Loading...
HomeMy WebLinkAbout20261001 120 Division St City Square Site Plan Modification NarrativeProject Narrative CITY SQUARE SUBDIVISION ELLSWORTH SQUARE, LLC 120 Division Street City of Saratoga Springs Saratoga County, New York October 12, 2026 Prepared By: The Environmental Design Partnership, LLP 900 Route 146 Clifton Park, NY 12065 ENVIRONMENTAL DESIGN ' PARTNERSHIP, LLP. tpENVIRONMENTAL DESIGN PARTNERSHIP, LLP. Shrpm9 the p6ysieai en:nranrc,i 1.0 Project Overview This project's intent is to reconfigure the previously approved 2014 City Square Site Plan by replacing residential/commercial space with single-family residences. Proposed Modifications include: 1) Two Single -Family Residences (Matching As -Built Design) 2014 Approved Site Plan: 4,000 SF Commercial Building w/ Six Residential Units 2) Four Single -Family Residences (Matching As -Built design) 2014 Approved Site Plan: Eight -Unit Residential Building The property is located within the Planned Unit Development (PUD) District under the City's Unified Development Ordinance (UDO), which is intended to support commercial and industrial activities along Division Street all while ensuring efficient use of land, promoting good site design and establishing a pleasing environment. 2.0 Existing Conditions Many of the homes proposed in the original site plan are constructed. The proposed residences will be identical to the adjacent properties and follow the same landscaping design. Both the access roads and originally proposed utilities are in place and can readily accommodate these modifications to the site plan. Figure 1: Site Location 2 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 e-mail: info@edpllp.com ENVIRONMENTAL DESIGN PARTNERSHIP, LLP. Shaping tile- physical •>nv¢winrrr.' 3.0 Site Context The project site is located along Division and Walworth Street, a primary local urban street in the city and characterized by a mix of commercial, residential, and mixed -use development. Surrounding land uses include neighborhood -scale commercial and residential uses. The corridor continues to experience reinvestment and redevelopment and serves as an important transition between small-scale commercial areas and adjacent residential neighborhoods. The site's location and size make it well suited for redevelopment consistent with the intent of the PUD District. 4.0 Redevelopment and Site Design Both the original and modified site plan design emphasize a downtown luxury walking community with historic Victorian architecture. The proposed buildings will meet the required frontage build -out and reinforce the pedestrian character of the area. The overall layout has been developed to efficiently organize building placement, circulation, parking, and open space while maintaining a cohesive development pattern. Sidewalk connectivity is provided throughout the site and offers an integrated feel with custom street lights and accessible alleyways. 5.0 Access, Circulation, and Parking Access to the site is provided via an existing entrance on Cherry Street, as shown on Figure 1, and along Marvin Alley. No additional driveways or access points will be introduced. Pedestrian infrastructure is proposed along both Cherry and Walworth Street and will link into existing sidewalks. In addition, an internal sidewalk network is provided throughout the site, creating connectivity between buildings, parking areas, and on -site green spaces. This system of sidewalk connectivity supports safe and efficient pedestrian movement within the site and reinforces the pedestrian -oriented intent of the Division Street PUD and the City Square Subdivision design objectives. 6.0 Zoning Compliance The proposed development has been designed to align with the dimensional and bulk requirements of the Division Steet PUD District. 3 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 e-mail: info@edpllp.com ENVIRONMENTAL DESIGN } PARTNERSHIP, LLP. u The building frontage along Division Steet and Walworth Street has been configured to meet the required build -out percentage, reinforcing the curb appeal and pedestrian character of the corridor. The existing City Square entrances provide organized access while minimizing disruption to neighboring roadways. Green space has been incorporated into the site design in a manner that supports both the functional layout of the project and the intent of the PUD to create an active and pedestrian - friendly environment that will service commercial business and residences alike. 7.0 Prior Approvals In 2014, the Planning Board granted Site Plan Approval for the City Square Development. As part of that review, the project underwent full SEQRA evaluation and received a Negative Declaration, indicating that the proposed development would not result in significant adverse environmental impacts. In 2019, the Planning Board granted a Site Plan modification to the original 2014 plans to reconfigure the tentative lot lines within Great Lot 8: Reduce the number of units from five to four and provide open space between units 2 and 3. The current application builds upon the previously approved concept, with modifications to building type and refinements to site layout. 8.0 Summary The proposed development at 120 Division Street represents a well -considered redevelopment of a key property along the Division Street corridor. The project introduces a mixed -use development that reinforces the streetscape, supports a variety of uses, and integrates building placement, access, and green space in a cohesive manner. The development is consistent with the intent of the Division Street Planned Unit Development and contributes to the continued responsible development of the area. 4 900 Route 146, Clifton Park, New York 12065 phone (518) 371-7621 e-mail: info@edpllp.com