Planning Board Members,
Mark wanted to make sure the board reviewed Mr. Levy ’s email regarding his subdivision proposal for Joseph
Street was reviewed by the membership. We will add it to the project file.
For Your Review,
Mike Tuller
OPED
From: Michael Tuller
Sent: Monday, October 5, 2026 10:42 AM
To: Mark Pingel <
Subject: FW: Information Needed by the Planning Board
Mark,
For your info. The applicant is aware the project will need an updated drawing for approval of the subdivision
use.
Mike
From: Jeffrey Levy <jlevy12203@gmail.com>
Sent: Monday, October 5, 2026 8:51 AM
To: Michael Tuller <Michael.Tuller@saratogaspringsny.gov>
Cc: Susan Barden <Susan.Barden@saratogaspringsny.gov>
Subject: Re: Information Needed by the Planning Board
Michael, My responses to your questions are below. At your suggestion, I have contacted EDP to discuss the Information request you sent. I do not know what their timing to respond to your request will be, but I will update you
Warning: Unusual sender <jlevy12203@gmail.com>
You don't usually receive emails from this address. Make sure you trust this sender before taking any
10/13/26, 11:58 AM Inbox - Mark Graham - Outlook
https://outlook.cloud.microsoft/mail/inbox/id/AAQkAGIxYTcxODdiLTE4ZmUtNDdlMy05MTNlLTA4ZjY5NTFhMDAzMQAQAOWpXuXSRclBlUsWCk9x26…1/5
actions.
Michael,
My responses to your questions are below. At your suggestion, I have contacted EDP to discuss the Information
request you sent. I do not know what their timing to respond to your request will be, but I will update you
accordingly.
Please feel free to call me if you have any questions or need further clarification on anything.
Respectfully,
Jeff Levy
Jeffrey M. Levy 🇺🇸
25 Joseph Street
Saratoga Springs, New York 12866
(518) 694-2983
On Oct 2, 2026, at 7:30 PM, Michael Tuller <Michael.Tuller@saratogaspringsny.gov> wrote:
Jeff,
During the Planning Board Workshop last evening the board
members had several questions about your project related to the
proposed lot line adjustment and final plat/subdivision review for
the adjacent property at 21 Joseph Street.
Questions Posed and Additional Information Requested:
Project Narrative beyond the application description provided.
Introduction:
My goal with this project is to continue to support the gentrification of the west side of Joseph Street, integrating
with the properties within The Elms Subdivision which encompasses Elm Street, Persimmon Place and Joseph
Street.
I purchased 21 Joseph Street in July, 2026. The property has not been maintained over the years, and is in a
severe state of disrepair.
I purchased the property at 25 Joseph Street in September, 2020. At that time, the residence was unoccupied and
the house and maintenance of the entire property had fallen into a state of significant disrepair. I raised the
house, and built a new residence in 2021-2022. The below photos present a before and after depiction of what I
completed.
10/13/26, 11:58 AM Inbox - Mark Graham - Outlook
https://outlook.cloud.microsoft/mail/inbox/id/AAQkAGIxYTcxODdiLTE4ZmUtNDdlMy05MTNlLTA4ZjY5NTFhMDAzMQAQAOWpXuXSRclBlUsWCk9x26…2/5
Before:
After:
Project Description:
I reside at 25 Joseph Street. I recently purchased 21 Joseph Street which is contiguous to my residence at 25
Joseph Street.
My Project consists of a Two Part request. I would refer you to the proposed survey I have submitted.
The first request is the proposed Lot Line Adjustment Application impacting 21 & 25 Joseph Street, two
contiguous residential properties that I own, number 25 being my primary residence.
In cooperation with the former owner of 21 Joseph Street, I landscaped and have maintained an approximate 5’
wide section along our property line since I built my house in 2022. I am requesting approval of the Lot Line
Adjustment to formally integrate/consolidate the proposed 5’ x 175’ section (879 sq. ft.) of the 21 Joseph Street
property into my 25 Joseph Street property.
The second part of my request is to subdivide the remainder of 21 Joseph, which would total approximately
21,168 sq. ft. (.50 Acres), into two conforming residential building lots, each totaling approximately 10,500 sq. ft.
(.25 Acres), measuring 60’ wide x 175’ deep, subject to raising the existing residence at 21 Joseph. My objective is
to sell proposed Lots A & B to a third parties for the construction of single family residences.
Reasoning for amending the lot line 5’ along 25 Joseph Street.
As noted above, in cooperation with the former owner of 21 Joseph Street, I Landscaped and have maintained an
approximate 5’ wide section along our property line since I built my house in 2022. I am requesting approval of
the Lot Line Adjustment to formally integrate/consolidate the proposed 5’ x 175’ section (879 sq. ft.) of the 21
Joseph Street property into my 25 Joseph Street property.
Rationale for dedicated land 2.5’ along 25 Joseph Street parcel
being conveyed to the City of Saratoga Springs, previously.
This notation on the survey pre-dates my ownership of the subject property, and appears to have been carried
forward from a prior survey. I do not have any details regarding this item, but I have attached a copy of the
document on file with the Saratoga County Clerks Office (Book 1464 of Deeds at page 44, recorded June 17, 1997)
which I located. You will note that the document states “This conveyance is made pursuant to an approval of the
Saratoga Springs Planning Board dated November 2, 1994 (Map # S-199)”.
Subdivision and Final Plat review will necessitate providing an
engineered drawing showing the proposed buildings placed
10/13/26, 11:58 AM Inbox - Mark Graham - Outlook
https://outlook.cloud.microsoft/mail/inbox/id/AAQkAGIxYTcxODdiLTE4ZmUtNDdlMy05MTNlLTA4ZjY5NTFhMDAzMQAQAOWpXuXSRclBlUsWCk9x26…3/5
within existing setback measures provided for the two parcels
proposed at 21 Joseph Street. The drawing will need to show
utility connections (water, sanitary sewer, power, gas, etc., as
appropriate) from the street to the proposed buildings.
Property will be evaluated for streetscape amenities that may
include curb & gutter, sidewalk along new home frontages with
street lights, street trees to be evaluated per the code for new
subdivisions. Questions related to tree removal and proposed
site improvements will also be discussed by the board
members.
As the plan is to sell the two lots and have the end buyers construct their own homes, we anticipated these
requirements would be more of a building permit procedure requirement.
The subject property is currently a residential property, and serviced by existing infrastructure for water, sewer,
stormwater, gas and electric. There will be no change to elevations of the property, and utility poles already exist
to service the property. There will be limited tree removal.
I would like it noted that the West side of Joseph Street is NOT identified as “Sidewalk Recommendations” in
the Complete Streets Plan Map of the Complete Streets Plan 2022 Update. The East side of Joseph meets the
requirements of The Plan, so I would respectfully request reconsideration of some of the items outlined in the
streetscape amenities noted above.
Regarding the “streetscape amenities”, I wanted to note that 21 Joseph Street is boardered by two fairly recently
completed demolition and reconstruction of new residences (17 Joseph and my home at 25 Joseph). Neither of
these approvals addressed streetscape amenities, and do not have sidewalks. I requested the City Public Works
Department to install curbing at 25 Joseph, which I paid for. If I were to make a recommended resolution for the
approval of my application, it could certainly include the requirement to install curbing consistent with the curbing
at 25 Joseph.
Cost estimate needed.
Further clarification needed.
Engineering Report needed.
Clearer definition of this request is needed. What information are you looking for the Engineering Report to
address?
The proposed subdivision is scheduled for a public hearing next week
Thursday regarding the questions referenced above. You may want
to discuss with EDP your pending application and deliverables
needed as part of the Planning Board’s comprehensive review effort.
10/13/26, 11:58 AM Inbox - Mark Graham - Outlook
https://outlook.cloud.microsoft/mail/inbox/id/AAQkAGIxYTcxODdiLTE4ZmUtNDdlMy05MTNlLTA4ZjY5NTFhMDAzMQAQAOWpXuXSRclBlUsWCk9x26…4/5
Respectfully,
Mike Tuller