is listed by the federal government or NYS as ❑YesIONo endangered or threatened,or does it contain any areas identified as habitat for an endangered or threatened species? p. Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of ❑Yes®No special concern? q.Is the project site or adjoining area currently used for hunting,trapping,fishing or shell fishing? DYes12:1No If yes,give a brief description of how the proposed action may affect that use: E.3. Designated Public Resources On or Near Project Site a.Is the project site,or any portion of it,located in a designated agricultural district certified pursuant to ❑Yes®No Agriculture and Markets Law,Article 25-AA,Section 303 and 304? If Yes, provide county plus district name/number: b.Are agricultural lands consisting of highly productive soils present? ❑Yes®No i. If Yes:acreage(s)on project site? ii. Source(s)of soil rating(s): c. Does the project site contain all or part of,or is it substantially contiguous to,a registered National ❑Yes®No Natural Landmark? If Yes: i. Nature of the natural landmark: ❑Biological Community ❑ Geological Feature ii. Provide brief description of landmark,including values behind designation and approximate size/extent: d.Is the project site located in or does it adjoin a state listed Critical Environmental Area? ❑„Yes®No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 12 of 13 RESET FORM e.Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district ®YesO No which is listed on,or has been nominated by the NYS Board of Historic Preservation for inclusion on,the State or National Register of Historic Places? If Yes: i. Nature of historic/archaeological resource: ❑Archaeological Site ®Historic Building or District ii. Name:Saratoga Broadway Historic District iii. Brief description of attributes on which listing is based: f.Is the project site,or any portion of it, located in or adjacent to an area designated as sensitive for ®Yes❑No archaeological sites on the NY State Historic Preservation Office(S IPO)archaeological site inventory? g.Have additional archaeological or historic site(s)or resources been identified on the project site? El Yes gNo If Yes: i.Describe possible resource(s): ii. Basis for identification: h.Is the project site within five miles of any officially designated and publicly accessible federal,state,or local 1Yes❑No scenic or aesthetic resource? (Non visible to this site) If Yes: i. Identify resource:Saratoga Springs Open Space Plan Resources 2002 ii.Nature of,or basis for,designation(e.g.,established highway overlook,state or local park,state historic trail or scenic byway, etc.): Saratoga Springs Open Space Resources 2003 iii. Distance between project and resource: 1.4-5.0 miles. i. Is the project site located within a designated river corridor under the Wild,Scenic and Recreational Rivers ❑Yes®No Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? ❑Yes❑No F.Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal,please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name Meg Kelly Date 12/10/2018 Signature ialLey- Title Mayor,City of Saratoga Springs PRINT FORM Page 13 of 13 RESET FORM Section E.1/h.i NYSDEC spills on or adjacent to site: O Spill #8707124 O Spill #9406795 O Spill #9409105 ✓ Spill #800132 O Spill #912056 o Spill #1301102 ® Spilt #1303854 O Spill #9002794 O Spill #9707195 O Spill #9811146 O Spill #0280056 O Spill #0311831 O Spill #0409441 ® Spill #0612044 O Spill #1002807 O Spill #1003277 o Spill #9209208 O Spill #9808262 NYSDEC remediation sites within 2000 feet of site: O Site 546036: Van Raalte Knitting Mill • Site V00300: Van Raalte Knitting Mitt ® Site 546015: Saratoga Springs Excelsior St Manufacture Gas Plant Site V00475: Saratoga Springs Lake Ave Manufacture Gas Plant