Loading...
HomeMy WebLinkAbout20200083 South Broadway Hotel LOC estimate Cost Estimate for Letter of Credit PB#2o.x�cx Project No: 2016144 Project: 176 South Broadway Location: 176 South Broadway Saratoga Springs, New York Date: 2/3/2020 ON-SITE WORK Item Quantity Unit Unit Cost Subtotal Site Preparation and Gradinp Erosion Control (including silt fence &access) 1 LS $3,000.00 $3,000.00 Site Preparation 1 LS $7,000.00 $7,000.00 Hardscape Cast in Place Concrete 11,695 SF $5.50 $64,322.50 Asphalt Pavement 19,950 SF $3.50 $69,825.00 Cast in Place Concrete Curb 1,290 LF $18.00 $23,220.00 Site Amenities Traffic signs 21 EA $350.00 $7,350.00 Striping 1 LS $1,500.00 $1,500.00 Trees 6 EA $750.00 $4,500.00 Shrub 106 EA $100.00 $10,600.00 6' Ht. Vinyl Fence 345 LF $25.00 $8,625.00 Parking Lot lights 7 EA $3,500.00 $24,500.00 6" DIP water service 10 LF $50.00 $500.00 Connection to SAN 1 EA $5,500.00 $5,500.00 6" Sanitary line 7 LF $40.00 $280.00 Catch Basins/ Drain Inlets 7 EA $2,200.00 $15,400.00 Storm Manholes 1 EA $2,300.00 $2,300.00 Outlet Control Structure 1 EA $2,500.00 $2,500.00 Underground Infiltration System 1 LS $50,000.00 $50,000.00 12" HDPE Storm Line 350 LF $30.00 $10,500.00 Dumpster Enclosure 1 EA $2,500.00 $2,500.00 Yard Drain 1 EA $1,500.00 $1,500.00 On-Site Total $315,422.50 On-Site Total X.25 $78,855.63 OFF-SITE WORK Trees 7 EA $750.00 $5,250.00 Cast in Place Concrete-Heavy Duty Concrete 736 SF $7.50 $5,520.00 Cast in Place Concrete 2,408 SF $5.50 $13,244.00 Asphalt pavement 3,762 SF $3.50 $13,167.00 6" DIP water service 44 LF $50.00 $2,200.00 Water tapping sleeve and valve 1 EA $3,500.00 $3,500.00 Catch Basin 1 EA $2,500.00 $2,500.00 12" HDPE Storm Line 21 LF $30.00 $630.00 Decorative Street Light 4 EA $3,000.00 $12,000.00 Cast in Place Concrete Curb 525 LF $18.00 $9,450.00 Bike Rack 1 EA $500.00 $500.00 Traffic signs 5 EA $350.00 $1,750.00 Information Kiosk 1 EA $6,000.00 $6,000.00 As Built Drawings 1 LS $2,500.00 $2,500.00 Off-Site Total $78,211.00 Total Site Work 393 633.50 Letter of Credit Amounts Total off-site work $78,211.00 Total on-site work x .25 $78,855.63 Total $157,066.63 L.O.C. amount $157,100.00