HomeMy WebLinkAbout20200066 Bottini Garage Addition Narrative (2) Zi m bra a ma nda.tucker@sa ratoga-spri ngs.org
Re: Bottini Garage Updated Plans
From : Douglas Morabito <morabitodouglas@gmail.com> Tue, Mar 03, 2020 09:08 PM
Subject : Re: Bottini Garage Updated Plans �
�
To :Amanda Tucker <amanda.tucker@sarato a-s rin s.or > �r��2 attachments
9 p 9 9
Ama nda,
The plans say 9.8% but the engineer did not count the 6" soffit or stairs, which bring us to a
total coverage of 11.3% or 629 sq ft.
The soffits a nd sta i rs add i ng 47 a nd 36 sq ft, respectively.
Principal building coverage for existing house is 987.43 sq ft or 17.75%, including porch,
bilco, gas meter cover, and 6"soffit all around.
Best,
Doug
On Tue, Mar 3, 2020 at 12:21 PM Amanda Tucker <amanda.tucker�saratoga-springs.org>
w rote:
Hi Doug,
Thanks for sending.
The Board requested the principal building coverage for the existing house. This should
include roof overhangs and any decks, etc.
Also, does the garage coverage number (546 sf. or 9.8%) provided include the roof
overhangs?
Thanks,
Amanda
N
Amanda Tucker, RA
Senior Planner
City Hall
474 Broadway
Saratoga Springs, NY 12866
(518) 587-3550 ext. 2517
PLEASE NOTE OU R TEM PORARY LOCATION AT TH E RECREATION CENTER, 15