Loading...
HomeMy WebLinkAbout20200205 Kaydeross Ave East Conservation Sub Application f�oR o�Fice us�l '� � I ,� � `'% CITY OF SARATOGA SPRINGS �� ��� � (Applic�atian ts) � t: � Plan n i ng Board �,�'�`'�. � CITY HALL-474 BROADWAY �_�:`� SARATOGA SPRINGS, NEW YORK 12$6G-229fi (�ate received) ,, TE�: 518-587-3550. FAX: 518-580-9480 HTTP:/NVWVV.SARATOGA-SPRINGS.ORG APPLICATION FOR: SUBDIVISION APPROVAL {Rev: 8/8/19) '�**Application Check List - All submissians must include compfeted appl�cation check I�st and all required items. H/�NDWRITTEN APPLICA�`fONS W�LL NOT BE ACCEPTEDI'���` Pro�ect t�ame: ��Y�eross A�en�e East Conservation Subdivision Property Address/Lacation: 227 ��yderQ55 AVf:lIU� EaS� Tax Parce�#� � �2.-�-1 OI192.-'(-�9 Zoning District: R�-� r Rural Residential (for example: 165.52-4-37) TotaP Acres: 7�'87 Land to be 5ubdivided Into: � � Lots APPLlCANT(S)'" OWNER�S��If npt apqlicant,� ATTpRNEY/AGENT Name 2�7 Kaydeross Ave., Inc. Same The LA Group, PC Address 43 Edgewater Drive, Dunedin, Ff 34698 40 Long Afley, Saratoga Springs, NY Phone �7�7) �08-3083 (518} 587-8100 Ema�� ken a�}carnillecourt.ca dhefler@thelagroup.com �denfify primary contack persan: ❑ Applicant ❑ Owne� 8 Agent ''An applfcant must be the property owner, less��, ar one with an optian ta lease or purchase the property in question. Application Fee: A check for the total amount below payable to "Commission�r of Finance" MUST accampany this app�ication. ❑ Sketch Plan -5340 Q Prelimi_n__ary Subdivision PEat Approual 1-9 �ots 5600 51+ 5�,546 �a-�� �.ots �saa 3,000 26-50 Lots 51,200 Fee submitted $ � F�nal Subdivision Plat Appro�al 3 �Do Residential - �1,200 plus S12Q/lot � + Non-Residential - $1,800/1ot � ❑ Final Approval Madifica�ion Resider�tial- � �30Q � Nan-Residentiaf- S5b0 � Submission Deadline- Check City's websiEe (www.sarato a-s rin s.or ) for meeting dates. Does any City officer, Does ar�y City officer, employee or far-nily member thereaf have a financial inter�:st (as defir�ed by General Municipal Law Section 8Q9} in this app€ication? YES NO X (f YES, a statem�nt disclosing the nar�e, residence, nature and extent af this interest must be fiied with thfs appfication. I, the undersigned owner or purchaser under contract for the property, hereby request Subdivisinn consideration by the Planning Board for the i�en�ified property above I agree to meet all requirements under the Subdivision Regulatior�s for the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and desfgn�ted City sta€f to enter ihe property associated with this applieation for purposes of conductir�g any necessary site inspections relating to this application. Applicant Signatiure �7 � ��� ate /,( � 2G�c� If applicant is not current owner, owner must also sfgn. Qwner Signature: Date: jF�R�FFICE USE� ���,;;i C I TY OF SARAT�GA S PRINGS �,�' `;. fEwPi��nor,#� '�1� ''r. PLANNING B�ARD ' ( y - A i '- Date received - ` � � City Hall-474 Braadway �'�';�� Sarataga 5prings, New York 12866-2296 ' • Te1:518-587-3550 fax:518-584-9480 =•-,��,;;-::. � http://www.saratoga-springs.org Re�.08f2019 PRELIMfNARY� F�NAL SIJBD�VIS�QN APPRC�VAL REQUIRED SUBMITT'AL CHECKLIST (. Pro�e�t Name: Kaydeross A�enue East Conservation 5uhdi�ision 2. Checklist Prepared By: The�4�roup, Pc Date: 0 311 612 0 2 0 Listed helow are the minimum su6mittal requirements as set forth in The City of Saratoga Springs' Su6division Regulations. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist helow and provide with your su6mission. REQUIRE❑ ITEMS: �`3 hard copies and 1 digital copy of ALL materials are required. CHECK EACH ITEM '��HANDWRITTEN�PPLICATI�NS WILL NC)T BE ACCEPTED** � I. Cvmpleted Subdi�ision Application (2 hard copies-�I w/vriginal signature-and I digital) and Fee � 2. SEQR En�ironmental Assessment Form-short or long form as required by action. � 3. Set vf plans including: (2J large scale plans (sheets must 6e 24" x 36", drawn tv a scale of nvt more than I"=5�feetJ. �ne digital�ersion of all su6mittal items (pdf�shall 6e prv�ided. � 4. Basic or Full 5torm Water Pvllution Pre�ention Plan as required per City Code Chapter 242. � 5. Cvpy of signed DPW water connection agreement for all projects in�ol�ing new water connectivns to the City system � 6. Engineering Repvrt for Water and Sanitary � 7. Camplete Streets Checklist � $. Project Cost Estimate-Quantities af wvrk items and estimate of costs REQUIRED ITEMS UI'J SUBDMSIUN PLAT,AS APPLICABLE: � I. Name of Subdi�ision 3. Property line survey prepared by a licensed land surveyvr. 5u6di�ision plat must reference such survey � with all corners set and marked on plan. Reference NGVD I 929 datum. A copy of the original properry survey must also 6e included. � 4. North arrow and map scale City of Saratoga Springs Subdi�ision Checklist 1 � 5. Parcel tax map num6er � 6. 5ite locatian map � 7. 5ite�iciniry map (all features within 3�0 feet of property} � 8. Identificativn of current zoning with cvrresponding area requirements � 9. Building set6ack lines, either listed or shown on plans � I�. Title 61ock with su6di�ision name; name and address vf applicant;and name and address of property nwner{if different} � I I. Name, address and phone number of su6di�ision surveyvr and/or engineer � I 2. Names of all adjacent property owners within 30�feet (include 6oth sides of streetJ � I 3. Identificativn of size, ele�ations, material,and slopes vf all existing and prvpvsed utilities within 40�ft of site. � 14. Parcel street address(existing and any proposed postal addresses} Yes rvo rv1A I 5. Identificativn of existing or proposed easements, co�enants or legal rights-of-way on this property � ❑ ❑ � � � I 6. References to all privr�ariances ❑r special use permits � � � 17. Existing and proposed contours and spvt grades (at 2 fvot intervals) � ❑ ❑ 18. Identificativn of all watercourses,designated State wetlands, 6uffers, Federal wetlands, flvvdplains, rock outcroppings,etc. � ❑ ❑ I 9. Identificativn of all existing or proposed sidewalks or pedestrian paths [show type, size and condition of existing sidewalks} � ❑ ❑ 2�. Lvcation, design specifications and construction material for all proposed site impro�ements (drains, cul�erts, retaining walls, 6erms, fences, etc.J � � � 21. Lvcation and distance to fire hydrant � � � 22. Erosion and sediment contrvl plan—including designated concrete truck washout area � � � 23. Approximate locativn, dimensions and areas for proposed lots and proposed public recreational land � � � 24. Propvsal for utility systems and lateral connections � � � 25. Lvcation and width of proposed streets City of Saratoga Springs Subdi�ision Checklist � City of Saratvga Springs �:omplete Streets Checklist Saratoqa 5prinps Cam��ete Street Policv Visinn �May 20'12y The City of 5arataga 5prrngs Complefe Sfreets Palrcy wrll enGQurage fhe developmer�f of a complete s�reefs netwark throughout the Cify to create a mQre balanced fransparfafion system. The Poricy shal!be consisfent with and assisf in achreving the goals and recammendatrons set forfh in fhe City's Comprehensive Plan and otherpalicy documents. 7he Policy sha11 errsure new and updafed public and privafie prvjects are pranrred, desrgned, maintained and aperated to ena6fe safer, �omfartable and canvenient travel fQ the greatesf exfenf pQssible far users of all a6rlitres irrcludrng pedestrians, bicyclists, motorists and transrf riders. This �hecklist is intended to assist the City in achieving its visian far complete streets. Project Name: Kaydeross A�enue East Conservation Subdivision �at�: 0311fi1202d Project Location � Limits: 227 Kaydeross Avenue East Project Description: Proposed 15 lot clustered subdi�ision with land placed in a conservation easement Instru�tions: For each box che�ked, please pro�ide a brief description for how the item is addressed, not addressed, or not applicable and in�lude supporting documentation. Street Classificatian identi street or streets within the ro�ect area Prin�ipal arterial ❑ Minor arterial ❑ Mixed use collector ❑ Mixed use local ❑ Residential �ollector ❑ Residential lo�al ■❑ S e�ial use street ❑ EXISTING C�NDITIDNS Item to Be Addressed! Checklist Consideration YES ND N1A Re uired ❑escri tion Existin Bic c1e & Pedestriarr O erations ❑o bicycle and pedestrian a�commodations exist? {see page 2 far x examples} Existin Transif� erafions ❑o transit facilities exist within the study area, in�luding bus and x train stopslstations? Is the proje�t area on a transit route? (C�TA 5ervi�e Routes) x Are there bicycle racks, shelters, or parking for transit riders x a�ailahle? Existin Access and Mobili ❑o connective opportunities exist with schools, hospitals, senior x �are or communiry�enters or persons with disahilities within ro�ect area? Are there gaps inhibiting continuous ac�ess between schools, ❑ ❑ 0 hospitals, senior care, or communiry centers or persons with disahilities within ro�ect area?" Pra'e�f Area Context Are there prominent landmarks, recreation, shopping, employment ❑ 0 ❑ �enter, cultural centers or other key destinations that offer 0 ortunities to canne�t this site? Please list andlor describe planning or policy documents addressing bicyclist, pedestrian, transit, or truckl freight use for the proje�t area. Examples can include: Citv of 5aratoqa 5qrinqs Comprehensive Plan, City of Saratoga 5prinqs �pen 5pa�e Plan, Capital District Transqartation Committee Bicy�le!Pedestrian Priaritv Netwark, Citv 5tandard Details, et�. City of Saratoga Springs Open space Resources Plan 2002 City of Sarataga Springs Complete Streets Checklist 1 PROP�SE❑ ❑ESIGM Item to Be Addressedl Checklist CQnsMde�atron YE5 NO N!R Re uired ❑es�ri tion C❑m ►ete Streets Desi n Bic clist ac�ommadations? ❑ 0 ❑ Pedestrian a�cammadations? � � � Nature trail through conservation open space A�cess and Ma�ili ac�ammadatians? ❑ 0 ❑ Transit a�cammodatians? ❑ 0 ❑ Truckl trei ht a�cammadations? ❑ 0 ❑ Streets�a e elements? ❑ 0 ❑ Bike Facilities: OfF-roadway bike ■❑Yes ❑No❑NA accommodatians �edestrian F�cilities: Dedicated hike lane ❑Yes ❑■No❑NA Sidewalks an b�th sides af ❑ Yes D�a❑NA 5hared-use lane ❑Yes ❑■No❑NA the street 5houlder ■❑Yes ❑No❑NA Stri ed crosswalks ❑ Yes❑No❑■NA Ac�eptable actuated traffic ❑Yes ❑No❑■NA Geometric modifications ❑ Yes❑No❑■NA signal bike detection, including to reduce crossing turn lanes distances such as curb Do signals allow adequate ❑Yes ❑No❑■NA extensions (e.g. bulb-outs} minimum green time for Acceptable pro�ision for Yes No ■NA bi�y�list to safely cross pedestrian traffic signal intersection? features(e.g. ped. buttons) 5ignage and pa�ement ❑Yes ❑No❑■NA Pedestrian signage for Yes ■No NA markings specifi�to proposed �rossing &wa�nding bike fa�ilities Safety islandslmedians on Yes No ■NA Bic �le safe inlet rates Yes No ■NA roadways with two or more Bicy�le parking, eg. bike racks, Yes No ■NA traffic lanes in each dire�tion bike lo�kers Enhan�ed supplemental ❑ Yes❑■No❑NA Transit Facilities: pedestrian treatments at Transit shelters Yes Na ■NA un�ontrolled marked Bus turnauts ❑Yes ❑No❑■NA �rassin s 5tandin ads ❑Yes ❑No❑■NA �Qnnectivi : Are there prapased ❑ Yes ❑■Na❑NA Has CDTA been canta�ted? ❑Yes ❑■No ❑NA �onnections to other hike Aceess and Mobilit Facilities: paths, pedestrian fa�ilities, or Adequate sidewalk ar paved ❑Yes ❑No ❑■NA transit facilities? path Are there proposed ❑ Yes❑No❑■NA Ac�eptable Yes No ■NA �onnections to any key considerationlpro�ision for destinations listed on a e 1? accessible pedestrian traffic Are there proposed ❑ Yes❑■No❑NA signal features �onnections to Curb ramps, including Yes No ■NA nei hborhaods? detectable warning Streetsca e Elements: surFa�e Are streetscape elements ■❑ Yes❑No❑NA Ac�eptable slope and ❑Yes ❑No❑■NA proposed such as cross-slope for driveway ramps, landscaping, street trees, sidewalks, crossin s lanters, buffer stri s, etc? Have confli�ts been redu�ed ❑Yes ❑ No ❑■ NA Pedestrian-le�el lighting ❑ Yes❑■No❑NA among pedestrian, bicyclists, and motor vehicles (a�cess Public seatin or benches ❑ Yes❑■No❑NA mana ement ? Desf n Standards and Guidefines ❑esign meets guidelines such as des�ribed helow for ❑ Yes ❑No ❑■NA ❑es�ribe bic �lel edestrianlbus/transit facilities? "Ameriean Associatian af 5tate Highway and Transpartation Dfficials{AASHTa}-A Poficy on Geometric�esign of Hrghway anri Streets, Guirie for the Devefopment of Br�ycle Fa�rlities and AASHT�Gcrrde for the Pfarmrng,Desrgn,and Dperation of Pedestrian Facrfrtres;Pcrblic Rraf�t-of-Wav Rccess�b�Jitv Gt�ide[PROWAG);11?�rau�l on Llr�iform Traffie Cofrtro!Devrces f h1UTCD);Arnericar�s with�isabiFitres Aci HccessibiFitv GcrideJir�es fADAAGI; National Assaciation of City Transportatian aificials{NACT�y-Clrbaf�8ikew�v Desran Guicle. New Yark 5tate�epartment of Transportation— Ni hwa Desi n A?ant�al City of Sarataga 5prings Complete 5treets Checklist 2 �. �1a�A s� C�ty of S�aratvga Springs �'����'.�C�°��° �, .� lO co��rssr��z� �- ��� UFFICE OF PL,�BLIC '4�'O�S � ,� w TiMOTHYI.COGAN ` �`� '� 5 LaI{C A�'CIIU2 DL•:PLTi'Y CO:vLyfFSSION'tP. � � - _ � 4aratogx�}�rin�s,�1ew York 12866 �— l��f ,� � > >,;'"+:1 7 :, � �`��i.�s� Phane 518-587-3554 ** �'as SIS-587-2417 /��0'�FCRaT�c `�`y �vw.sarato�a-springs.org NEW WATER SE�2��CE C014'NEC'T�O� �GREEiVI�NT & API�LICAT���FOI�l1-7 227 Kayderass Ave., �I1C. Kayce�ossAveEastS�bdivis�an Froperty O�n�ner's �Iame: Praject�a�nc(if applicabte}: 227 Kaydeross Avenue East Taac Ma # 192.-1-101�92.-1-39 �roperiy �adress: P� � Size of Tap (check ooe below}: ��/a�' �'9 reater than 1" unit nf water shal� be c�efined as fnurteen thousa�d(1�,OaQ}cubzG fee� � af warer per year. Cnntact t�e Water Dept at ext. 2502 for assistance with wa�er use estimation anci meter specifications before signing be4aw. 14 new 3p�a�gg i;�i�er af Dwellings: Estimated Cubic Feet of Water per Year: Ta be compieted in full witkout any contingencies or protest, os� or be:fc�re tt�e Building Tnspector approva� of the rou�h piumbing, including the instalIatian afthe water meter,or at the tirne nf the issuance of a tappin�psrmit. The nndersigned repz-esenEs to the City that they have futl and complete autharity tn execute this document and find and commit the developes to abide by the City�iJater Ordinance. This agreement shalt be bindin�on all of tEie undersigned transferees. `Fh.e undersigned acknawledges that a copy of this ciocument will be delivered to a1f appzopriate azd necessary governtnental antities. � �- �" �� - 227 Kaydeross �+;ve., Inc. Authorized Szgraature: -�' ' ---�/� - - Company Narate: �'Edgewater Drive, Duned�n, FI 34698 Compaz�y�A�ddress: �'hone Number: (727) �08-3Q$3 Fax Number: Date; '� � ... ............. ............__ ........,.,.. ........ _ ........ .............. Department of Pub�ic «�"orks 11p�roval: Date: Feclf E�ti�iranr�rejatalfC.rses•s�snefrt Fvrrar Ptrr�t] - Praje�t crrrd Settilzg Instructians for Completin� Part 1 Part 1 is to be completeci by tl�e ap�lica��f or• project sponsor. Responses becoFne part of the application for approval or fundiFl��. are s�ibjcct io p�fblic revie��-, �nd ma��be subject to further verification. Complete Part 1 based o�z ii�fot7nation current�.� available. [f additional rc:search or inwesti�ation would bc s�eeded tn fiil�y respond to any item.please answer as tl�oroughly as pc�ssible b�sed on et�rrent it�formatian; indicate��-1lether missing ic7Ccani7�ition dcaes nat exist, or is not rease�navly �vailable to th�spor7�c�r;aFid,�vhen possi6fe,�e:nerally describe work or studies e�hich �voulcl be necessary to upd�te or failly deve[c�p that infortnation. Applicantsispansors ittust cnanplete all items in Sectians A & B. in 5ectioi�s C, D& E,anost iteins contait� an ic�itia] question that must be ans�vered either"Yes''or"No". I f the ans���er to the i�litial qs�esti�n rs'`Yes'",complete the sub-qucstiorls that follo�v. If the a��s�ver to the initial c�uestion is"No",proceed to the next qucstion. 5ectic�n F allaws the project spot�sor to identify a�d attach any additionai inforn�atian. S�ction G requires tf�e name and signature of tl�e applicant ar project s�onsvr to verify that the inforn�atic�n eontained in Part �is accurate and complete. A. Project and Applicant/Spnnsar Infarmation. i'v'ame ofActioi� Qr Project: Kaydeross Avenue East Conservation Subdivision � Project Location{dzscr€be, and attach a gen�ral location n�ap): 227 Kaydeross Avenue East.Saratoga Springs Brief I?escripti�tt of Prope�sed Action (include purpose or�ieed): The propased corts�rvation subdtvision invoives the subd€vision af approximatefy 79 acres ot&and �nto 15 residential buiPding lots iF�at include on-site septic systems. The lots wiPl connect to an extension of the Cfty of Saratoga Springs water system. The prapased lots will be cluskered to allow a large porEion of the undevefoped fand to be placed in a conservation easement. Nan�e of Applicant/Sponsor: Te�ephone: t72��608-3083 227 KayderossAve., Inc. r-�a��� ken@carnillecourt.ca AddreSs: 43 Edgewater Drive City/P0: �unedin State:Florida Zip Code=34698 Project Contact (ifnot sa4ne as spansor;�ive na�ne and titlelrole): Te[ephone: FCenneth Scott,President �_����: Address: Same CityiPO: State: Zip C:ode: Propecty Uwner (if not same as sponsor); relephone: Same E-Mail: Address: City/P0: State: �ip Code: Page I of 13 B. Governme�it .Ap�ro��als B. Governme�nt Ap��rovals, Funding, or SponsQrshi�r.�("Puudii��" ii7eaud�s grants, �oans,tax relief.and any oCher fonns of financial assistance.} Ga��eenrncr�t Cntity If Yes: Identify Age��cy anci Approval(s) App[ication Date Requirecf (Actual or proJeeted) a. C.ity Cou��sel, Ca���n F3oard, ❑Yes�No ar ViIlage Board of"I�rtistees b. City�,�I'o��°n or Vi�lage �Yes[�\o �o�S�Nation 5ubdivision approval Plar�ning Board ar Co�nnzission c. Cit�y�, -1'o�vn or �YesmNa Vi�lage Z.oning Boart�of Appeals d. Other �ocal a�encies ❑Y"es�'�o e. C��unt}� agencies DYcs[�JNo f. Re�?ional agencies �YesQ�l�o �. State agencies ❑YeS�No NYS DOH, Realty Subdivision Submit, May 2020 NYS DEC.5ection 401 Water Quaft Certificatian Granted January 2020 h. Federal agencies [,7]Yes�Nc� ACOE, rVationwide Permit September,2d19/Granted C}ecember,2019 i. Coastal Resourees. i. Is thc pro.ject site within a Coastal Area,or the waterfront area af a Designated Itlland WaCerrvay? QYes�No ii. Is the pro.ject site ]ocatec� in a community with an approved Loca� Waterfront Revitaliz�tion Program? ❑YesC+�I�Io rri. ]s the project site���itlain a Coastal F_rosion Hazard Area? ❑Yes�No C. Planning and Zonin�; C.1. Pianning and zoning actiUn�. � Wi7l acin�i��istrative or ]e�islative adoption,or aulendiner�t of a plan, lacal law. ordinance,rule ar regulation be ti�e ❑Y�s�?�o only approval(s)�aI�ich must be granted to enable the proposed action to prnceed? • Cf Yes,eoinplete sectiorts C, F and G. • If:�`o, proceed to question C.2 a�d co�nplete a[I r��nab��ing secrions ant�questicrns �in Part 1 C.2. Adopted ta►�d use pians. a. Do an���nunicipafly-�dopted (city,tow�,village ar county)cocnprehe€Zsive land use plan(s) include the site �Yes❑1�o w}�ere t]Ze propose� action w€�uld be]oc�ted? ]f Yes,does the cornprehensive plan include specific recom���endaPiorrs far the site where the propnsed action ❑YesIZ1No would be �ocated? b. Is the site of`the propased actron���ithin any local or re�ional special plarrning district{for example: Green�vay, �Yes❑\o Bra�unfield Op�ortunity Area(BOA}; cfestg��ated State or Federal heritage area;watershed management plan; or other"�) ���� If Yes, idei�t�ify the plan(s): t�YS Her�tage Areas:Mohawk Valley Fferifage Corridor c. Es th� propased action l�cated �vlta�lv or partially wi�hin an area listed in an adopted municipal open space plan, �YesQNo or an adapted m��nicipal f��Ynland pratectia��p�an`1 If Yes, idei�tify[he�ptan(s}: Cft_v of 5arato�a S�rings O�en Space Resourees Plan 2002. The parcels are locaked_in an Aqricult�ral Neritaqe area and along a: Rural Road Cearridar,proposed Bike Route and propased Pedestrian Trail. Page 2 of 13 C.3. Coning a. Is tE�e sitc:of tl�e pi•oposed action located in a �T�u��icFpality tvith an a�c�pte� ronin� law ar ot�dinance. �Yes❑i�lo If Yes, whaT is the zonir�g classification(s) i�lcluding an_y a�plieable averlay c�istrict`? RR-'i, Rural Residential b. Es thc use pen»itted or allo�a-ed bv a special or conditional t�se pc�-mit? �Yes❑'vo c. Is a -r_anin�;ch�ngc reqt�ested as part afthe�Sroposed action? ❑Ycs��c� If Yes, r, Wl�at is the praposed nc�v zoning for the site? C.4. Existing community services. a. tn what schooi district is ihe prc�ject site located? City of Satatoga 5prings b. What po9ice or other pubtic protection forces serve the project site? Saratoqa Springs Police De�artmeni _______ ____ _ c. 1h'hich tire protcctron and en�er�ency tnedieal services serve the project site? SaraEoga Springs fire Depsrtmant d. W'l�at parks serve the project site? The closesf park is WaterFront Park on Crescent Avenue D. Project Details D.l. Propose� and Potential lleveEo�ment a. What is the genera] F�ature of�i�e pro�aseci action(e.g.,residential, industrial, cUnamercial, recreational; if mixed, include afl cotnp�nents)? Residentiaf b. a. "�otal acrea<�e o#tf�e site of the proposed acti�n? 78.87 acres b. Total acre��gc to be physically disturbed? i4.o acres c. Total acrcage(project site and any co��ti�uous properties)owne� or controlled by the app(icanc ar project sponsor? 78.87 acres c. Is the proposed action an expar�siQn�f an existing pr�aject or use? ❑Yes�No i. [f Yes, u�hat is the a}�proxin�a�te per�entage of t��e proposed eapansion and idetttify the units(e.�.,acres, miles, kiousine units, square feet)? % lJnits: d. Is t}ie proposed action a sut�division, or does it inelude a subdivisi�n° �Yes❑No I f Yes, i. Purpose ar type of sLFbdivisian?(e.�., residential, ind�tstrial,cc�mrnerciai; if mixed,specify types) Residential ii. Is a cluster/eonsen�at�on layout propased? �Yes�No rrr. �Iumber of lots proposeci? 15 iti�. N[inimi�m and n�aximum propased Fot sizes? Miniinu��1 Maximutn e. Wil7 the propc�sec� action be constructed in rnultiple phases'? ❑Yes�]No i. If No,anticipate� period of cc�nstt-uctton: 48 n�c�ntl�s rr. If Yes: • Total n�r�lbe�-of phases anticipated • Anticipafed commencen�ey�t date af }�hase 1 (including dei�aolition) month year • Anticipa[ed co�npletion daze of final �ahase �7ionth _��ear • Generally describe connections or relationships among plzases, inc[uding any ca�rtin��encies where progress of one phase rnay deterrnine Eiming or duratian of future phases: _ __ Page 3 of 13 #�. �oes the�rt7jcct incl�de ne��� resideutial uses? �Ycs��io If Yes, show numbcrs of�Fnits prc�posed. C?ne Hainilv 7'wo Fan�ilv 'I"hree Familv Multiple Famil� fo�r or rnore ]nitia] Phase 15 At cornplction � -- �W-- of all phases 15 �. Does tl�e propos�d action include ne�v non-residential consiruction (incltFding expansions)? �Yes�\o If Yes, i. To4al ntin�be�•of stn:ctures ri. Dimensious (in fect)of�ar�est proposed structure: height; width; and len�th — — ---- iii. Approri�i�ate exte��t of buildii��space tc� t�e I�eated ar cooled: _ squas-e feet h. Does the proposed act'ron include construct�on or other activities that will result in the impaui�dme��t of any ❑Yes��o �ic�uids, stich as creatia��of a �vater supply,reservoir.poa�d, lake, waste lagoon or other storage? ]f Y es, i, Purp€�se of the iinpo��ndrnent: ii If'a �v�ter iCnpoundtnent,the princi�al soiarce oFthe water: ❑ Ground �v�ter�Stirface v��ater strcar��s ❑Other specify: iri. ff other than water, identify the type of impc�undedAcontained ]iquids and their source. �_ .____ �___� __ iv Apprari�nate size ofthe}�roposed impoundment. Vol�n�ie; �nillion�alloi�s; st�rface area: acres r Diinensions of the prop�sed dam or impoundin�structure: hei�ht; length ti�i. Co��struetias3 methodlmaterials for the proposed dam or inipounding structure(e.g., earih fili,rack, wood.concrete): D.2. Praject Operations a. llnes ttte proposed action include am�e?ccavation,mining,or dredging,cluring cc�nstructicsn, operations,or botE1? �Yes�ti�o (Not including general site p��eparation,grading or i�7staIlation of utilities or foundations where al[ excavated materials wil€rernain or�site} If Yes: i.WhaT is the purpose of rhe e�cavation or dred�in�'? ii. Edow nil�ch rnate�•ial (including rock, ca��ih, s�diments,etc.) is proposed to be removed fi•oni the sita? • Volumc(specifi�tons or eubic yarc�s): _ • Over what duration af ti�nc`? ---______ iii. Describe nature a��d characteristics of materials to be excavated or dredged,ancf plans to use,�iiariage or dispose�f then�. il�. Will there be onsite dewatering or processing of excavated materials? Yes No Ifyes,de�scribe. __.___—_ v. What is thc total area to be c�redged or etcavated? acres 1•i. What is the anaximum aeea to be�n;�orked�t any one t�rne? acres vri. Whai�vot�ld be tlie�na�imuin deptl7 ot exc�4�acican or dredging? feet viii. Will the exeavation E•equire blastin�'? �Y�sQNo rx. Sum�narizc sitc recla��7ation�oals a���ci pian: _ b. ��Vould the proposcd action cause or result in alteration af, increase os�decrease in size of,or encroachinent �Yes�No into any existin�wefland,���aterbod��,shoreline,beach or adjacer�t area? If Yes: r [dentify the wetland or ti��aterbady�which wolild be af�ectr�d (by�����e, watei-ia�dex number,wet(and map rzuinhcr or geo�raphic c�escription}: unnarned wetfand�Cl_as_s C Stream (ID#941-127 1L�__� .—..____.— —�_—_-- Page 4 of 13 ii. Describe ho�� t��e pz�aposed actio;l�vould atfect thai ���aterbc�dy or wetfand,e.g. excavation, fili. placeir�ent c�f structures. or alteration of cha�anels, bat�ks and shoreiines. fnciic.ate�xtent of activities, a�teraiions and addit'ro��s i�7 squar2 feet or acres: Installation of pipe arcF� culvert_wil_I involve 74 cubic yards of fill below the ordinan+ mean high water elevatia_n_and ihe finished road wiil disi�rb appraximately 2,620 sf of wetiand area. — ------ �_ — � � rii 114'il� the proposcd acti«r� eause or restiilt in disturbance ta bottom sed�inents? ❑Yes�No If Yes, descz�i�e: rv. Will tl�e proposed aciion cause ar��esult in the destruciian or removal of aquatic ve�etatF�i�`? ❑Yes@�o If Yes: • acres of ac��iatic ve�?etati�n proposed tn be removed: __._ _.___ _ __-- -- --- • e�pected acrea�e of aquatic vegetatian remaining after�roject co��lpletia«: • purpose o�pra�osec� remo��al (e.�. beach cleariaig, invasive species control, boat access): ___ —�___ __ _ • prGposed tttethac� of plant remova�: _ ____ • if che�nical/herbicide treatment wil� be used, specify prod«ct(s): 1-�. Describe ar�y proposed reclamatiooimitination f�ollowing disturbance: c. Will the proposed action use.or cre�te a ne�v deanand for�i�ater? �Yes❑No 1 f Yes: r. Tota] anticipated 4aater usage!demattd perday: __ _ __ 6�6p �allons/day ii. Wi1�the proposed action obtain�V�ater from an existing public�ti�ater supply`? �Yes�i`a If Yes: • Name of di�Crict or service area: City of Saratoga Springs _�_ _� • Does tlze existing public water supply� E�ave capacitv to serve the proposal? �YesO No • Is the praject site in the existin�district:' ��Yes❑No • Is expansion of the dis�rict �eeded? ❑Yes�I�o • Do existing lines serve the project site`' �Yes�No iii. Wi�l linc extei7sion�viitlin an cristie�g district be necessary to supply the prajecY? �Yes❑No It Yes: • Describe extensians or capacity expausions proposed to serve this projecE: _ __ The exCension wil�cansist of a 8"DIP water main th�t will connect at the intersectioR of the proposed road and Kaydeross Ave East. • Saurce(s)of s��pp[y for the distr�ct: ir. Is a new water supply district or service area propasec� fo be forn�ed to serve the project site? ❑ Yes�No If=Yes: • Applicant/sponsor for ne�� districF: -__ __ _ _ __ ---- - • Date a�plication sub�nitted or anticipated: _ _ • Praposed source(s)of supply for new district: i•. If a public�vater supply will not be usc:d,describe plans ta provide water supply for the project: t�i. Ifwater suppl�� titi�ili be from wells(public or private),what is tl�e maximutn pumping capacit�r: ga[lonslminute. T d. Will the proposed action generate liquid�i-astes? �Yes[]No [f Yes: r. Total anticipated liquid��aste generation per day: ____6,160 �allons/day ii. Natw�e af liquic� �vastes ta be�enerated (e.g., sanitary wastewater, industrial; if comt�inatian, describe all com�onents and �ppro�i�nate vo[tzrnes or proportions of each): — --_ ____ Residential sanitary wastewater iir, Will the proposed action use any e�isting public waste���ater tr�atment facilities? ❑Yes�No If Yes: � Name of wastewater treat�ner�t plant to be used: • 4ame of district: • Daes the existing wasiewater freatment plant have capacit��ta serve the project`? ❑Yes�No • ]s t�ie project sit� in the existing di�trict? �Yes[�'o � [s expa��sso�� of the district needrd? ❑Yes�No �'age � of 13 • Do existin� sc.wer lines serve the project sit�? ❑Ye��Na • Will a line extension within an existing district be necessary to serve tiie prc�ject? ❑Yes�No 1f Yes: • Describe extensions or capacity expansions proposed ta serve this projcct: rl•. Will a ne�v���astewater(sewage)treatment district be fortned to serve the praject site? ❑Ycs�:�;o If Yes: • Applicantlsponsor for ne�� district: • Date a}�plicatian submitted or aniicipated: � • W hat is nc�receivinQ�n�ater for che�vastewater discharge`' _._ v. if public facilities wi�l not be r�sed,dc:scribe plans to pravide i�aste���ater treatment for the project, including speeifying proposed rzceivin� ���ater(name and classifcation if sui�face dischaF-��:or describe s��bsurface disposal plans): Ind+v�duaf residential septic systems _ _ ��i. Describe any plans or designs to capture,recycle or reuse liquid waste: e. W'ill the ps•oposed ac3ion disturb moi•e than one acre and create stormwater runoff,either f�-orn ne�v point �Ycs�No saurces(i.e. ditch�;s,pipes, srvates. curbs,�utters or other conce�irrated f�o4us of storni�vatea-}or noa�-point sc�urce(i.e. shect flow)during construetion or post consu�uction? If Yes: i Hc�w much impec-vious surface�vill the project create in relation to total size af project parcei? Square feet�r 2�0 acres(impetvious surface} Square feet or 78.87 acres(parcel size) rL DeSCribe types of neGv point sources. Rooftop runoff, raadway runoff. -----_ ____. ____ �__._---- --____ .__ _._-- irJ. Where v�ill the ston��vater runoff be direc[ed(i.e. o��-site starmlva�er managemcnt facilitylstz-uctures, ad.jacent properties, �rou�ldwater,on-site surface water or off-site surface waters)`' __Stormwater+uill be directed towards on si'te stormwater ponds and veqetated swales. .-_— __ __ __ ,, � [f Co surface��aaters, identify receiving wvater bc�dics or wetlands: - __�. _---...._..�. • Wil� stormwater runoff filow to adjacent properties`.� ❑Yes�No it�. Daes t�ie proposed plan rninirnize impervious surf�ces,use pervio�s matei•ials ar callect �ttd re-use stormwater? �Yes❑No f. Does the proposed action include,or wvill it use otl-site, o�7e or Fnore sUurces of air emissions, including fuel ❑Yes�]No �ombus�ion, waste i�Gineratio«, or other processes or operations? ]f Yes,identify: r. �✓iobile sources during praject operaFic�ns(e.g.,lleaw eyuipment, f�eet or delivery vehicles} _�--_ ._.____ _ _ --- ii. Stationary sources during constrEiction (e.,�., power�eneration, structura] heaiin�, batch plant,crushers) rir. Stationar}� sattrces during operations(e.g.,process emissions, [arge boilers,electric generation) g. V�'ill an�� air en�issian sources naFT�ed i�i D.?.f(above). reyuire a l�Y 5taie�ir RegisLr�tion,Air Facility Permit, ❑Yes�No or Fedcral Clean Air Act Tit�e [V c�Y-Tit[e V Permit`' [f Yes: i. Is thc project site located in an Air c�uality non-attainment area? (A�•ea routinely or periodically fails ta rneet ❑Yes��o ambient air quaiit�� standards for al� or sante parts ofthe yeac} rr. ]n additian to e�nissions as calc��lated in the applic�tion,the prc�j�ct will generate: • _Tons/year(sl�or-t tans)bf Carbon �ioxidc(CQ,} • "I�onslyear(shart tons)of Nitrous Oxide(i�1,0) • Tons/year(shnrt tons)of Perfluorocarb�ns (P�=Csj • Tonslyear(�hort tons}af Sulfur Hexafl��oride(Srb) • Tans/year{short tons)of Carbon Dio:.ide equivalent of Hydrof]ourocarl�ons(HFCs) • Tons/year{short tons}of Hazardous Air Po[lutants{HAPs) Pa�e b of 13 h. Wil�the proposec�actio�� ge�terate or emit methane(including. but not limited to_sewage treat�rre�t pl�nts, ❑Yes�\'� landfills,c�r�nposting facilities)? �f Yes: i. Estintiate methane generation in tons!vear(metric): ir. Describe any��Zethai�e cap�ure,coi�trol or eliFninatian measures included in project design(e.g., combustion to ge��erate heat or electriciry, flaring): _ i. Will the praposed actio�� result in the release of air�ol�utants from open-air operations or processes,such as DYes�No quarry or 1lndfill operations? [f Yes: Describe operations and r�ature of emissions(e.g.,diesel exhaust, rock partic�ilates/dust): j. Will the proposed action resuit in a substantial incsease in traffic above presez�t levels or generate s�i�bstantial �Yes�No a�ew de�nand for transportat�ion facilities or services? Ef Yes: L 1�'hen is t17e peak traffie cxpccted(Check all that appl��): ❑Morning ❑ Evening ❑Weekend ❑ Randomly between}�o�irs of ta . _.._. ii_ For commercial activities only,projected nurmber af truck h•ipslda�y and type(e.g., senii trailers and ciump tr�icks): iri. Parkin�,spaces: �xisti€lg Proposed NeE increase/decrease __ _ ir. Does tl�e proposed action include any shared use parkin�? ❑Yes�Na v. Ifthe proposed action includes any snodafication of existing roads, cs�eation of newr roads or chan�e in eristing access,describe: vi. Are public/private trai��portation service(s)or faciliYies availabie within ii mile of the praposed sxte`? �Yes�No vii Ws�f the proposed actinn include access to public transportation or accammodations far use of hvbrid, electric ❑YesO`�lo or other alterr�ativc fuelcd vchieies? viii. Will the proposed action include plans for pedestria�l or bicycle aceo�nmodations fpr connections to existing ❑Yes�I�o pedestrian or bicycle routes? k. Will the proposed actiion{for commercial or industrial prajects only)generate new or additional demand �Yes�Na f�or eF�erby? 1 f Yes: r. Estimate annual electricity demand during c�peraiion of t}�e proposed action� _ --_ _ _.. _ __ ___ __�____ ir. Aizticipateci sourceslsuppliers of electriciry for the�roject(e.g., on-site cam6ustion,on-site renewable,via grid/laca] utilaty,or other): lii Will the proposed action requirc a ne�v,ar an lzpbrade.to an existing s�ibstation? i [�JYes[]No [. Hours of operation. Ans�h�er al➢ ite�ns���hich a�aply. i Durin�Constructiotl: ii. I�uring Operations: • Monday-Friday: 7 am-10 pm _ � Monday-�riday: _ �_ 24 hours • Saturday: �am-B pm • Saturday: 24 hours • Sunday:�_ _ none • Sunday: 24 hours • Holidays: none • Holidays 24 hours_ Page 7 af 13 �n. Wi11 the pcoposcc3 action �roduie i�oEse that r��ill erceed etisting ambient noise� levels during construction. �Yes❑V'o operati�m,or both7 2 f ves: i. E'rovide d�tails including sources,time of day and durafion: Typical noise associated with the construction of the raad ar�d infrastructure initiallV and then noise associated with indi�isual home constrt�ction _ _--- -_�.__._ __ � throughout the fife of the project. Haurs af consiruction are specified in section; D.2.1. rr. Will the proposed actian remove eristing natizral har�riers tliat ca�ild act as a noise 6arrier or screen? �Yes❑�"o DeSCribe: Exisiing vegetation will need to be removed to construct the proposed development �1. VVill the propased aetion have outdoor lighting? �Yes�Na 1 f yes: r. Describe source(s}, loc�ation(s), hei���t of�irtttre(s),directioi�laim, ai�d pro.�imity to�earesT occupied structures: Street lightin�will be located alonq the proposed road per city skandards.�.__ ___ �_ ______. ri. V1rr1! proposed action retnove existing natural barriers that could act as a Eight barrier or screen? �Yes❑�a DesCrihe: Exisiina veqetation will need to be removed to constructthe prajeck. ______________ o. Uoes the proposed action have the potential to produce odc�rs for moee than one hour per day� ❑Yes�No If Yes,describe possibte sources,potential frequency and d�iration of oc�or emissions,and proximity to nearest occupied structures: ,_`_ __.__�-- p. W i 11 t�e praposed action incfude any bulk storage of petraleum (combia�ed capacit��of over 1,(00 gal lons) ❑Yes�No or chemica] proc��icts 185 gallcans in above ground stos-abe or any ainount in��rsdergrout�d sCorage? If Yes: c �'raduct(s}tcr be stored _�_.__ _ ___�_________.�_____.___`_ ir. VolL�me(s) �er unit ti�ne (e.g.,mo��th,y�ear) iri. Generally,describe the praposed storage facilities: q. WiIP the proposed actiai�(coi�>>�ercial,indust�-ial and recreational projects only)use pesticides(i.e., herbicides, �Yes ❑No insecticides)durin�canstrifction or operation? ]f Yes: r. Uesc:•ibc proposed treat���ent(s): Proposed pesticide and her�icide treatment essaGiated with residential home ownership __._. __�.—. _. ___ _--- ii. Will the ra osed action use Inte�rated �'est Mana�eR�ent Pra�tices? ❑ Yes �No r. Will the proposed action(commereial or industrial peo.jects only) involve or req�ire the mana�ement c�r disposaB ❑ Yes �No af solid w�a4te(e�c�uding 1lazarcious materials)? If Yes: i. Deseribe an�� solid�vaste(s)to be�enerated during canstruetio�� c�r c�pe��ation of tf�e faeility: � Construction: tons per�A _______(unii of�time) • Operation : tons pea� (unit of time) ri. Desc�-ihe any proposals for on-site miuimization,recycling or reuse of materials to avoid disposal as solid waste: • Construction: • O�eration: � iii. Proposcd disposal inethods/facilities for solid waste generated on-site: • Consiruction: • Operation: Page S of 13 s. Does the pro�c�sed actioi� include constri�ction car rrae�di�catian of a solid �vastc mana��er7�cnt facility? ❑ Ycs� \'n If Yes: i. Type of n�ana�e�x�ent or handlin�T of'e��vste proposed for the site(e.g., rec;�cli�rg or transfer station, cornposting, IandfilL or other disposal activities): — -- — ii. Anticipated rate of dispasaUpracessin�: • . __Tons?month. if trans4-er ai-ather non-combustionithermal treatment,or • T�ons/hour, if�c�mbustio� e�r thermal treatment rra. [f landfill,anticipat�d site life: � _ years t. Wil] tl�e proposed action at the site involve the co�nmercial �eneration,treatment,storage,or dispasal of hazarclous DYes�No waste? if Y'es: i. 1\ai�1e(s) ofi all ���azardous w•astes or constituents to be gener�ted, handled or���anaged at facili�Cv: _ _.__ . __ .__ ii. Generally describe processes or activities involving hazardous wastes or canstituet�ts: ___ _-----— iir. SpecEf_y amount to be hand[ed or generated tons/month ir Descril�e any praposals fE�r on-site inini�nization,recyclin�or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No If Yes: provide naa�ae and location of faci4iiy: If No: describe propcssed ina�la�emcnt nf any hazai-dous wastes whicP�wiil not E�e sent to a hazardo�s�vaste faciliry: �. Site and Setting of Froposed Action E.1. Land uses on and surrounding the project site a. t:�isting land uses. r. Chcck all �ises t��at occur on, adjoining and near t}��praject site. ❑ Urban ❑ [ndustrial � Cotnmercial � Residentia[(sub�urban) � Rural (non-fa��n) � Forest ❑ Agric�i(ture � Aquatic 0 �ther(s�ecify): _______,_ ii. ff'n�ix c�f uses,benerall}�describe: b. Laz�d uses and coverh��es on the project site. Land use or C'w-rent Acreagc After Change Covertype Acreage Project C.ornp�etion (Acres +/-) • Roads, bu�ldings,and oth�r paved ar intpervious surfaces 0.10 2.05 +1.g5 • Forested 29.5 22.0 -7.5 • bleado�vs,�rassla�tds or brustilands(no�l- agric�iltural, incl�tding abandoned agricultural) 1 6o i 6o fo.o • A�ricultural (includes act'sve arcllards, fie[d,greenhouse etc.} • 5urface water featt�res (lakes,ponds,strearz�s. rivers, etc.) 1.70 t.70 +0.0 • Wetlands(fresl�water o�-tidal) 45.97 4y.97 +0.0 • �'�n-��egetated(bare rock,earth or till) ___ ___ ___ • Other GCSCrihe: Landscaping/Lawn 0.0 5.55 +5.55 Page 9 of 13 c. Is the pro,ject site presently used by members of tl�e cc�nzmunity for public recreation? ❑Yes 1❑Vo i. [f Yes: explain: d. Are there any fac�iities serving children,the eldea-1��, people with disabilities{e.�.,schoo}s, hospitals, licensed ❑Yes��Vo day care ce��ters, or group homes)�vithin 1500 fect of the project site� If Yes, i ldentify Facilities: e. Does t�te pro,ject site ccmtain an existing dam? ❑Yes�tio If Yes: r. Dimensions of tl�c dam and impoundment: • Dam height: feet • Dam I����t�: fee�t • Surface area: aeres • Voluizie impounded: _ _Ti gallons OR acre-feet ri. Dam's e�isti�7g ha-r.arcl classi�cation: iir. Provide ciate and sucTunariae results of last inspection: f. Itas the project site ever be�en used as a municipal, comtnercial ar is�dustrial solid waste management facility, []Yes�No or does the project site adjoi�� properly which is na�v.or�vas at one time, used as a soiid waste rrtana�ement faciiity? If Yes: i. Has the facilEty been fonnally closed? ❑1'es❑ No • Ifyes,cite sourcesldocu�nentataon: ri. Describe the location af the praject site relative to the boundaries of the solid waste managerrtent facility: � iir. Describe any development consiraints due to the prior solid waste activities: g. Have hazardous�v�stes becn generated,teeated ancilar disposed orat the site,ar daes the�roject sit�adjoii� ❑Yes�No property whic}� is��o���or�+�as at one timc used t€�comrnercialiv treat, store and/or dispose of hazardous�vaste? [f Yes: i. Describe waste{s)hand�ed a�d waste�z�anageraie�lt activities. includ�n�approximate ti�ne wl7en activities r�ccurred: h. Potential contaminat�on history. I��as there been a reportzd spFll at the proposed project site. or have any ❑Yes� No remedial actions bee�� conduci�ed at or adjacent to the propased site? If Yes: i. !s any portion of tfle siie �isted on tP�e\YSUEC Spills Incidents database or Environn�ental Site ❑Ye�❑No Remediation database? Cheek a[l that apx3ly: ❑ Yes—Spifls Incid�nts c�atabasc Provide DEC [D n�t�nber(s): ❑ Yes—Enviranmental Site Remediation database Frovide DkC [D r��ifnber(s): ❑ iVeither clat�base ri. [f site has been subjecf of RCtZA corrective activities, describe control measures: iti. Is the project within 24Q0 feet of any sit� in the NYSDEC Enviro�z�»enta] S�te Reniediatio�� c�atabase? ❑Yes�No If yes.provide DEC [D r�usi�ber(s): iv. [f��es to(i),{ii) ar(iii}above,describe current status of site(s}: Page 10 of 13 ��. !s the project site subject to an instittrtional control limiting property uses`? ❑Yes�No • [f�yes, DEC site tD number: • Describe the t}pe of institutional contro[ (e.g.,deed �-estriction or easement): � * �lescribe �tny use limitations: • Describe an�engit7cerii��� controls: � • Will the project affect rhe institutaonaE or engineering controls in place? ❑Yes�]Na • E;�plain: E.2. Natural Resourecs Oru or Near Project Sitc a. What is the avzra�e depth Eo bedrock on the�rojcet site? > �0' feet b. Are fhet-e F�edrock outcroppings on the project site? ❑Yes�i�o IfYes, what�roportian c�f the site is comprised of bedrock outcroppings? �% c. f'z-edo���inant soil type(s)present on project site: Bernardston 70 o/o Ciaverak 15 �/p Pitfstownlllion 15 °/a d. 41�'hat is the average deptf�tc�the�vafer table on the project sitc? Average: 2-3 feet e. Draina�e status of praject site soils:❑ Well Drained� o%of site � Moderate�y Well Drained: 42%of site � Poari,� Drair3ed 58%of site f. �,ppp-oximate praporEion of proposed actic�n site with sio�es: � p-]0°'0: 85 %of site � 10-15%: to %ofsite � 15%or greater: �5 °io o€site g. A��e there a��y unic�ue geoEogic features on the project site? ❑Yes�Na IfYes.describe: h. St�rface water features. r. Daes any portion of the psoject site contai�l wetlands or other waterbodies(inclUdit7g strearns, rivers, �Yes❑No por�ds or]aices)'? il. Do any �vetlands ar o"rher wraterE�odi�s adjoin the p��oje�ct site? �Yes01�'o lf Yes to either r or ii,conti��+��. If No.skip to E.2.i. rii. ,Are any oftE�e wetlands or���aterbod�cs i�-ithin ar�djoinir��the project site regu�ated by any federaL �YcsQNo srate or local a�ency? il� For each ides�tifieci re�;uiated wet�and and waterbody on Ehe prc�ject site, provide the following infonnation: • Streacns: Name ���-�27 � Classification � _—_ _ ._ _. -- ' Lakes or Pc�nds: Name Classification • W�tlands: Nat��e Federal Waters, Federal Waters, Fecferal Waters,... Approxin�ate Size � _.__, ` Wetland No. (if regulated by DEC) v. Are any of the ahove water bodies listed in the ttlost recent compilation of NYS water quality-impaired ❑Yes�'o waterbodi es? If yes,name of i��lpaired ���ater bodyl�odses and basis for listing as i:Tlpaired: i. Is the prr�ject site in a designated Flaodway? �YesOI�'o .t. ]s the �rojeci site in the I Op-year Floodplain° �Yes�"vo k Is the project site in thc �E)0-vear Floodplain7 �YesONo L [s the project site located over, or i�i�inediate[y adjaining, a�rii�zary, principal or sole source ac���ifer? �Yes[�No If Yes: i. Name of aquifer:principal Aquifer Page 11 of 13 m. ldentity t��e pred�ominant Fvildlife specaes thai acc�p}� or use the project site: �eer Squirl - ,_ _. — —z ------ — - _.. Rab6it n. Does the pr��je�ct site contain a designated signif�rcani natural cc�mm�rnity? ❑Yes�No If Yes: i. Describe ihe habitaticommuniry(composition. function, and basis for designation): - - ___ -- ii. Source(s)of description o�-evaluation: rii. �xter�t of communitv/habitat: • Curre�tly: acres « [�`ol]o��-inR completion of praject as proposed: acres • Gain or loss(indicate - or-}: acres o. Dc�es project site contain a�ly species of plac�t or animal that is listed by the federal go��ci-nment or NYS as ❑Yes�No endan�ered or chrcate��ed, or daes it coi�tain any areas idenfified as habitat for an endangered or threatened speci�s`? [f Yes: i. Species arad listing(endangered or threatened): p. Does the project site contain any species ofplant or animal that is listed by NYS as rare,or as a specics af ❑Yes(,�No specia� conce��n? If Yes: r. Spccies and listin�: q.Is the praject site or adjoining area currently used for hunting, trappit7g, fishing or she]I fishing? ❑Yes�'.lTo If yes.give a 6rief descr�ption of how the proposed action ma}�affect th�t use: F.3. Designated Public Resources On or!�'ear Project Site a. ls thc project site, ar any�porri�n of it, located in a designated agricultural district certit��ed pursuant tc� �Yes�No A<�riculture and Markets La���, Artiele 25-AA, 5ection 30� and 304? If Yes, provide county plus district name/number: b.Are agric�iltural lands consisting ofhi�171y produciiv�s�ils present? ❑Yes��Io i. If Yes: acrea�e(s)on project site`' _ __ ri. Source{s)of soil ratin�(s): � c. Does the project site contain all or part of,or is it substantially contiguous to,a reQistered National ❑Yes�'�o Natural Lanr�mark'7 If Yes: i. �ature af the r�atural landinark: ❑ Biolo�icai Co7n�t�unity ❑ Gec�lc�`�ica[ Feature ii. Pt-ovide brief ciescription of land�nark,including values behind desi�nation and app2•oxiinate size/extent: d. ls Ehe project site located in oa�docs it adjain a state listed Ct-€tical Environmental Area? ❑Yes�No If Yes: i. CFA name: ir. E3asis for designat�on: __._ iii Designating agency and ciate: Page l2 of 13 e. I�oes�ihe project site contain,or is it substantially contis�tic�us ta. a l�uilding, arehaeologicai site. or district ❑Yes�No �vhich is listed on the National or State Register of Historic Places.or t�hat has been de�ter�l�ii�ed by t�e Commissioner nf the NYS Of�fice oF Parks, Recreation and Historic P�-eservation to be eli�ible for listic�b on the State Registec af Historic Plaees? If Yes: i. '.�ature of historic/at�chaeological resource: [�Archaeoia,�ical Site ❑Historic Buildi�ig or Uistrict ir. I�'ame: rii Brief descripti�n of atTri�utes on�r�hich Iistin�� is based: f. Is the pro�ect site. c�r any portic�n of it, lacated in or adjac�rri to an area desi�nated as se�sitive for �Yes❑i��o arcl�aealogical sit�s on the 1*;Y State E�listoric Preserva�ion Office(S]�PO)arehaeologic�l site inve�ltory? g. Elave additianal archaeo(ogical or historic site(s) ��r resources been identii`iec� on the project s'ste? �Yes❑\'o If Yes: i. Describe possible resource(s): ii $asis for identiFication: Phese 1 report by Curtin Archaeoloqical Consultinq, lnc. __. _ h. ]s the�araject site within tives miles of any o[ficially designated ar�d publicly accessible fedes•al, state, ar local ❑Yes�No scenic or aesthetic resourcc'� If Yes: i. ldentify resource: ri. Nature af,or basis for,designation (e.g., established highway overlook,state or local park, state historic trail or scenic byway, etc.): _�— -- —_ _____. irr. Distanee betvveen�sroject and resource: rniles. i. Cs tlte project site lacated within a designated riv�r corridor undei-the Wild, Scenic and�ecreational Rivers ❑Yes�No Pra�ram 6 NYCRR 666`' [F Yes� r. [dentify the name af the river artd its designatian: �__ � ir. Is the activi[y eonsistent�vith c�eWeloprnent restrietions contained ir�6NYCRR Part 666? ❑Yes❑No F. Additiona] Informatian Attac�any adc�itional information which may be needed to clarify your project. [f y-ou have identified any adverse impacts which co�ild be associated with your proposai,please deseribe those impacts pl�s any ❑ieasures which you propose ta avoid or minimize them. G. Verifcatian [ certify that the information provided is true to the best of�u`� knowledge. App[icand5ponsor Name 227 Kaydeross Ave, Inc.,Kenneth Scott Date 1 � 0`"(�c� �t72 Q �� Signature Title President PRlPJT FORM P��e 13 of ]3 EAF Mapper Summary Report r��sa�y, January 21, 202D 8:32 AM DiSCfeimeC: The EAF Mapper is a screening tool intended to assist peoject sponsors and revfewing agenCies in preparfng an environmental assessrrtent form(EAFy.Not all questions asked in the EAF are <;.�a, artswered 6y the EAF Mapper.Additional informa�ion on any EAF `'�^r. c., queslion can be obtained by coeisulting the EAF Woricbooks, Although '`G-, � T:� the EA�Mapper prouides the mosf up-to-date dig+la�data available to DEC,you may also need ta contaci lacal or other data sources in order ' to obtain da'�a not provided by the Mapper.Digtlal data fs n�t a substitute for agency determinations. � ;A c�zr;�� .r.taa,aFa� � , � � �~ c�t'�fiCS�� �af�ffC'dC� Tcaronto i N��[��� 6, f:�er}':3;I�,r ei :��a..tF, � U�t:e-It Ec.;tan r �a�r�s: Esri, HE�E,G��min, t1S:�ag, �.('rrEF.nci :"c����far�c� Interr�a�. lt;�RE�v1Ef+�T F. 'yRCar, �ri .- �k ,75�sn.F:�IfTI, Esri�hi^� '��=rgis:crgj,Esri E `ri:�-.��i.X'E,,E.C"s�r�-ni^ 1{e=_� E;ril7nailand,. � ti:�G, �C; kf �Columbus �'Pittztaurgh l,�Gi�111art��r, ICat.r�E�•:1E�;T s r S_ i��,;,S.��t��:19p C�l��tl�tst�,srtd ihE G15 F i`��N�!'. Es i :sF.art. t."�TI. Kaycia:,R;� us��cmm:,^ity cito�iati ,E�t�t"htrq ^n� fCc'^9). E4n Y�Ya..,��e �,I�,� B.i.i [Coastaf or Waterfiront Areaj No B.i.ii [Locaf Waterfront Re�italization Area) No G.2.b. [Special Planning District� Yes - Digital mapping data are rtot avai�able fior aff Special Planning Districts. Refer to EAF Workbook. C.2.b. [Special Pianning Disfirict- Name] NYS Herifage Areas:Mohawk Vafley Heritage Corridor �.1.h [DEC Spills or Remediation Site - Digital mapping data are not avaiiable or are incomplete. Refer to EAF Potentia! Contamination History] Workboof�. E.1.h.i EDEC Spills nr Remetliation Site - Digital mapping data are not avaifable or are incomplete. Refer ta EAF Listed] Workbook. E.'#.i�.i [DEC 5pills ar Remediation Site - �igital mapping data are not auailab�e or are incamplete. Refer to EAF Environrr�ental Site Remediatian Database] Workbook. E.1.h.iii [Within 2,Of70'of DEC Remediation No Site] E.2.g [Uniq�re Geologic Features7 No E.2.h.i [S�rface Water Features] Yes E.2.h.ii [Surface Water Features] Yes E2.h.iii [Sur�ace Water Features] Yes - Digital mapping information on IocaE ar�d federal wetlands and waterbodies is known ta be ineomplete. Refier to EAF Workbaok. E.2.h.iw [Surface Water Features - Stream 941-127.1 Name] �.2.h,iv [Surface W�ter Features - Stream C Classif�cation] E.2.h.iv [Sur€ace Water Features -Wetlands Federal Waters Ivarne] E.2.h.v [lmpaired Wafer Badies] No E2.i. [Floodwayj pigital mapping data are not a�ailabls or are incorr�pfete. Refer ta EAF Workbook. Full Environrr�ental AsseSsment Form - EAF Mapper Summary Report � �.�.�. ��vv i co� i �vv.�Nian�� viyiiai ri�aNNe�iy ua.a o�a., eiv�qrauavic �� a�c nwv�ii�.+ic�c. i�cici w �r-ii Workbaok. E.2.k. [500 Year FEoo�pfain] Qigital mapping data are not available or are incompfete. Refer#o EAF WorkbooK. E2.1. [Aquifers] Yes E.2.1. [Aquifer Names] Principa! Aquifer E.2.n. [Natural Communities] f�o E.2.o. [Endangered or Tl�reatened Species� No E.2.p. �Rare Plants or Animals] fVo E.3.a. [Agriculft�ral District� No E.3.c. [Natiana! Natural Landmark] f�o E,3.d [Critical Env�ronmental Area] No E.3.e. [National or State Register of Historic Digital mapping data are not available or are incomplete. Refer to EAF Places or State Eligible Sites] Workbook. E.3.f. jArcheolagical 5ites] Yes E.3.i. [Designated River Corridor] �Pa Full Environmental Assessmen# Form - EAF Mapper Summary Report , I � NEW YORIC p�rks Recreation crFTE OF � + (JPnORTlit�fTY and Historic Preservation ANDREW M. CUOMO ERfK KULLESEID Governor Cominissioner October 31, 2D19 Mr. Robert Fraser Environmental Seientist The LA Group, F'.C. 40 Long Alley Saratoga Spris�gs, NY 12866 Re: DEC Kayd�ross Ave. Eas� Conser�ation Subdivision 227 Kayderass Avenue East, Saratoga 5prings, NY 12866 �8PR04072 Dear Mr. Fraser: Thar�k you for consultir�g with the Di�ision for Historic Preseruation of th� Office of Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the submitted materials in accordance with the New York State Historie Preservation Aet of 1980 (Sect�on 14.09 of the New Yark Parks, Recreation and Historic Preservation Law). These comrr�ents are those of the Division for Histaric Pres�rvation anci relate oniy to Historic/Cultural resources. They do not include potential en�ironmental impacts to New York State Parkland that mayy be irrvolved in or r�ear your project. 5uch impacts rrzust be considered as part of the environmental review of the pro�ect pursuant to the �latiorial Environmenta! Policy Act. We are in receipt af the Phase I survey report (Phase I Archaealagical Survey, 227 Kaydeross Auenue East, City of Saratoga Springs, Saratoga County, New York) by Curtin Archaeologieal Consulting, Inc. and dated September 2019. The survey identified 5 precantact archaeological sites and a single historic archaeaEogical site, the latter overlapping and encorripassing ane of the former. Giver� their preliminary identification, the National Register eiigibility of all 6 archaeofogical sites remaiRs Undetermin�d. The sites have been assigned the following Unique Site Numbers (USNs): Name [1SN Ka derass Avenue 'i Precc�ntact Site 09140.1661 _Kaye�eross Aver�ue 2 Precor�tact Site fl9140.1�62 Kaydeross Av�enue 3 Precontact Site 09140.1663 Kayderpss Avenue 4 Precontact Site Q914q.1664 Kaydeross A�enue 5 Precontac# Site 09140.1665 _Kaydeross Avenue Histaric 5�te 09140.1660 We concur with the reporC recommendation far avoidance of all six sites, and if nc�t feasible, Phase II archaeologica! site e�al�atiQns ta refirre spatial baundaries and determine NR elcgibility. To this end, the OPRHP requ�sts submrssion afi a cornprehensi�ve sFte avaidance map of the project area west of Kayc�eross Avenue. The map shauld cambine the P�ase !B testing results shown on Figure 14 of the submitted report, the archaeo6ogical site baundaries shown Divishon far Historic Preservation !'.0 Box 18�,Waterfard, New York 12188-0185•(538}237-86A3•parks ny.gov on Figure 17, and the most recent site plan of the proposed suhdivision that ciearly indicates the project's Area of Potential Effects {APE). Please note our Survey and E�aluation Unit has no above-ground building concerns with this project. If you have any q�estions, please do nat hes�tate to contact me at 518.2682185 or andrew.farry@parks.ny.go�. Sincerely, �} r � ',11+�^1^r �Y'� ,j Andrew Farry, Ph.D. Scientist/Archaeology Ge: Dave Carr, L,A Group Ec€ Curtin, Curti� Archaeoingy Kirst�n Dymond, Ce�rtin Archaeology Division for Mistaric Preservation P.Q. Box 189. Waterford, New York 12188-D189•(518}237-8643•parks.ny.gav ' Q�FARTMENT OFTHE ARMY .��j�'f�� US.Army Corps of�ngineers,AT3'N;CENAN-OP-RU Upstafe Regulatory FieEd Of#ice t,� � � , 9 8uffington St_,Building 1a, 3rd FI.North � � A � Watervliet, New York 12189�ta00 ��C 2 G 2Df9 Upst�te New York Section SIJBJECT: Permit Ap�licatian No. NAl�-2019-01258-U�E by Mr. and Mrs. Kennetf� Scn�t City of Saratoga Springs, 5aratoga County, New York Mr. and Mrs. Kennefh Scott � 227 Kayd�ross Avenue East � , Saratoga S�rings, NY 12866 Dear Mr. and Mrs. Scott: This o�Fice has reviewed your Joinf Ap�Iication Farm dated September 19, 2�19, Ets atfiachmenfs, and the a�dFtional information received by this office on November 4 and December 9, 20'f9, including #he drawi�rgs prepared by Tf�e L.4 Group, P.C., er�titled "Kaydeross Ave. Eas# Conservatian Subdivision, 227 Kayderass Ave. East, Saratc�ga Sprin�s, N`Y �2866", with Drawing No. W-1 dated Octok�er 2G, 2�17, and fast r�vised on December 5, 2D19y and Qrawing Na. V11-2 da�te� September 12, 2019, and � fa�t re�ised nn Dec�mber 5, 2�19. The submi�ted information describes a proposa� that wa�ld cansist of the foElawing: The disch.arq�_of_fi_II_material into waters o�the Ur�i�ec� 5tafes, specificafy 0.06 acre of wetlands and 85 linear feet of stream to faci[itate the construction af a road within_fhe 14 lot resicfential developrnent. A 65 foot lonc�. 83" wide by 57" hiqh �mbedded prp� arch culv�rt, alona with headwafls and scour prot�ct�or�, . wo_uId be installed �t the stream crassir�p. The work shalf be done in accordance with #he avoit�ance_meas�res outlined in Drawinq No. W-7 referer�ced a�ave, and the fetter from the �lew York State Office of Parks Recr�afion and Histor�c Preservation dated December fi 2019 co enclosed. When natificafior� to the SHPO is required per the I�fte�r, you shal) atso notifv the New York District, U.S. Armv Corps of Enqineers. Based upon the info�matinn provided, it appears that yaur pr�apased work may be autho�ized �nd�r De�artment af fhe Army nationwide gen�ral permit r��mber: 14. The nafionwide permits are prescribed as a Reissuance of Nationwide Permits in the Federaf Register dated January 6, 20�7 {82 FR 1860). The wark may be performed withc�€at fur�her autharizatian from this affice provic�ed the activity comp�ies with the t�rms and conditiQns af the Nafionwi�e Pe�rnits (NWP) and the permft cor��ifions listed in Section B, Na. 14, Sec#ior� C, �ny applica�l� � New York Dis�rict regio�af canditions, and any applicable r�gianal conditions added by the State of N�w York. Please note that NWP Genera( Condition No: 12 requires the PLEASE ItSE TH�ABDVE 1 S-CHARACTER F1LE NtJMBER QN ALL GORRESPONDE�C�WITH THIS OFFICE -2- installation and rnafntenar�ce of proper saif erosian and sedimenf cor�trols during construction. The 2Q17 Nationwide Permits, 6ncfuding thear final regior�af conditions, water � quafity certifications, and coastaf zone co�currence stat�;mer�ts are avaiEable af: F�tt ://www.nan.Usac�.arm .mil/Missions/R� ulato /Nationwide-Permits/ Please review and farriiiiarize yours�lf with a11 relevant �erms and conditions of the nat�onwide permit priar fa praceeding with your praject, and subseq�ently ensure you adhere t� all con�itior�s through th� duration af the project. (f you do r�at ha�e internet access and require a specific paper copy, pleas� contact the undersigned #o request or�e be ma�led to you. Pf�ase he sure ta have your permit application number readify available when you call. This verificatian is valid ur�ti[ March 'f8, 2022, unless the natianwide permit is modifi�d, reissued, or revoked. This �er�ficafian wiPl rema'rn vaiid until March 18� 2022, if the activity complies w�th the ferms of.any subsequent mc�difcations Qf the nationwide permit aufhorEzation. ff the nationwid� permits are suspend�d, revaked, or mo�ified in s�rch a way that the acfivify wauld no �onger compfy with th� terms and condifiar�s af a natianwide permit, ar�d the proposed activity has commenced, ar Es under confract ta commenc�, the permit�ee shall have 12 mo�ths from tFte date af s�ch action to complete tne activity. . Pfease note that, as you requested, thEs nationwide p�rmit (NWP) authorization is based Qn a prel�mir�ary jurisdictional determination (,!D). A prelimir�ary JD is not ap�pealable. !f you wish, prior to cammencemenf of the authorized work yo� rnay request an a��ro�ed JD, which may be appealed, by contacting the New Yor�C District, U.S. Army Corps of Engineers for fur�her instrucfion. To assist you in this decision an� addr�ss any quesfions you may have on the differenc�s b�tween pre�iminary and ap�roved jurisdictionaf deferminations, please review U.S. Army Corps of En�ineers Regulatory Gurdance Letter h[o, 16-01, which can be fo�nd at: �tt :!/w�vw.usace.arm .mil/Missiar�s/CivEl-WorKslRe ulato -Pra ram-an�- Perm itsfGuidanc�-Let�ersl Please note that this defierminatiQn daes not elim�n�te the need to obtain any ather Federal, State or.{oca! au�harizations required �y law for tt�� abav� des�ribed work, Encluding any required permit from the NYSDEC. In order for us to better serve you, please camplete aur Customer Service Sunrey iocated a#: htt ://www.r��n.usac�.arm .miVMissians/RequfatarvlGustomerSurvey�aspx -3- Any inquiries �ar� be directed #a the unders�gn�d af (5�8) 266-6354. Sincerefy, . � C ristine De(orier Seniar Pro�ect Manager Upstate New York SEctic�n Enclosures � �� Cf: NYSaEC Region �, Warrensburg (DEC #5-4� 15-00252/Of��C11) Cify of Saratoga Springs • � R. Fraser— The LA Group, P.C. ' NEWYC)F2K Parks f�ecr�a�ion : . 57A7E pp � �7 r� ' 6PPORTUHI7Y. ��.t� Li'��Q{..l�1'�..��e�a��d� 11 ANDREW M, CUflMb ERIK KllLL�SEID � Gavernor Gommissioner � December 06, 2019 Mr. Robert Fraser � Envirortr��nt�! Scientisf � The LA Group, P.C. 40 Long Afl�y . Saratoga Springs, NY 12866 � R�: USAC� Kaydeross Ave. East Canservation Subdivisian 227 fCaydeross Avenue �ast, Saratoga S�rir�gs, NY 12866 'f$�R04072 �ear Mr. Fraser: ThanK you for cansulting with the New York Sta�e HistQric Preservation Offrce.(SI�PO). We have re�iewed the projec� in accordance with Sectfon 106 of the N�tianaf Nistoric Preservatian AGt of 1966. These comments are thase of the SHPO and relate only ta Historic/Cultural resources. T'hey do not include potential environrr�er�tal ir�pacts to New Yar�C Sfa€e Parkiand that may �� involved in or near your prQject. Such impacts rr�ust be considered as part of the enviranm�r�tal review af th� project pursuant to the Nafional �nvironmental Palicy Acf and/or the Sfa�e Env�ronmental Quality Review Act (New York Environrnerttal Conservation Law Articl� 8}. We are in receipt oft�te comprehensive site avaidance r�ap (Subdivision Plan, Drawing W-�} by the LA Group ancf dated 10128/2Q19 with revisions. The map displays the boundaries of the . identified archaeological sites and their proximity to the prajec�'s Area Qf Potentia� �ffeets (APE), and the SHPO cancurs that ail of the sites will be avoided. by the proposed canstructiort. In �andem with the map, SHPO recommends the fof€a�rri�g sife avoidance m�asures: . • At a preconstruction meeting v,rith t�i� construction confracfor, the person in charge shalf be nfltified regarding the �eed to pratect and avoid the archa�alQgical sites. • Ter�porary fencing shaff E�� insfalled arour�d the site boundar��s priflr to any ciearing ar -canstructian activities and shall be r�aintained until a!1 constructian has ceased. Af�er construction is fully complefed, protective fences may be remaved. • lt�adverter�t constructinn impacts are to be reported to ti�e SHPO immec[iately. Activity s�aF! �cease ir� the vicinity af the site so the ciarrtage ca� be assessed and a r�commendatio� provided ta r�mediate fhe situafion. � • fn �he event th�t human r�mains are encourstered d�rtr�g construction, a11 work must stop in the vicinity nf the find and be repor�ed fo the SI-iPO. Contingent upon tF�e fulf implemer�tation �f the avoidance measures outlined.in this iett�r and shown on #i�e submitfed avaidance map, it is the SHPO's apinion that your project will haVe No � Divisio� for Historic Preservation ' . P.Q.Bax 1 B9,Waterfard,New York 12188-Q189•(51 S}237-8643•parks.ny.gov � E�fiec� upon cuEturai resources in or eligible for inc4usion in �h� Nationaf Register of Nistoric Places, � if you have any q�estions, �lease do nat hesita#e ta contact rne at 518.2�8.2185 ar andeew.farry c�parks.ny.gc�v. SirlCerely, ���� . . � An�rew Farry, Ph.D. Seientist/Archaealogy Ce: Christine Delarier, USACE Dave Carr, !_A Group � , Ed Curtin, Curtin Arehaeology Kirsten dymond, Cur�in Archaealogy ,,= Divis'ton for Historic Pres�rvatian " P.O.Box 189,Waierford,New York 12188-4189•(518}237-8643•parks.ny.gav NEW YORK STATE D�ERARTMENT OF ENVIRO�IMENTAL CONSERVATIC7N Divlsion of Envlranmettta!Perrnits,Reglon 5 232 Golf Course Road,Warrensburg,NY f2685 P:(578)623-1282 1 F:(5t8j 623-3503 www.dec.ny.gou January 27, 2020 Mr. and Mrs. Ken€�efh Scatt � 227 Kayderass Avenu� �ast . Saratog� Springs, NY 12866 Re: SECTfON 40� WAT�R Q�IALITY CERTiFECATION D�C Applicat�on # 5- 4115-D425210E}041 Kaydeross Avenue East Conservation Subdivision Sarafaga Springs (C), Saratoga (Co.) De�r Mr. and Mrs. Scott: The New York State Department of Enviranmenta! Conservation (DEC) �as reviewed th� referenced application which we received on Se�tember 27, 2020, Based on oc�r review, we I�ave determined that your praject does not reauire a Fr�shwater Wetlands permit nor an individual Water Quality Certification (WQC}. This determination is based on the folfowing: • Your project wil� not disturb D�C regulated wetlands. • Your project is subject to the tJ.S. Army Carps of �ng�neers {USACE} Natiart�rvide F'ermit (NWP} # 14. • The DEC has granted blankef WQC for NWP # 'E4 provided the prajeet meets the rec�uired genera] canditions as autlin�;c� in Item 3 of the DEC's March 7, 2{}17 letter to Stehan Ryba and Diane Kozlowski of the USACE • Based an aur review, your project meets the required general conditions and, therefore, can �e autho�ized under the DEC Section 4Q1 Blanket WQC. Please feel free to contact rne at (518} 623-1283 if you ha�e any c�uestions. Sincere(y, �---� � . Beth A. Magee Deputy Regional Permi# Administraior ec: Christine Delorier— USACE (NAN-2019-01258-UDE) Robert Fraser—The LA Group Jed Hayden — DEC t�Ew'�oRK Department af � o�aoaiuN�ry E�vlranmenta! Conservation