HomeMy WebLinkAbout20260708 269 Broadway Site Plan Review Response to Comment Letter - Planning Board SPR Rev 1Cannie Law PLLC
4 Roberts Ln.
Saratoga Springs, NY 12866
518-350-4137
cannielawfirm@gmail.com
October 30, 2026
City of Saratoga Springs
Planning Board
Attn.: Susan Barden
474 Broadway
Saratoga Springs NY 12866
Via email
RE: Site Plan Review Application: 269 Broadway, Saratoga Springs - Tax Parcel:
165.75-1-7
Proposed Use- Mixed Use: Multi-family Residential and Ground Floor Commercial
Response to Planning Board Comments
Hello Susan:
As the Board is aware, this office represents 269 Broadway Saratoga, LLC, (the “Applicant”)
with respect to Site Plan Review Application (the “Application”) for Tax Parcel: 165.75-1-7
located at 269 Broadway in Saratoga Springs New York (the “Property”). The Applicant
appreciated the Board’s comments on the Application at the Planning Board Meeting on
September 23, 2026. Below are the Applicant’s responses to those comments, with various
additional supporting materials attached, as follows:
1) Revised Narrative
2) Revised Site Plan Set from Studio A, D.P.C. dated 10-30-26
3) Revised Site Rendering from Studio A, D.P.C. dated 10-28-26
4) Revised Architectural Renderings and Floor Plans from RAMSA dated 10-29-26
5) Revised Stormwater Pollution Prevention Plan, from Studio A, D.P.C. dated 10-28-26
6) City Engineer’s Memorandum, dated October 16, 2026, confirming Two 11-foot curb
cuts on Hamilton Street
7) Waste Management Narrative, from the Applicant dated 10-27-26
8) School Traffic Logistics Plan, from the Applicant dated 10-27-26
9) A Construction Sequencing Plan, from the Applicant dated 10-30-26
10) Foundation and Groundwater Narrative, from Christopher Snyder P.E., of Spring Line
Design dated 10-28-26
11) No Mow Lawn Seed Fact Sheet
Below are the Board’s Comments and the Applicant’s Responses. All comments are in bold
and the responses are in italics.
1) Provide an Amended Narrative and submit new 6th floor layout and materials
reflecting any other building modifications.
Submitted herewith is an updated narrative, based on additional information and the
minor building and site plan alterations since the original submission from August 14,
2026. The site plan and building revisions are necessitated by reason of modifications
to the sixth floor plan and ground floor plan, due to the relocation of all residential
amenity space to the ground floor and the addition of two residential units to the sixth
floor – raising the unit count from the original 34 to 36. As a result, the building
footprint changes slightly by removing the small northern courtyard, expanding the
larger courtyard to the south and the sixth floor has an increase in the enclosed floor
area by approximately 1,615 square feet. Further, the roof plan has been amended to
reflect the addition of mechanical equipment and necessary screening.
2) Provide Confirmation from Code Enforcement that the Roof Plan is permissible
under building height limitations
The Applicant has met with and corresponded with Code Enforcement regarding the
Roof Plan to conform to the UDO height limitations. Maximum Building Height for
this project is 70 feet. UDO Section 21.4(D)(3) provides an exception to maximum
building height for areas that includer architectural design elements and mechanical
equipment, which is limited to 25% of the total roof area. As part of the current packet
submitted is a revised roof plan, that fully details the size and location of any building
elements above the maximum height within the permitted exception. These are
identified in red on the roof plan. In blue are the two Optional Height Exemption
Elements - one on each of the street-facing facades - as allowed in Table 4-C of the
UDO. As discussed, these are considered separate and apart from the roof height
exception in UDO Section 21.4(D)(3) and do not need to be counted towards the 25%
maximum.
Based upon multiple email exchanges and conversations with Code Enforcement, the
Applicant anticipates Code Enforcement’s approval of the roof plan as proposed and
submitted herewith as part of RAMSA’s revised rendering and floor plan package.
3) Provide Analysis of Parking Requirement Under UDO for UC Zoning District.
Section 10.6(A)(2) of the UDO provides that the UC District is exempt from minimum
vehicle parking requirements. But further indicates, “[w]here parking is provided,
property is still subject to basic requirements of the chapter.” With respect to the
Application, the Applicant is proposing parking as an additional amenity to its multi-
family residential users. Dwelling – Multi-Family necessitates required minimum
parking generally at two per dwelling unit, but that is reduced to 1.5 spaces per
dwelling unit in the higher intensity zoning districts of UR-4, NC and UN. See Table
10-C of the UDO.
The Applicant asserts that the “basic requirements” of the chapter with respect to
multi-family dwelling parking would require compliance with the parking requirement
in the most comparable zoning district to the UC zoning. The UC District is identified
to “accommodate[s] the highest intensity and diversity of nonresidential and upper
floor”. UDO Section 4.1(B)(2). The NC District is identified to “accommodate a wide
variety of residential and nonresidential uses in a moderate intensity mixed-use
environment.” UDO Section 4.1(B)(2). Based on the purposes statements quoted
above for these two districts, compliance with the parking standard most closely
associated for the higher intensity zoning makes the most sense for projects that
propose parking within the UC district.
In applying the 1.5 spaces per dwelling unit minimum, it would require 54 parking
spots for the 36 proposed units. The updated parking plan shows 54 spots on the
garage level, with three (3) ADA compliant spaces and four (4) electrical charging
spaces – meeting the standards as applied in the NC District. This is shown on site
plan sheet C-1.13.
4) Provide additional, more robust lighting at the crosswalk on Hamilton.
The lighting plan has been updated to include a three-headed Sternberg light fixture at
the crosswalk on Hamilton Street, as shown on sheet C-4.20 of the Site Plan.
5) Provide more than minimal street trees, with specifics as to species.
The proposed street trees, one Maidenhair Tree on Broadway, and three Flowering
Dogwoods on Hamilton Steet have been increased from 4” cal. To 5” cal. at install.
Additionally, the original proposal included two Flowering Dogwoods on Hamilton
which has been revised to propose three Flowering Dogwoods – one more than
required by the UDO. All are shown on sheet C-4.10 of the Site Plan set.
6) Provide additional landscaping within the right of way of Broadway, with
additional plantings around trees.
As shown on Overall Planting Plan at Site Plan sheet C-4.10, the Applicant is
proposing a robust planting scheme in the right of way between the current, preserved
street tree and the new one to be added during construction.
7) Provide heated sidewalks within the City right of ways and in easement areas to
the north and south of the Property.
The Applicant will provide heated sidewalks within both easements and the right of
ways on both Hamilton Street and Broadway, subject only to a limitation on the
Broadway sidewalk if it is determined during construction that the heated sidewalk
would damage the root system of the existing tree that is to be preserved.
The Applicant is in negotiations with all property owners to the north and south, for
finalization of the revised easements, due to the changes in form and timing of the
current project versus the prior. The Applicant proposes that the Board approve the
plans for the easement modifications as submitted, with a condition that the
easements, once finalized, will be reviewed and approved for compliance by Code
Enforcement.
8) Provide staging plan with allowance for school use, street closure and crane plan.
Submitted herewith are a Construction Sequencing Plan and a School Traffic Logistics
Plan from the Applicant.
Pedestrian access around the site while under construction will be accommodated at
all times. At least one lane of Hamilton will be available at all times, for alternating
traffic, during daytime hours. Roadwork will be completed at night to minimize
disruption. During school pick-up and drop-off periods, construction vehicle
movements will be stopped and there will be spotters at construction entrances and
exits at all times.
9) Provide explanation of possibility of bicycle connectivity between Hamilton and
Broadway
The Applicant is proposing a widened multi-use path along southern easement through
the lands of the Saratoga Central Catholic that will allow for bicycle connection. This
is shown on site plan sheet C-1.10.
10) Provide location of required Civic Space.
Due to the site constraints, the Applicant has discussed off-site civic space with the
City Department of Public Works, as permitted by UDO Section 9.3(D)(8.). City DPW
has acknowledged that the Spirit of Life Fountain in Congress Park is in need of
restoration and repair and can serve as the in lieu of on-site civic space for the
Application. It is the position of the Applicant that combining the civic space
requirement for this Application with the existing civic space in the Congress Park
creates something that is of a higher public benefit than providing for civic space on
site
The Applicant anticipates receiving a letter confirming this restoration project as off-
site civic prior to the Board’s next meeting.
11) Provide detail as to lighting on building on North side for pedestrian walkway.
Sheet C-4.20 illustrates the proposed lighting fixtures and locations. On the north side
of the building, four Ashberry wall mount lights are proposed to replace the four post
light which currently exist along the sidewalk between Broadway and Hamilton Street.
12) Provide landscape plan and identification of final improvements in easement on
south side of the Property.
Sheet C-4.10 of the revised site plan provides detail as to the restoration of the 38 foot
easement on the land of Saratoga Central Catholic, and it is further shown in the
colorized site rendering. The Applicant is in negotiations with Saratoga Central
Catholic as to revisions to the current easement language. However, there is no
intention to modify the language to allow for any building installations in the easement
– namely as it is in the setbacks of the school’s property. The easement area will
generally be returned to its current condition as green space, with No Mow Lawn Seed
Mix, a fact sheet of which is submitted here.
13) Provide updated plans showing gas and electric meter location
As shown on the updated ground floor plan from RAMSA, the proposed location for
the gas meters will be on the southwest corner of the building. This area will be
buffered with tall grass plantings as shown on Site Plan page C-4.10. The proposed
location of the electrical meters will be in the garage area. Both are subject to
acceptance of location by National Grid.
14) Provide trash truck diagram for entering and exiting parking garage.
The Applicant has consulted with Casella Waste Management on trash pick-up. Due to
the discontinuance of the smaller-sized trash trucks in the area, the Applicant is no
longer able to proposed trash pick-up from the interior of the Building. Instead, there
will be two (2) four cubic yard dumpsters utilized by both the residential and
commercial occupants that will be brought via an electric dolly to Hamilton Street
curb on trash pick-up days. See the attached Waste Management Narrative, drafted by
the Applicant in concert with Casella for a full explanation of the process and timing.
A similar process is utilized for the trash pick up at the Adelphi along its secondary
frontage on Washington Street.
15) Provide calculation for square footage of trash room
The revised garage floor plan provides approximately 227 SF for refuse and recycling
storage for the Condominium units and 225 SF for the retail and amenity spaces.
These are split up into two separate trash rooms as shown on the Waste Management
Narrative and C-1.13 of the site plan.
16) Provide engineering analysis for groundwater conditions and foundation
construction.
Christopher Snyder P.E., of Spring Line Design the Structural Engineers for the
Project, has provided a Foundation Narrative, copy enclosed, based upon his prior
work and field studies conducted for a prior application for this site. Terracon
Consultant, Inc. has been retained by the Applicant to provide further geotechnical
recommendations. In coordination with Terracon, Christopher Snyder concludes that
a mat foundation and rock-socketed secant pile wall is the best foundation system for
this site.
Further, Terracon is actively coordinating a date to visit the site and recheck
groundwater levels using the well points installed a few years ago. The Applicant will
confirm that date and provide the results of those levels as soon as received.
17) Provide confirmation that the proposed two curb cuts on Hamilton Street are
acceptable to City Engineer
By memorandum dated October 16, 2026, City Engineer James Salaway has
acknowledged his acceptance of the proposed curb cuts of 11 feet on Hamilton Street,
a copy of which is enclosed.
18) Identify transformer location on Plans
Transformer location is proposed on the lands to the north belonging to Saratoga
Hospital, as identified on Site Plan Sheet C-3.10. The Applicant is within negotiations
with Saratoga Hospital as to the exact location and restructuring the existing
easement on their site to accommodate the proposed Project. This suggested location
is subject to final approval from National Grid.
19) Treatment of motor court for pedestrians with Motor Court Use diagram.
The motor court is designed to provide a clear pedestrian connection between the
building entrance and surrounding sidewalks, with paving, bollards, and landscape
treatments intended to distinguish pedestrian areas from vehicular circulation. Traffic
calming configurations such as raised pavement for pedestrian crossing, and safety
bollards are now proposed, as detailed on the ground floor plan.
20) Provide a Mirror at exit curb cut.
A detail for this has been submitted herewith by RAMSA on the ground floor and
motorcourt plans.
21) Personal delivery logistics (i.e. Amazon, food deliveries)
The Applicant is working with the City Engineering Office and City Assessor’s office
to establish the street addresses for the residential units to be associated with
Hamilton Street instead of Broadway. This will aid delivery, ride share and other
drivers in accessing the site in non-disruptive manner to the higher capacity street of
Broadway.
22) Provide pedestrian lighting in southern easement
Low level path lighting is proposed to follow the existing walkway from Broadway to
Hamilton Street. The proposed light fixtures will be dark sky compliant and no higher
than 42” tall. The intent of this lighting is to provide a subtle yet safe illuminated walk
between the two main streets without drawing too much attention visually to the space.
Additionally, the low-level lighting is provided to not interfere with the adjacent
residential units. Lighting details on page C-4.20 of the Site Plan.
23) Provide additional tree protection plan for current Broadway street tree.
The tree protection detail has been updated to reflect a more robust protection plan.
The previous detail included construction fencing surrounding the tree while the
proposed now includes chain link fence and specific details to avoid and potential
impacts to the tree, roots, and/or dripline during construction. See tree protection
detail at page C-5.10 of the Site Plan.
24) Provide explanation as to whether a green roof on actual roof is feasible
Due to the planned screening, necessary mechanical installations and proposed solar
installations on the roof, a green roof is not feasible on site.
25) Provide explanation as to whether geothermal or solar on roof would be feasible
As identified on the modified roof plan submitted herewith, the Applicant is proposing
approximately 4000sf of solar arrays, which will be utilized to offset on site electrical
power consumption. This is shown on the Roof Plan submitted by RAMSA.
Huston Engineering, who is performing the mechanical engineering work also studied
the potential for geothermal and concluded geothermal at the site is not be feasible for
the site square footage available.
On behalf of the Applicant, I request the Application be placed on the next available
Planning Board Agenda to review and discuss these responses.
As always, please feel free to contact me directly with any questions.
Very truly yours,
/s/ John B. Cannie
John B. Cannie, Esq.