Loading...
HomeMy WebLinkAbout20181055 96-110 Ballston Ave Townhome Project Engineering Comments 4-7-20 anon o�dice April 7, 2020 Michael Veitch, Business Manager City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 Re: 96-110 Ballston Avenue Townhouse project Engineering Review—Third comment letter File: 539.047.001 Dear Mr. Veitch • Barton & Loguidice, D.P.C. (B&L) has completed a review of the following reports and information for the Ballston Avenue Townhouse project located at 96-116 Ballston Avenue as prepared by Environmental Design Partnership, LLP (EDP): • EDP Response letter dated March, 13, 2020—City Engineering Department Comments: • EDP Response letter dated March 13, 2020—CDE and City Comments: • Plan Set(13 Sheets) dated November 5,2018, last revised January 18, 2020; • Stormwater Management Narrative, last revised January 2020 • SWPPP, dated revised January 2020 • Full Environmental Assessment Form • NYSDEC Letter Of No Jurisdiction Endangered Species Act letter dated December 19, 2018 • NYSOPRHP letter of no effect dated December 20, 2018 • Construction estimate This review was conducted on behalf of the City of Saratoga Springs. The above referenced documents and information were reviewed only with respect to our scope outlined in our task order/proposal. General 1. We recommend submission of easement language to City Engineering and City Attorney's office well ahead of planned construction to allow time for their review and approval. 2. Provide hold harmless clauses in easement language that protects the city of Saratoga Springs for not being responsible for porous pavement system including stone sub-base, underdrains, pavement system, driveways and any and all surface improvements if they have to repair sewer or water system infrastructure. Water and Sanitary Sewer 1. Coordinate with the city on brand, type and location of water meters. The experience to listen. 10 Airline Drive•Suite 200•Albany,New York 12205 solve. Telephone:518-218-1801•Facsimile:518-218-1805•www.BartonandLoguidice.com The power to 4%. Michael Veitch, Business Manager 1 [ 4 City of Saratoga Springs April 7, 2020 Page 2of2 2. All water and sewer system components shall be tested to the requirements and satisfaction of the city. Stormwater Management Narrative 1. In section 1.0 change unit of stated total storage volume from acres to presumably acre-feet. Please confirm. 2. Section 4.0 discusses compost amendments to improve vegetation growth and health. Given the well-drained nature of the existing sands this will be important to notate on the plans and ensure the SWPPP monitoring professional and constructions crews implement it. Please add this requirement to the plans. 3. The values of drainage areas in section 5.3 for porous areas 1-3 appears to be 1.047 acres instead of 0.87 acres. The second paragraph in this section does not state the total storage volume in the last sentence. Plans Sheet 8 of 13 Planting Plan 1. The revised Planting plan did not provide the two redbud and two Dogwood trees as commented on by the City Arborist. Three Redbud trees are shown instead. Please coordinate further with City Arborist. 2. The London Plane tree proposed at Finley Street is a hybrid version of a Sycamore and hardy in zones 5-9. Confirm this selection with the City Arborist as it grows quite high and its hardiness could be marginal. If you have any questions please contact us. Sincerely yours, BARTON &LOGUIDICE, D.P.C. J 2LL/ Bradley D. Grant Senior Project Manager BDG/tms Cc via e-mail-Kari Donohue