Loading...
HomeMy WebLinkAbout20260860 Union Ave & Gilbert Rd Verizon Utility Poles - Modification ApplicationSubject to the 60-day FCC Shot Clock Timeframe Set Forth in 47 CFR §1.6003(c)(1)(i) DESIGN REVIEW BOARD CITY OF SARATOGA SPRINGS,SARATOGA COUNTY,NEW YORK In the Matter of the Application of CELLCO PARTNERSHIP d/b/a Verizon Wireless Utility Pole No.NM 21-Along Union Ave. Utility Pole No.NG 24-Along Union Ave. Utility Pole No.NM 33/VZ 14-Along Union Ave. Utility Pole No.NG 39/VZ 16-Along Union Ave. Utility Pole No.NG 51/VZ 29-Along Union Ave. Utility Pole No.NG 64-Along Union Ave. Utility Pole No.NG 32½-Along Gilbert Rd. Saratoga Springs,New York 12866 APPLICATION FOR DESIGN REVIEW BOARD APPROVAL and STATEMENT OF INTENT Submitted by: Verizon Wireless Alexander Bell -Network Real Estate 175 Calkins Rd Rochester,New York 14623 (585)321-5407 Tectonic Engineering &Surveying Consultants,P.C. Steven Matthews,P.E. 36 British American Blvd,Suite 101 Latham,New York 12110 (518)783-1630 Tectonic Engineering &Surveying Consultants,P.C. Larry Rolison,Senior Site Acquisition Specialist 36 British American Blvd,Suite 101 Latham,New York 12110 (518)783-1630 Please Direct All Correspondence To: Young/Sommer LLC David C.Brennan,Esq. 500 Federal Street,5th Floor Troy NY,12180 (518)438-9907 Dated:September 30,2026 Subject to the 60-day FCC Shot Clock Timeframe Set Forth in 47 CFR §1.6003(c)(1)(i) DESIGN REVIEW BOARD of the CITY OF SARATOGA SPRINGS SARATOGA COUNTY,NEW YORK In the Matter of the Application of CELLCO PARTNERSHIP d/b/a Verizon Wireless Premises:Utility Pole No.NM 21 -Along Union Ave. Utility Pole No.NG 24 -Along Union Ave. Utility Pole No.NM 33/VZ 14 -Along Union Ave. Utility Pole No.NG 39/VZ 16 -Along Union Ave. Utility Pole No.NG 51/VZ 29 -Along Union Ave. Utility Pole No.NG 64 -Along Union Ave. Utility Pole No.NG 32 ½-Along Gilbert Rd. Saratoga Springs,New York 12866 STATEMENT OF INTENT and APPLICATION FOR DESIGN REVIEW BOARD APPROVAL Purpose and Need CELLCO PARTNERSHIP d/b/a Verizon Wireless ("Verizon Wireless"or the "Applicant")proposes to upgrade the existing unmanned public utility/personal wireless service facilities (each a "communications facility")at the above seven locations located along Union Avenue and Gilbert Road.The application includes:the removal of the existing equipment and replacement with new equipment;the removal and replacement of utility pole no.NM 33/VZ 14; the removal and replacement of utility pole no.NG 39/VZ 16;and the removal and replacement of utility pole no.NG 321/2. The existing Outdoor Distributed Antenna System ('ODAS")system is collocated on seven existing utility poles and was approved by the Design Review Board by decision dated May 20,2016 (Application #201.6.041)[see TAB 1].The western end of the system is located at utility pole no.NM 21 and is referred to as Node #1 which is in front of the Saratoga Race Course [see Zoning Drawings of Tectonic Engineering Consultants,Geologists &Land Surveyor, D.P.C.("Tectonic Engineering")at TAB 61.Moving east along Union Avenue,antennas are mounted on utility pole no.NG 24 (Node #2),utility pole no.NM 33 /VZ 14 (Node #3),and utility pole no.NG 39 /VZ 16 (Node #4).The system crosses the Northway and resumes on utility pole no.NM 51 /VZ 29 (Node #5),utility pole no.NG 64 (Node #6),and utility pole no. NM 32 ½on Gilbert Avenue (Node #7). NODE #1 -Existing Pole;New and Replacement Equipment The Applicant proposes to install on an existing 38.7±foot tall utility pole no.NM 21 (Node #1):(1)a replacement single,cylindrical antenna (approximately 24 in.tall x 1.4.6 in.in diameter)mounted at the top of the pole at a proposed antenna tip height of 44.9±feet (current tip height is 42.2±feet);(2)two additional 5G-only panel antennas (163/4 in.tall x 9.5 in.wide)to be attached to the proposed antenna mount;(3)electric and telecommunications equipment on the utility pole at a minimum approximate height of 8'above grade.All proposed equipment will be painted brown as noted on Sheet C-2 and consistent with prior DRB approvals for similar projects.The property is located in the right-of-way along Union Ave.,City of Saratoga Springs,Saratoga County,New York in the institutional Horse Track Related (INST-HTR)zoning district and additionally is located within the historic review and architectural review overlay districts [Zoning Drawings of Tectonic Engineering at TAB 6,sheet C-2]. NODE #2-Existing Pole;New and Replacement Equipment The Applicant proposes to install on an existing 38.2±foot tall utility pole no.NC 24 (Node #2):(1)a replacement single,cylindrical antenna (approximately 24 in.tall x 14.6 in.in diameter) mounted at the top of the pole at a proposed antenna tip height of 44.4±feet (current tip height is 40.6±feet);(2)two additional 5C-only panel antennas (1.6/4 in,tall x 9.5 in.wide)to be attached to the proposed antenna mount;(3)electric and telecommunicatio ns equipment on the utility pole at a minimum approximate height of 8'above grade.All proposed equipment will be painted brown as noted on Sheet C-3 and consistent with prior DRB approvals for similar projects.The property is located in the right-of-way along Union Ave.,City of Saratoga Springs,Saratoga County,New York in the Institutional Horse Track Related (INST-HTR)zoning district and additionally is located within the historic review and architectural review overlay districts [Zoning Drawings of Tectonic Engineering at TAB 6,sheet C-3]. NODE #3 -Replacement Pole;New Equipment The Applicant proposes to install on a 38.5±foot tall replacement utility pole no.NM 33/ VZ 14 (Node #3)(existing utility pole measures 32.0±feet in height):a single,cylindrical antenna (approximately 24"tall x 14.6"in diameter)mounted at the top of the pole at a proposed antenna tip height of 42.0±feet along with the installation of electric and telecommunications equipment on the utility pole at a minimum approximate height of 8'above grade.All proposed equipment will be painted brown as noted on Sheet C-4 and consistent with prior DRB approvals for similar projects.The property is located in the right-of-way along Union Ave.,City of Saratoga Springs,Saratoga County,New York in the Institutional Horse Track Related (INST-HTR)zoning district and additionally is located within the historic review and architectural review overlay districts [Zoning Drawings of Tectonic Engineering at TAB 6,sheet C-4]. NODE #4-Replacement Pole;New Equipment The Applicant proposes to install on a 43.0±foot tall replacement utility pole no.NC 39/VZ 16 (Node #4)(existing utility pole measures 38.8±feet in height):a single,cylindrical antenna (approximately 24"tall x 14.6"in diameter)mounted at the top of the pole at a proposed antenna tip height of 46.5±feet along with the installation of electric and telecommunications equipment on the utility pole at a minimum approximate height of 8'above grade.All proposedequipmentwillbepaintedbrownasnotedonSheetC-5 and consistent with prior DRB approvals for similar projects.The property is located in the right-of-way along Union Ave.,City of Saratoga Springs,Saratoga County,New York in the Institutional Educational (INST-ED)zoning district and additionally is located within the historic review and architectural review overlay districts [Zoning Drawings of Tectonic Engineering at TAB 6,sheet C-5]. NODE #5-Existing Pole;New Equipment The Applicant proposes to install on an existing 44.1±foot tall utility pole no.NC 51/VZ 29 (Node #5):a single,cylindrical antenna (approximately 24"tall x 14.6"in diameter)mounted at the top of the pole at a proposed antenna tip height of 47.6±feet along with the installation of electric and telecommunications equipment on the utility pole at a minimum approximate height of 8'above grade.All proposed equipment will be painted brown as noted on Sheet C-6 and consistent with prior DRB approvals for similar projects.The property is located in the right-of-way along Union Ave.,City of Saratoga Springs,Saratoga County,New York in the Rural Residential (RR)zoning district and additionally is located within architectural review overlay district [Zoning Drawings of Tectonic Engineering at TAB 6,sheet C-6]. NODE #6 -Existing Pole,New Equipment The Applicant proposes to install on existing 37.3±foot tall utility pole no.NC 64 (Node #6):a single,cylindrical antenna (approximately 24"tall x 14.6"in diameter)mounted at the top of the pole at a proposed antenna tip height of 40.9±feet along with the installation of electric and telecommunications equipment on the utility pole at a minimum height of 8'above grade.All proposed equipment will be painted brown as noted on Sheet C-7 and consistent with prior DRB approvals for similar projects.The property is located in the right-of-way along Union Ave.,City of Saratoga Springs,Saratoga County,New York in the Rural Residential (RR)zoning district and additionally is located within architectural review overlay district [Zoning Drawings of Tectonic Engineering at TAB 6,sheet C-7]. NODE #7-Replacement Pole,New Equipment The Applicant proposes to install on a 38.5±foot tall replacement utility pole no.NC 32'/2 (Node #7)(existing utility pole measures 33.4±feet in height):a single,cylindrical antenna (approximately 24"tall x 14.6"in diameter)mounted at the top of the pole at a proposed antenna tip height of 42±feet along with the installation of electric and telecommunications equipment on the utility pole at a minimum height of 8'above grade.All proposed equipment will be painted brown as noted on Sheet C-8 and consistent with prior DRB approvals for similar projects.The property islocatedintheright-of-way along Gilbert Rd.,City of Saratoga Springs,Saratoga County,New York in the Rural Residential (RR)zoning district [Zoning Drawings of Tectonic Engineering at TAB 6,sheet C-8]. II.Summary Upon completion,these upgrades will provide an improved 4G/5G coverage layer alongtheapproximately2-mile stretch of Union Avenue between Saratoga Race Course and Gilbert Rd. In addition to Union Avenue,significant coverage reliability and network performance improvements will extend across the I-87 Exit 14 interchange,vehicles traveling 1-87 near Exit 14, 0.4±miles along Gilbert Rd,and the homes along Gilbert Rd and Piping Rock Circle,as shownontheproposedcoveragemap.[Proposed Coverage Map at TAB 3]. Verizon Wireless is considered a public utility for land use purposes under New York decisional law (Cellular Telephone Company v.Rosen.berg1,82 N.Y.2d 364 [1993]),and a provider of"personal wireless services"under the federal Telecommunication s Act of 1996 (the "TCA").Verizon Wireless'equipment will be in operation twenty-four (24)hours a day,seven (7)days aweek,three hundred sixty-five (365)days a year. I In Rosenberg,the State's highest Court determined that the ordinary variance standard is inapplicable and a cellular telephone company applying for relief need only show that (1)the relief is "required to render safe and adequateservice,"and (2)there are "compelling reasons,economic or otherwise,"for needing the variance.Cellular TelephoneCompanyv.Rosenberg,82 N.Y.2d 364,372 (1993). Verizon Wireless is applying for review by the Design Review Board.2 The subject utility poles are located in the Rural Residential (RR),Institutional Horse Track Related (INST-HTR), and Institutional Educational (INST-ED)Zoning Districts.Additionally,the Union St,utility poles are located in the Architectural Review District.Nodes #1,#2,#3,and #4 are located in the Historic District. The proposed communications facilities are unmanned and will be visited for routine maintenance purposes approximately two times per year (only as needed).As such,the project will not have any impact on existing water and sewage services.In addition,neither pedestrian nor vehicular access to the premises will be impacted [see Zoning Drawings at TAB 6]. III.Compliance with City Requirements The proposed communications facilities comply in all material respects with City requirements: 1.SEQRA:A Short Environmental Assessment Form is attached as TAB 2. 2.Minimum Visual Impact:As noted above,Verizon Wireless'proposed facilities are designed to have a minimum possible visual effect on the surrounding community and neighborhood [TAB 4]. 3.Site Plan:The Applicant has provided.Zoning Drawings that identify the proposed improvements [TAB 6]. Based upon the foregoing,Verizon Wireless respectfully submits that approval is appropriate in this case. IV.Conclusion The communications facilities proposed are public necessities under Rosenberg in that they are required to render and improve adequate and safe service to this area of the City of Saratoga Springs.In an effort to improve existing telecommunications services to this area of the City, Verizon Wireless seeks approval to upgrade these facilities. The facilities will not be noticeable to the traveling public or nearby property owners.The communications system proposed has been sited to have the least practical adverse visual effect on the environment,and any resulting impact(s)may properly be considered minimal in nature and scope. Attached to this Application and Statement of Intent are the following: 1)An Application for Architectural/Historic Review by the Design Review Board and copyofpriordecision; 2 For the reasons set forth herein,Verizon Wireless believes that its project complies in all material respects with theprovisionsoftheCityofSaratogaSpringsLandUseLawsand,consistent with the application process established bytheCityforpriorSmallCellapplications,that no additional approvals or relief are required.To the extent that anadditionalapprovalorreliefisrequired,Verizon Wireless submits these materials in support of such approval(s). 4 2)A Short Environmental Assessment Form; 3)Radio Frequency Coverage Plots: 4)Photosimulations of the proposed installation and SEQRA Visual EAF Addendum; 5)Radio Frequency -Compliance Reports for each location;and 6)Project Zoning Drawings. Kindly place this matter on the agenda for discussion at the next available meeting o£the Design Review Board.In the meantime,if you should have any questions or require any additional information concerning this project,I can be reached at (518)438-9907. Thank you for your consideration. Respectfully submitted, CELLCO PARTNERSHIP d/b/a Verizon Wireless c /L David C.Brennan,Esq. Regional Local Counsel Dated:September 30,2026 [FOR OFFICE USE1 (Application #) (Date received) (Project Title) Staff Review ATTORNEY/AGENT David C.Brennan,Esq. 500 Federal St,Fl 5 *"HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** 'CITY OF SARATOGA SPRINGS •1. .DESIGN REVIEW BOARD CITY HALL -474 BROADWAY,2 5ARATOGA SPRINGS,NEW YORK 12866-2296 caR g yNOR"'E°TEL:518-587-3550 X2533 www.saratoga-spnngs.org APPLICATION FOR: ARCHITECTURAL!HISTORIC REVIEW APPLICANT(S)*OWNER(S)(lfnotapplicant) Cellco Partnership d/b/a Verizon Wirele National GridName Address 175 Calkins Rd Rochester NY 14623 Phone / Email 300 Erie Blvd West Syracuse NY 13202 Troy NY 12180 /518-438-9907/x224 dbrennan@youngsommer.com ❑Owner 8 Attorney/AgentIdentifyprimarycontactperson:❑Applicant *An applicant must be the property owner,lessee,or one with an option to lease or purchase the property in question. Applicant's interest in premises:❑Owner ®Lessee ❑Under option to lease or purchase PROPERTY INFORMATION Tax Parcel #:N/A (tor example:/65.52-4-37) Property Address/Location:ROW along Union Ave Date Acquired by Owner: INST-HTR;Current Zoning District:____RR Property use:❑Residential D Non-residential/mixed-use Type of Review:❑Architectural ❑Historic Extension/modificatio n (of current approval) Summary description of proposed action: Upgrade to equipment associated with an existing unmanned public utility/personal wireless service facility located on wooden utility pole;proposed replacement of utility pole and antennas and equipment ❑No a Yes -date(s)?4/20/2016HasapreviousapplicationbeenfiledwiththeDRBforthisproperty? -App.No.(S)?2016.041 Revised 12/2025 A "complete"application consists of 1 hard copy (original),and I electronic copy of application &ALL other materials as required below: New Construction /Additions 8 Color photographs showing site/exterior details of existing structures and adjacent properties ®A detailed scaled site plan is essential for achieving minimal zoning compliance,depicting both current and planned structures along with all building projections such as decks,porches,steps,roof overhangs,and chimneys.This site plan must show all setbacks from property boundaries and any easements,in addition to the dimensional and bulk standards relevant to the zoning district on 17"x11"sheet. e Elevation drawings showing design of all sides of existing &proposed construction -label dimensions,colors,materials,lighting (fixture &lamp type,wattage),etc.-include compass bearing &scale;no larger than 2'x3'sheet -smaller permitted if legible ❑Floor plans for proposed structure;on sheet no larger than 2'x3'-smaller permitted if legible 8 Product literature,specifications and samples of proposed materials and colors Change in exterior building materials (windows,doors,roof,siding,etc.),or color (in non-residential districts only) ❑Color photographs showing site/exterior details of existing structures and that illustrate affected features ❑Elevation drawings showing all sides of existing &proposed construction -label dimensions,colors,materials,lighting (fixture &lamp type,wattage),etc.-include compass bearing &scale;no larger than 2'x3'sheet -smaller permitted if legible ❑Product literature,specifications and samples of proposed materials and colors Within front yard setbacks in Historic Districts only (Front setbacks:UR-I &INST-HTR=30':UR-4 '25';UR-2,UR-3 &NCUD-I =10') -Installation,removal or change in material of drive-and walkways -Installation or removal of architectural,sculptural or vegetative screening over 3'in height -Installation of accessory utility structures or radio/satellit e transmission/reception devices (more than 2'diameter) For any of above: ❑Color photographs showing site/exterior details of existing structures,and of adjacent properties ❑Site plan showing existing &proposed construction:include property lines &dimensions,required &proposed setbacks &lot coverage,site features (fences,walks,trees,etc.)street names,compass bearing &scale;no larger than 2'x3'sheet -smaller preferred if legible ❑Product literature,specifications and samples of proposed materials and colors Signage /Awnings ❑Color photographs showing site/exterior details of existing structures,and adjacent properties ❑Plan showing location of proposed sign/awning structure on building/premises:no larger than I I "x 17" ❑Scaled illustration of proposed sign/awning structure and lettering (front view &profile):include all dimensions of structure;type, dimensions and style of lettering or logo;description of colors,materials,mounting method and hardware ❑Descriptions,specifications of proposed lighting including fixture &lamp type,wattage,mounting method,and location ❑Product literature,specifications and samples of proposed materials and colors Demolition ❑Color photographs showing site/exterior details of existing structures,and of adjacent properties ❑Site plan showing existing and any proposed structures -include dimensions,setbacks,street names,compass bearing,and scale ❑Written description of reasons for demolition and,in addition: ❑For structures of "architectural/historical significance",demonstrate "good cause"why structure cannot be preserved ❑For structures in an architectural district that might be eligible for listing on National Register of Historic Places,or for a "contributing"structure in a National Register district (contact City staff),provide plans for site development following demolition - include a timetable and letter of credit for project completion Telecommunication facilities 8 Color photographs showing site/existing structures,and of adjacent properties B Site plan showing existing and proposed structures:include dimensions,setbacks,street names,compass bearing,and scale B Scaled illustration of proposed structures:include all dimensions;colors,materials,lighting,mounting details ®Consult Article 240-12.22 of the City's Zoning Ordinance and City staff to ensure compliance with requirements for visual impact assessment and existing and proposed vegetative screening Revised (2/2025 Request for extension of current approval ❑Identify date of original DRB approval:Current expiration date:Org.App.No. ❑Describe why this extension is necessary and whether any significant changes have occurred either on the site or in the neighborhood.SEQR Environmental Assessment Form B Applicants proposing the following must complete "Part I"of the SEQR Short Environmental Assessment Form (available here: http://www.dec.ny.gov/docs/permitseioperations pdf/seafpartone.p df): -Construction or expansion of a multi-family residential structure (4 units +) -Construction or expansion (exceeding 4,000 sq.ft.gross floor area)of a principal or accessory non-residential structure -Telecommunications facility,radio antennae,satellite dishes -Demolition Disclosure Does any City officer,employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809)in this application? 8 No ❑Yes..If yes,a statement disclosing the name,residence,nature,and extent of this interest must be filed with this application. Certification /we,the property owner(s),or purchasers)/lessee(s)under contract,of the land in question,hereby request an appearance before the Design Review Board. By the signature(s)attached hereto,I/we certify that the information provided within this application and accompanying documentation is,to the best of my/our knowledge,true and accurate.I/we further understand that intentionally providing false or misleading information is grounds for immediate denial of this application. I/we hereby authorize the members of the Design Review Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. Furthermore,I/we agree to meet all requirements under Article VII for Historic Review or Article VIII for Architectural Review of the Zoning Code of the City of Saratoga Springs.Date:9/30/2026 (applicant signature) Date: (applicant signature) If applicant is not the currently the owner of the property,the current owner must also sign. Owner Signature:Date: Owner Signature:Date: Revised 12/2025 Node1 Node2 Node3 Node4 Node5 Node6 Node7 4G/5G Coverage: 2100 MHz, -85 dBm RSRP Proposed New/Improved 4G/5G Coverage Figure 1a – Proposed Saratoga Exit 14 DAS-to-Microcell Upgrade Project. Expected 4G/5G Coverage and Performance Improvement Area I-87 I-87 Exit 14 Node1 Node2 Node3 Node4 Node5 Node6 Node7 4G/5G Coverage: 2100 MHz, -85 dBm RSRP Proposed New/Improved 4G/5G Coverage Figure 1b – Proposed Saratoga Exit 14 DAS-to-Microcell Upgrade Project. Expected 4G/5G Coverage and Performance Improvement Area I-87 I-87 Exit 14 Looking West from the intersection of Oklahoma Ave and Union Ave. The proposed Verizon Wireless Equipment will be visible from this location.N-1 Distance from the photographic location to the proposed site is 190'±13414.078 S -1 13414.078 Looking West from the intersection of Oklahoma Ave and Union Ave. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 190'± N-2 13414.078 Looking West from along Union Ave. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 116'± Looking West from along Union Ave. The proposed Verizon Wireless Equipment will be visible from this location.S -2 Distance from the photographic location to the proposed site is 116'±13414.078 N-3 13414.078 Looking West from along Union Ave. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 130'± S -3 13414.078 Looking West from along Union Ave. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 130'± Looking West from the intersection of Union Ave and Henning Rd. The proposed Verizon Wireless Equipment will be visible from this location.N-4 Distance from the photographic location to the proposed site is 250'±13414.078 S -4 13414.078 Looking West from the intersection of Union Ave and Henning Rd. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 250'± Looking West from the I-87 exit 14 off ramp to Union Ave. The proposed Verizon Wireless Equipment will be visible from this location.S -5 Distance from the photographic location to the proposed site is 200'±13414.078 N-5 13414.078 Looking West from the I-87 exit 14 off ramp to Union Ave. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 200'± N-6 13414.078 Looking East from along Union Ave. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 80'± Looking East from along Union Ave. The proposed Verizon Wireless Equipment will be visible from this location.S -6 Distance from the photographic location to the proposed site is 80'±13414.078 Looking Southeast from the intersection of Piping Rock Circle and Gilbert Rd. The proposed Verizon Wireless Equipment will be visible from this location.N-7 Distance from the photographic location to the proposed site is 155'±13414.078 S -7 13414.078 Looking Southeast from the intersection of Piping Rock Circle and Gilbert Rd. The proposed Verizon Wireless Equipment will be visible from this location. Distance from the photographic location to the proposed site is 155'± 1 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 Verizon Wireless Site Compliance Report Site name - Saratoga Exit 14 Node 1 Site Name: Saratoga Exit 14 Node 1 Site Address: 244 Union Ave, Saratoga Springs, NY, 12866 Structure Type: Utility Pole Report Information Report Date: Feb 23, 2026 Report Generated by: Mamta Verma Customer Contact: Rick Andras Compliance Statement Verizon Compliance Statement: Verizon Wireless is compliant with FCC rules and regulations in all publicly accessible areas. DavidC.Cotton,Jr. LicensedProfessionalEngineer StateofNewYork,086838 Date:2026-Feb-28 :ItisaviolationofNewYorkStateLaw,Article145,Section §7209foranyperson,unlessacting underthedirectionofalicensedprofessionalengineer,toalterthisdocumentinanyway. 2 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary ................................................................................................................................................. 3 2. Antenna Inventory ................................................................................................................................................... 4 3. Analysis ................................................................................................................................................................... 5 4. Appendix A: Reference Information ......................................................................................................................... 6 3 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary Verizon Wireless has contracted with Circet USA, an independent Radio Frequency consulting firm, to determine if the proposed telecommunications facility is in compliance with Federal Communications Commission (FCC) rules and regulations regarding RF exposure as defined in 47 CFR § 1.1307(b) and 1.1310. This document and the conclusions herein are based on the information provided by representatives of Verizon Wireless which is assumed to be true and correct. All information used in this report was analyzed to determine compliance in publicly accessible areas, in particular at ground level. The analysis evaluates the telecommunications facility with respect to the General Population/Uncontrolled Maximum Permissible Exposure (MPE) limits. Circet USA has taken into consideration the Verizon Wireless antenna system as well as any existing antenna systems at the subject location. Verizon Wireless final antenna count is (3) antenna. Based on the analysis, Circet USA has determined that: Verizon Wireless is compliant in all publicly accessible areas with the FCC rules and regulations governing human exposure to RF electromagnetic fields as described in 47 CFR § 1.1307(b) and 1.1310. With the proposed Verizon Wireless antenna configuration in service, the composite exposure from this facility in all areas at ground level will be less than 1% of the General Population MPE limit, or over 100 times less than the maximum allowed exposure in publicly accessible areas. 4 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 2. Antenna Inventory The table below contains data provided by Verizon Wireless representatives and/or gathered by Circet USA personnel. This data was used to perform the RF exposure analysis. Notes: Each row with the same number in the Antenna ID column references the same physical antenna. Power values provided by the client and used in the analysis may be greater than what is initially deployed. 80% TDD Duty Cycle and 100% FDD Duty Cycle are used. Jumper/connector/coax power losses between RRHs and antenna: AWS/PCS: 2 dB C-band: 2.5 dB Ant ID Owner Antenna manufacturer Antenna model Mech. Tilt (°)Azimuth (°) Height (ft) Frequency band Elec. Tilt (°)HBW (°) VBW (°) Total power (Watts)Gain (dBd) ERP (Watts) 1 Verizon JMA Wireless CX20OMI265-3S1010 0 260 43.9 PCS1900 10 69.4 26 63.55 10.25 673.12 1 Verizon JMA Wireless CX20OMI265-3S1010 0 260 43.9 LTE 2100 10 69.4 26 95.32 10.25 1009.67 1 Verizon JMA Wireless CX20OMI265-3S1010 0 260 43.9 4GHz 0 53.6 20.6 142.9 11.65 2090.02 2 Verizon Samsung AT1K04 Envelope 0 150 41.1 28GHz 0 112 35 1.27 25.75 477.66 3 Verizon Samsung AT1K04 Envelope 0 270 41.1 28GHz 0 112 35 1.27 25.75 477.66 5 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 3. Analysis Circet USA has included the Verizon Wireless antenna system at the subject location in the analysis. All existing and proposed antennas are listed in the antenna table above. Engineering assumptions were used when specific antenna or operating parameter information was not available for the other existing collocated antennas (if applicable). Using this data, software modeling using IXUS software was performed for all transmitting antennas located at the site. Circet USA has assumed a 100% duty cycle and maximum radiated power. The site has been modeled with these assumptions to determine the maximum potential RF energy density at ground level. Circet USA believesthistobeaworst‐caseanalysisbased on the best available data. As stated previously, based on this analysis, the calculated ground level exposure from the Verizon Wireless antenna system alone is less than 1% of the General Population MPE limit. Keep in mind that the FCC did not arbitrarily establish their own standards but rather adopted the recommendations of national and international organizations such as the National Council on Radiation Protection and Measurements (NCRP), the American National Standards Institute (ANSI) and the Institute of Electrical and Electronics Engineers (IEEE). These recommendations were developed by expert scientists and engineers following extensive evaluation of the potential biological effects from RF exposure. The FCC MPE limits are based on thresholds for known adverse effects, and they were designed to provide a substantial margin of safety. There is a safety factor of 50 built into the General Public MPE limits, and the predicted Verizon Wireless exposure levels are over 100 times below these very conservative limits. In cases where such compliance exists, the subject of electromagnetic field safety is preempted by the Telecommunications Act of 1996, which states: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the (Federal Communication) Commission’s regulations concerning such emissions.” The graph below provides a visual depiction of the rather insignificant electromagnetic field exposure contribution from the Verizon Wireless antenna system out to a distance of 500’ from the base of the structure. This portrays how low the Verizon Wireless contribution is when compared to the General Population MPE limit. 6 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 4. Appendix A: Reference Information FCC Rules & Regulations All information used in this report was analyzed as a percentage of the MPE limits as detailed in 47 CFR § 1.1310. The calculated power density at each sample point divided by the limit at each calculated frequency provides a result in % MPE. Summing the calculated % MPE from all contributors provides accumulative % MPE at a particular sample point. Wireless carriers use different frequency bands with varying MPE limits; therefore, it is useful to report results in terms of % MPE as opposed to power density. All results were compared to the FCC radio frequency exposure rules as detailed in 47 CFR § 1.1307(b) to determine compliance with the MPE limits for General Population/Uncontrolled environments as defined below: Two Classifications for Exposure Limits Occupational – Applies to situations in which persons are “exposed as a consequence of their employment” and are “fully aware of the potential for exposure and can exercise control over their exposure”. General Population – Applies to situations in which persons are “exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure”. Generally speaking, those without significant and documented RF Safety & Awareness training would be in the General Population classification. Environment Classification Controlled – Applies to environments that are restricted or “controlled” in order to prevent access from members of the General Population classification. Uncontrolled – Applies to environments that are unrestricted or “uncontrolled” that allow access from members of the General Population classification. 7 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 The MPE limits defined in 47 CFR § 1.1310 and utilized in this analysis are outlined in the table and diagram below: Limits for Occupational/Controlled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f2)* 6 30-300 61.4 0.163 1.0 6 300-1500 ‐‐ ‐‐ f/300 6 1500-100,000 ‐‐ ‐‐ 5 6 Limits for General Population/Uncontrolled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f2)* 30 30-300 27.5 0.073 0.2 30 300-1500 ‐‐ ‐‐ f/1500 30 1500-100,000 ‐‐ ‐‐ 1.0 30 f = frequency in MHz * = Plane‐waveequivalentpowerdensity 1 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 Verizon Wireless Site Compliance Report Site name - SARATOGA EXIT 14 ODAS NODE 2 - A Site Name: SARATOGA EXIT 14 ODAS NODE 2 - A Site Address: 258 Union Ave, Schenectady, NY, 12866 Structure Type: Utility Pole Report Information Report Date: Feb 23, 2026 Report Generated by: Mamta Verma Customer Contact: Rick Andras Compliance Statement Verizon Compliance Statement: Verizon Wireless is compliant with FCC rules and regulations in all publicly accessible areas. DavidC.Cotton,Jr. LicensedProfessionalEngineer StateofNewYork,086838 Date:2026-Feb-28 :ItisaviolationofNewYorkStateLaw,Article145,Section§7209foranyperson,unlessacting underthedirectionofalicensedprofessionalengineer,toalterthisdocumentinanyway. 2 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary ................................................................................................................................................. 3 2. Antenna Inventory ................................................................................................................................................... 4 3. Analysis ................................................................................................................................................................... 5 4. Appendix A: Reference Information ......................................................................................................................... 6 3 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary Verizon Wireless has contracted with Circet USA, an independent Radio Frequency consulting firm, to determine if the proposed telecommunications facility is in compliance with Federal Communications Commission (FCC) rules and regulations regarding RF exposure as defined in 47 CFR § 1.1307(b) and 1.1310. This document and the conclusions herein are based on the information provided by representatives of Verizon Wireless which is assumed to be true and correct. All information used in this report was analyzed to determine compliance in publicly accessible areas, in particular at ground level. The analysis evaluates the telecommunications facility with respect to the General Population/Uncontrolled Maximum Permissible Exposure (MPE) limits. Circet USA has taken into consideration the Verizon Wireless antenna system as well as any existing antenna systems at the subject location. Verizon Wireless final antenna count is (3) antenna. Based on the analysis, Circet USA has determined that: Verizon Wireless is compliant in all publicly accessible areas with the FCC rules and regulations governing human exposure to RF electromagnetic fields as described in 47 CFR § 1.1307(b) and 1.1310. With the proposed Verizon Wireless antenna configuration in service, the composite exposure from this facility in all areas at ground level will be less than 1% of the General Population MPE limit, or over 100 times less than the maximum allowed exposure in publicly accessible areas. 4 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 2. Antenna Inventory The table below contains data provided by Verizon Wireless representatives and/or gathered by Circet USA personnel. This data was used to perform the RF exposure analysis. Notes: Each row with the same number in the Antenna ID column references the same physical antenna. Power values provided by the client and used in the analysis may be greater than what is initially deployed. 80% TDD Duty Cycle and 100% FDD Duty Cycle are used. Jumper/connector/coax power losses between RRHs and antenna: AWS/PCS: 2 dB C-band: 2.5 dB Ant ID Owner Antenna manufacturer Antenna model Mech. Tilt (°) Azimuth (°)Height (ft)Frequency band Elec. Tilt (°)HBW (°) VBW (°) Total power (Watts) Gain (dBd) ERP (Watts) 1 Verizon JMA Wireless CX20OMI265-3Sxy 0 340 43.4 PCS1900 10 69.4 26 63.55 10.25 673.12 1 Verizon JMA Wireless CX20OMI265-3Sxy 0 340 43.4 LTE 2100 10 69.4 26 95.32 10.25 1009.67 1 Verizon JMA Wireless CX20OMI265-3Sxy 0 340 43.4 4GHz 0 53.6 20.6 142.9 11.65 2090.02 2 Verizon Samsung AT1K04 Envelope 0 150 40.6 28GHz 0 112 35 1.27 25.75 477.66 3 Verizon Samsung AT1K04 Envelope 0 270 40.6 28GHz 0 112 35 1.27 25.75 477.66 5 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 3. Analysis Circet USA has included the Verizon Wireless antenna system at the subject location in the analysis. All existing and proposed antennas are listed in the antenna table above. Engineering assumptions were used when specific antenna or operating parameter information was not available for the other existing collocated antennas (if applicable). Using this data, software modeling using IXUS software was performed for all transmitting antennas located at the site. Circet USA has assumed a 100% duty cycle and maximum radiated power. The site has been modeled with these assumptions to determine the maximum potential RF energy density at ground level. Circet USA believesthistobeaworst‐caseanalysisbased on the best available data. As stated previously, based on this analysis, the calculated ground level exposure from the Verizon Wireless antenna system alone is less than 1% of the General Population MPE limit. Keep in mind that the FCC did not arbitrarily establish their own standards but rather adopted the recommendations of national and international organizations such as the National Council on Radiation Protection and Measurements (NCRP), the American National Standards Institute (ANSI) and the Institute of Electrical and Electronics Engineers (IEEE). These recommendations were developed by expert scientists and engineers following extensive evaluation of the potential biological effects from RF exposure. The FCC MPE limits are based on thresholds for known adverse effects, and they were designed to provide a substantial margin of safety. There is a safety factor of 50 built into the General Public MPE limits, and the predicted Verizon Wireless exposure levels are over 100 times below these very conservative limits. In cases where such compliance exists, the subject of electromagnetic field safety is preempted by the Telecommunications Act of 1996, which states: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the (Federal Communication) Commission’s regulations concerning such emissions.” The graph below provides a visual depiction of the rather insignificant electromagnetic field exposure contribution from the Verizon Wireless antenna system out to a distance of 500’ from the base of the structure. This portrays how low the Verizon Wireless contribution is when compared to the General Population MPE limit. 6 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 4. Appendix A: Reference Information FCC Rules & Regulations All information used in this report was analyzed as a percentage of the MPE limits as detailed in 47 CFR § 1.1310. The calculated power density at each sample point divided by the limit at each calculated frequency provides a result in % MPE. Summing the calculated % MPE from all contributors provides accumulative % MPE at a particular sample point. Wireless carriers use different frequency bands with varying MPE limits; therefore, it is useful to report results in terms of % MPE as opposed to power density. All results were compared to the FCC radio frequency exposure rules as detailed in 47 CFR § 1.1307(b) to determine compliance with the MPE limits for General Population/Uncontrolled environments as defined below: Two Classifications for Exposure Limits Occupational – Applies to situations in which persons are “exposed as a consequence of their employment” and are “fully aware of the potential for exposure and can exercise control over their exposure”. General Population – Applies to situations in which persons are “exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure”. Generally speaking, those without significant and documented RF Safety & Awareness training would be in the General Population classification. Environment Classification Controlled – Applies to environments that are restricted or “controlled” in order to prevent access from members of the General Population classification. Uncontrolled – Applies to environments that are unrestricted or “uncontrolled” that allow access from members of the General Population classification. 7 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 The MPE limits defined in 47 CFR § 1.1310 and utilized in this analysis are outlined in the table and diagram below: Limits for Occupational/Controlled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f2)* 6 30-300 61.4 0.163 1.0 6 300-1500 ‐‐ ‐‐ f/300 6 1500-100,000 ‐‐ ‐‐ 5 6 Limits for General Population/Uncontrolled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f2)* 30 30-300 27.5 0.073 0.2 30 300-1500 ‐‐ ‐‐ f/1500 30 1500-100,000 ‐‐ ‐‐ 1.0 30 f = frequency in MHz * = Plane‐waveequivalentpowerdensity 1 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 Verizon Wireless Site Compliance Report Site name - Saratoga Exit 14 Node 3 Site Name: Saratoga Exit 14 Node 3 Site Address: 267 Union Ave, Saratoga Springs, NY, 12866 Structure Type: Utility Pole Report Information Report Date: Feb 23, 2026 Report Generated by: Mamta Verma Customer Contact: Rick Andras Compliance Statement Verizon Compliance Statement: Verizon Wireless is compliant with FCC rules and regulations in all publicly accessible areas. DavidC.Cotton,Jr. LicensedProfessionalEngineer StateofNewYork,086838 Date:2026-Feb-28 :ItisaviolationofNewYorkStateLaw,Article145,Section§7209foranyperson,unlessacting underthedirectionofalicensedprofessionalengineer,toalterthisdocumentinanyway. 2 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary ................................................................................................................................................. 3 2. Antenna Inventory ................................................................................................................................................... 4 3. Analysis ................................................................................................................................................................... 5 4. Appendix A: Reference Information ......................................................................................................................... 6 3 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary Verizon Wireless has contracted with Circet USA, an independent Radio Frequency consulting firm, to determine if the proposed telecommunications facility is in compliance with Federal Communications Commission (FCC) rules and regulations regarding RF exposure as defined in 47 CFR § 1.1307(b) and 1.1310. This document and the conclusions herein are based on the information provided by representatives of Verizon Wireless which is assumed to be true and correct. All information used in this report was analyzed to determine compliance in publicly accessible areas, in particular at ground level. The analysis evaluates the telecommunications facility with respect to the General Population/Uncontrolled Maximum Permissible Exposure (MPE) limits. Circet USA has taken into consideration the Verizon Wireless antenna system as well as any existing antenna systems at the subject location. Verizon Wireless final antenna count is (1) antenna. Based on the analysis, Circet USA has determined that: Verizon Wireless is compliant in all publicly accessible areas with the FCC rules and regulations governing human exposure to RF electromagnetic fields as described in 47 CFR § 1.1307(b) and 1.1310. With the proposed Verizon Wireless antenna configuration in service, the composite exposure from this facility in all areas at ground level will be less than 1% of the General Population MPE limit, or over 100 times less than the maximum allowed exposure in publicly accessible areas. 4 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 2. Antenna Inventory The table below contains data provided by Verizon Wireless representatives and/or gathered by Circet USA personnel. This data was used to perform the RF exposure analysis. Notes: Each row with the same number in the Antenna ID column references the same physical antenna. Power values provided by the client and used in the analysis may be greater than what is initially deployed. 80% TDD Duty Cycle and 100% FDD Duty Cycle are used. Jumper/connector/coax power losses between RRHs and antenna: AWS/PCS: 2 dB C-band: 2.5 dB Ant ID Owner Antenna manufacturer Antenna model Mech. Tilt (°) Azimuth (°)Height (ft)Frequency band Elec. Tilt (°)HBW (°) VBW (°) Total power (Watts) Gain (dBd) ERP (Watts) 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 70 34.5 PCS1900 6 240 25 63.55 7.35 345.22 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 70 34.5 WCDMA2100 6 240 25 190.6 7.35 1035.65 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 70 34.5 4GHz 0 240 19.2 142.9 7.65 832.05 5 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 3. Analysis Circet USA has included the Verizon Wireless antenna system at the subject location in the analysis. All existing and proposed antennas are listed in the antenna table above. Engineering assumptions were used when specific antenna or operating parameter information was not available for the other existing collocated antennas (if applicable). Using this data, software modeling using IXUS software was performed for all transmitting antennas located at the site. Circet USA has assumed a 100% duty cycle and maximum radiated power. The site has been modeled with these assumptions to determine the maximum potential RF energy density at ground level. Circet USA believesthistobeaworst‐caseanalysisbased on the best available data. As stated previously, based on this analysis, the calculated ground level exposure from the Verizon Wireless antenna system alone is less than 1% of the General Population MPE limit. Keep in mind that the FCC did not arbitrarily establish their own standards but rather adopted the recommendations of national and international organizations such as the National Council on Radiation Protection and Measurements (NCRP), the American National Standards Institute (ANSI) and the Institute of Electrical and Electronics Engineers (IEEE). These recommendations were developed by expert scientists and engineers following extensive evaluation of the potential biological effects from RF exposure. The FCC MPE limits are based on thresholds for known adverse effects, and they were designed to provide a substantial margin of safety. There is a safety factor of 50 built into the General Public MPE limits, and the predicted Verizon Wireless exposure levels are over 100 times below these very conservative limits. In cases where such compliance exists, the subject of electromagnetic field safety is preempted by the Telecommunications Act of 1996, which states: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the (Federal Communication) Commission’s regulations concerning such emissions.” The graph below provides a visual depiction of the rather insignificant electromagnetic field exposure contribution from the Verizon Wireless antenna system out to a distance of 500’ from the base of the structure. This portrays how low the Verizon Wireless contribution is when compared to the General Population MPE limit. 6 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 4. Appendix A: Reference Information FCC Rules & Regulations All information used in this report was analyzed as a percentage of the MPE limits as detailed in 47 CFR § 1.1310. The calculated power density at each sample point divided by the limit at each calculated frequency provides a result in % MPE. Summing the calculated % MPE from all contributors provides accumulative % MPE at a particular sample point. Wireless carriers use different frequency bands with varying MPE limits; therefore, it is useful to report results in terms of % MPE as opposed to power density. All results were compared to the FCC radio frequency exposure rules as detailed in 47 CFR § 1.1307(b) to determine compliance with the MPE limits for General Population/Uncontrolled environments as defined below: Two Classifications for Exposure Limits Occupational – Applies to situations in which persons are “exposed as a consequence of their employment” and are “fully aware of the potential for exposure and can exercise control over their exposure”. General Population – Applies to situations in which persons are “exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure”. Generally speaking, those without significant and documented RF Safety & Awareness training would be in the General Population classification. Environment Classification Controlled – Applies to environments that are restricted or “controlled” in order to prevent access from members of the General Population classification. Uncontrolled – Applies to environments that are unrestricted or “uncontrolled” that allow access from members of the General Population classification. 7 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 The MPE limits defined in 47 CFR § 1.1310 and utilized in this analysis are outlined in the table and diagram below: Limits for Occupational/Controlled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f2)* 6 30-300 61.4 0.163 1.0 6 300-1500 ‐‐ ‐‐ f/300 6 1500-100,000 ‐‐ ‐‐ 5 6 Limits for General Population/Uncontrolled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f2)* 30 30-300 27.5 0.073 0.2 30 300-1500 ‐‐ ‐‐ f/1500 30 1500-100,000 ‐‐ ‐‐ 1.0 30 f = frequency in MHz * = Plane‐waveequivalentpowerdensity 1 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 Verizon Wireless Site Compliance Report Site name - SARATOGA EXIT 14 ODAS NODE 4 - A Site Name: SARATOGA EXIT 14 ODAS NODE 4 - A Site Address: 312 Union Ave, Saratoga Springs, NY, 12866 Structure Type: Utility Pole Report Information Report Date: Feb 16, 2026 Report Generated by: Mamta Verma Customer Contact: Rick Andras Compliance Statement Verizon Compliance Statement: Verizon wireless is compliant with FCC rules and regulations in all publicly accessible areas. DavidC.Cotton,Jr. LicensedProfessionalEngineer StateofNewYork,086838 Date:2026-August-18 :ItisaviolationofNewYorkStateLaw,Article145,Section§7209foranyperson,unlessacting underthedirectionofalicensedprofessionalengineer,toalterthisdocumentinanyway. 2 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary ........................................................................................................................................................ 3 2. Antenna Inventory ......................................................................................................................................................... 4 3. Analysis ........................................................................................................................................................................... 5 4. Appendix A: Reference Information ............................................................................................................................... 6 3 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary Verizon Wireless has contracted with Circet USA, an independent Radio Frequency consulting firm, to determine if the proposed telecommunications facility is in compliance with Federal Communications Commission (FCC) rules and regulations regarding RF exposure as defined in 47 CFR § 1.1307(b) and 1.1310. This document and the conclusions herein are based on the information provided by representatives of Verizon Wireless which is assumed to be true and correct. All information used in this report was analyzed to determine compliance in publicly accessible areas, in particular at ground level. The analysis evaluates the telecommunications facility with respect to the General Population/Uncontrolled Maximum Permissible Exposure (MPE) limits. Circet USA has taken into consideration the Verizon Wireless antenna system as well as any existing antenna systems at the subject location. Verizon Wireless final antenna count is (1) antenna. Based on the analysis, Circet USA has determined that: Verizon Wireless is compliant in all publicly accessible areas with the FCC rules and regulations governing human exposure to RF electromagnetic fields as described in 47 CFR § 1.1307(b) and 1.1310. With the proposed Verizon Wireless antenna configuration in service, the composite exposure from this facility in all areas at ground level will be less than 1% of the General Population MPE limit, or over 100 times less than the maximum allowed exposure in publicly accessible areas. 4 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 2. Antenna Inventory The table below contains data provided by Verizon Wireless representatives and/or gathered by Circet USA personnel. This data was used to perform the RF exposure analysis. Notes: Each row with the same number in the Antenna ID column references the same physical antenna. Power values provided by the client and used in the analysis may be greater than what is initially deployed. 80% TDD Duty Cycle and 100% FDD Duty Cycle are used. Jumper/connector/coax power losses between RRHs and antenna: AWS/PCS: 2 dB C-band: 2.5 dB Ant ID Owner Antenna manufacturer Antenna model Mech. Tilt (°) Azimuth (°)Height (ft)Frequency band Elec. Tilt (°)HBW (°) VBW (°) Total power (Watts) Gain (dBd) ERP (Watts) 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 120 41.3 PCS1900 2 240 25 63.55 7.35 345.22 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 120 41.3 LTE 2100 2 240 25 190.6 7.35 1035.65 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 120 41.3 4GHz 0 240 19.2 142.9 7.65 832.05 5 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 3. Analysis Circet USA has included the Verizon Wireless antenna system at the subject location in the analysis. All existing and proposed antennas are listed in the antenna table above. Engineering assumptions were used when specific antenna or operating parameter information was not available for the other existing collocated antennas (if applicable). Using this data, software modeling using IXUS software was performed for all transmitting antennas located at the site. Circet USA has assumed a 100% duty cycle and maximum radiated power. The site has been modeled with these assumptions to determine the maximum potential RF energy density at ground level. Circet USA believesthistobeaworst‐caseanalysisbased on the best available data. As stated previously, based on this analysis, the calculated ground level exposure from the Verizon Wireless antenna system alone is less than 1% of the General Population MPE limit. Keep in mind that the FCC did not arbitrarily establish their own standards but rather adopted the recommendations of national and international organizations such as the National Council on Radiation Protection and Measurements (NCRP), the American National Standards Institute (ANSI) and the Institute of Electrical and Electronics Engineers (IEEE). These recommendations were developed by expert scientists and engineers following extensive evaluation of the potential biological effects from RF exposure. The FCC MPE limits are based on thresholds for known adverse effects, and they were designed to provide a substantial margin of safety. There is a safety factor of 50 built into the General Public MPE limits, and the predicted Verizon Wireless exposure levels are over 100 times below these very conservative limits. In cases where such compliance exists, the subject of electromagnetic field safety is preempted by the Telecommunications Act of 1996, which states: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the (Federal Communication) Commission’s regulations concerning such emissions.” The graph below provides a visual depiction of the rather insignificant electromagnetic field exposure contribution from the Verizon Wireless antenna system out to a distance of 500’ from the base of the structure. This portrays how low the Verizon Wireless contribution is when compared to the General Population MPE limit. 6 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 4. Appendix A: Reference Information FCC Rules & Regulations All information used in this report was analyzed as a percentage of the MPE limits as detailed in 47 CFR § 1.1310. The calculated power density at each sample point divided by the limit at each calculated frequency provides a result in % MPE. Summing the calculated % MPE from all contributors provides accumulative % MPE at a particular sample point. Wireless carriers use different frequency bands with varying MPE limits; therefore, it is useful to report results in terms of % MPE as opposed to power density. All results were compared to the FCC radio frequency exposure rules as detailed in 47 CFR § 1.1307(b) to determine compliance with the MPE limits for General Population/Uncontrolled environments as defined below: Two Classifications for Exposure Limits Occupational – Applies to situations in which persons are “exposed as a consequence of their employment” and are “fully aware of the potential for exposure and can exercise control over their exposure”. General Population – Applies to situations in which persons are “exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure”. Generally speaking, those without significant and documented RF Safety & Awareness training would be in the General Population classification. Environment Classification Controlled – Applies to environments that are restricted or “controlled” in order to prevent access from members of the General Population classification. Uncontrolled – Applies to environments that are unrestricted or “uncontrolled” that allow access from members of the General Population classification. 7 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 The MPE limits defined in 47 CFR § 1.1310 and utilized in this analysis are outlined in the table and diagram below: Limits for Occupational/Controlled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f2)* 6 30-300 61.4 0.163 1.0 6 300-1500 ‐‐ ‐‐ f/300 6 1500-100,000 ‐‐ ‐‐ 5 6 Limits for General Population/Uncontrolled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f2)* 30 30-300 27.5 0.073 0.2 30 300-1500 ‐‐ ‐‐ f/1500 30 1500-100,000 ‐‐ ‐‐ 1.0 30 f = frequency in MHz * = Plane‐waveequivalentpowerdensity 1 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 Verizon Wireless Site Compliance Report Site name - SARATOGA EXIT 14 ODAS NODE 5 - A Site Name: SARATOGA EXIT 14 ODAS NODE 5 - A Site Address: 380 Union Ave, Saratoga Springs, NY, 12866 Structure Type: Utility Pole Report Information Report Date: Feb 23, 2026 Report Generated by: Mamta Verma Customer Contact: Rick Andras Compliance Statement Verizon Compliance Statement: Verizon Wireless is compliant with FCC rules and regulations in all publicly accessible areas. DavidC.Cotton,Jr. LicensedProfessionalEngineer StateofNewYork,086838 Date:2026-Feb-28 :ItisaviolationofNewYorkStateLaw,Article145,Section§7209foranyperson,unlessacting underthedirectionofalicensedprofessionalengineer,toalterthisdocumentinanyway. 2 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary ................................................................................................................................................. 3 2. Antenna Inventory ................................................................................................................................................... 4 3. Analysis ................................................................................................................................................................... 5 4. Appendix A: Reference Information ......................................................................................................................... 6 3 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary Verizon Wireless has contracted with Circet USA, an independent Radio Frequency consulting firm, to determine if the proposed telecommunications facility is in compliance with Federal Communications Commission (FCC) rules and regulations regarding RF exposure as defined in 47 CFR § 1.1307(b) and 1.1310. This document and the conclusions herein are based on the information provided by representatives of Verizon Wireless which is assumed to be true and correct. All information used in this report was analyzed to determine compliance in publicly accessible areas, in particular at ground level. The analysis evaluates the telecommunications facility with respect to the General Population/Uncontrolled Maximum Permissible Exposure (MPE) limits. Circet USA has taken into consideration the Verizon Wireless antenna system as well as any existing antenna systems at the subject location. Verizon Wireless final antenna count is (1) antenna. Based on the analysis, Circet USA has determined that: Verizon Wireless is compliant in all publicly accessible areas with the FCC rules and regulations governing human exposure to RF electromagnetic fields as described in 47 CFR § 1.1307(b) and 1.1310. With the proposed Verizon Wireless antenna configuration in service, the composite exposure from this facility in all areas at ground level will be less than 1% of the General Population MPE limit, or over 100 times less than the maximum allowed exposure in publicly accessible areas. 4 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 2. Antenna Inventory The table below contains data provided by Verizon Wireless representatives and/or gathered by Circet USA personnel. This data was used to perform the RF exposure analysis. Notes: Each row with the same number in the Antenna ID column references the same physical antenna. Power values provided by the client and used in the analysis may be greater than what is initially deployed. 80% TDD Duty Cycle and 100% FDD Duty Cycle are used. Jumper/connector/coax power losses between RRHs and antenna: 700/850: 1.5 dB AWS/PCS: 2 dB C-band: 2.5 dB Ant ID Owner Antenna manufacturer Antenna model Mech. Tilt (°) Azimuth (°)Height (ft)Frequency band Elec. Tilt (°)HBW (°) VBW (°) Total power (Watts) Gain (dBd) ERP (Watts) 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 280 49.2 LTE 700 0 240 66 113.3 2.85 218.33 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 280 49.2 PCS1900 2 240 25 63.55 7.35 345.22 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 280 49.2 LTE 2100 2 240 25 190.6 7.35 1035.65 1 Verizon JMA Wireless CX20OMI224-3Hxy 0 280 49.2 4GHz 0 240 19.2 142.9 7.65 832.05 5 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 3. Analysis Circet USA has included the Verizon Wireless antenna system at the subject location in the analysis. All existing and proposed antennas are listed in the antenna table above. Engineering assumptions were used when specific antenna or operating parameter information was not available for the other existing collocated antennas (if applicable). Using this data, software modeling using IXUS software was performed for all transmitting antennas located at the site. Circet USA has assumed a 100% duty cycle and maximum radiated power. The site has been modeled with these assumptions to determine the maximum potential RF energy density at ground level. Circet USA believesthistobeaworst‐caseanalysisbased on the best available data. As stated previously, based on this analysis, the calculated ground level exposure from the Verizon Wireless antenna system alone is less than 1% of the General Population MPE limit. Keep in mind that the FCC did not arbitrarily establish their own standards but rather adopted the recommendations of national and international organizations such as the National Council on Radiation Protection and Measurements (NCRP), the American National Standards Institute (ANSI) and the Institute of Electrical and Electronics Engineers (IEEE). These recommendations were developed by expert scientists and engineers following extensive evaluation of the potential biological effects from RF exposure. The FCC MPE limits are based on thresholds for known adverse effects, and they were designed to provide a substantial margin of safety. There is a safety factor of 50 built into the General Public MPE limits, and the predicted Verizon Wireless exposure levels are over 100 times below these very conservative limits. In cases where such compliance exists, the subject of electromagnetic field safety is preempted by the Telecommunications Act of 1996, which states: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the (Federal Communication) Commission’s regulations concerning such emissions.” The graph below provides a visual depiction of the rather insignificant electromagnetic field exposure contribution from the Verizon Wireless antenna system out to a distance of 500’ from the base of the structure. This portrays how low the Verizon Wireless contribution is when compared to the General Population MPE limit. 6 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 4. Appendix A: Reference Information FCC Rules & Regulations All information used in this report was analyzed as a percentage of the MPE limits as detailed in 47 CFR § 1.1310. The calculated power density at each sample point divided by the limit at each calculated frequency provides a result in % MPE. Summing the calculated % MPE from all contributors provides accumulative % MPE at a particular sample point. Wireless carriers use different frequency bands with varying MPE limits; therefore, it is useful to report results in terms of % MPE as opposed to power density. All results were compared to the FCC radio frequency exposure rules as detailed in 47 CFR § 1.1307(b) to determine compliance with the MPE limits for General Population/Uncontrolled environments as defined below: Two Classifications for Exposure Limits Occupational – Applies to situations in which persons are “exposed as a consequence of their employment” and are “fully aware of the potential for exposure and can exercise control over their exposure”. General Population – Applies to situations in which persons are “exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure”. Generally speaking, those without significant and documented RF Safety & Awareness training would be in the General Population classification. Environment Classification Controlled – Applies to environments that are restricted or “controlled” in order to prevent access from members of the General Population classification. Uncontrolled – Applies to environments that are unrestricted or “uncontrolled” that allow access from members of the General Population classification. 7 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 The MPE limits defined in 47 CFR § 1.1310 and utilized in this analysis are outlined in the table and diagram below: Limits for Occupational/Controlled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f2)* 6 30-300 61.4 0.163 1.0 6 300-1500 ‐‐ ‐‐ f/300 6 1500-100,000 ‐‐ ‐‐ 5 6 Limits for General Population/Uncontrolled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f2)* 30 30-300 27.5 0.073 0.2 30 300-1500 ‐‐ ‐‐ f/1500 30 1500-100,000 ‐‐ ‐‐ 1.0 30 f = frequency in MHz * = Plane‐waveequivalentpowerdensity 1 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 Verizon Wireless Site Compliance Report Site name - SARATOGA EXIT 14 ODAS NODE 6 - A Site Name: SARATOGA EXIT 14 ODAS NODE 6 - A Site Address: 416 Union Ave, Saratoga Springs, NY, 12866 Structure Type: Utility Pole Report Information Report Date: Feb 18, 2026 Report Generated by: Mamta Verma Customer Contact: Rick Andras Compliance Statement Verizon Compliance Statement: Verizon Wireless is compliant with FCC rules and regulations in all publicly accessible areas. DavidC.Cotton,Jr. LicensedProfessionalEngineer StateofNewYork,086838 Date:2026-Feb-28 :ItisaviolationofNewYorkStateLaw,Article145,Section§7209foranyperson,unlessacting underthedirectionofalicensedprofessionalengineer,toalterthisdocumentinanyway. 2 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary ................................................................................................................................................. 3 2. Antenna Inventory ................................................................................................................................................... 4 3. Analysis ................................................................................................................................................................... 5 4. Appendix A: Reference Information ......................................................................................................................... 6 3 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary Verizon Wireless has contracted with Circet USA, an independent Radio Frequency consulting firm, to determine if the proposed telecommunications facility is in compliance with Federal Communications Commission (FCC) rules and regulations regarding RF exposure as defined in 47 CFR § 1.1307(b) and 1.1310. This document and the conclusions herein are based on the information provided by representatives of Verizon Wireless which is assumed to be true and correct. All information used in this report was analyzed to determine compliance in publicly accessible areas, in particular at ground level. The analysis evaluates the telecommunications facility with respect to the General Population/Uncontrolled Maximum Permissible Exposure (MPE) limits. Circet USA has taken into consideration the Verizon Wireless antenna system as well as any existing antenna systems at the subject location. Verizon Wireless final antenna count is (1) antenna. Based on the analysis, Circet USA has determined that: Verizon Wireless is compliant in all publicly accessible areas with the FCC rules and regulations governing human exposure to RF electromagnetic fields as described in 47 CFR § 1.1307(b) and 1.1310. With the proposed Verizon Wireless antenna configuration in service, the composite exposure from this facility in all areas at ground level will be less than 1% of the General Population MPE limit, or over 100 times less than the maximum allowed exposure in publicly accessible areas. 4 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 2. Antenna Inventory The table below contains data provided by Verizon Wireless representatives and/or gathered by Circet USA personnel. This data was used to perform the RF exposure analysis. Notes: Each row with the same number in the Antenna ID column references the same physical antenna. Power values provided by the client and used in the analysis may be greater than what is initially deployed. 80% TDD Duty Cycle and 100% FDD Duty Cycle are used. Jumper/connector/coax power losses between RRHs and antenna: AWS/PCS: 2 dB C-band: 2.5 dB Ant ID Owner Antenna manufacturer Antenna model Mech. Tilt (°) Azimuth (°)Height (ft)Frequency band Elec. Tilt (°)HBW (°) VBW (°) Total power (Watts) Gain (dBd) ERP (Watts) 1 Verizon JMA Wireless CX20OMI218-3Pxy 0 0 39.9 PCS1900 2 180 24.8 63.55 6.85 307.67 1 Verizon JMA Wireless CX20OMI218-3Pxy 0 0 39.9 WCDMA2100 2 180 24.8 190.6 6.85 923.02 1 Verizon JMA Wireless CX20OMI218-3Pxy 0 0 39.9 4GHz 0 180 19.1 142.9 7.45 794.6 5 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 3. Analysis Circet USA has included the Verizon Wireless antenna system at the subject location in the analysis. All existing and proposed antennas are listed in the antenna table above. Engineering assumptions were used when specific antenna or operating parameter information was not available for the other existing collocated antennas (if applicable). Using this data, software modeling using IXUS software was performed for all transmitting antennas located at the site. Circet USA has assumed a 100% duty cycle and maximum radiated power. The site has been modeled with these assumptions to determine the maximum potential RF energy density at ground level. Circet USA believesthistobeaworst‐caseanalysisbased on the best available data. As stated previously, based on this analysis, the calculated ground level exposure from the Verizon Wireless antenna system alone is less than 1% of the General Population MPE limit. Keep in mind that the FCC did not arbitrarily establish their own standards but rather adopted the recommendations of national and international organizations such as the National Council on Radiation Protection and Measurements (NCRP), the American National Standards Institute (ANSI) and the Institute of Electrical and Electronics Engineers (IEEE). These recommendations were developed by expert scientists and engineers following extensive evaluation of the potential biological effects from RF exposure. The FCC MPE limits are based on thresholds for known adverse effects, and they were designed to provide a substantial margin of safety. There is a safety factor of 50 built into the General Public MPE limits, and the predicted Verizon Wireless exposure levels are over 100 times below these very conservative limits. In cases where such compliance exists, the subject of electromagnetic field safety is preempted by the Telecommunications Act of 1996, which states: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the (Federal Communication) Commission’s regulations concerning such emissions.” The graph below provides a visual depiction of the rather insignificant electromagnetic field exposure contribution from the Verizon Wireless antenna system out to a distance of 500’ from the base of the structure. This portrays how low the Verizon Wireless contribution is when compared to the General Population MPE limit. 6 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 4. Appendix A: Reference Information FCC Rules & Regulations All information used in this report was analyzed as a percentage of the MPE limits as detailed in 47 CFR § 1.1310. The calculated power density at each sample point divided by the limit at each calculated frequency provides a result in % MPE. Summing the calculated % MPE from all contributors provides accumulative % MPE at a particular sample point. Wireless carriers use different frequency bands with varying MPE limits; therefore, it is useful to report results in terms of % MPE as opposed to power density. All results were compared to the FCC radio frequency exposure rules as detailed in 47 CFR § 1.1307(b) to determine compliance with the MPE limits for General Population/Uncontrolled environments as defined below: Two Classifications for Exposure Limits Occupational – Applies to situations in which persons are “exposed as a consequence of their employment” and are “fully aware of the potential for exposure and can exercise control over their exposure”. General Population – Applies to situations in which persons are “exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure”. Generally speaking, those without significant and documented RF Safety & Awareness training would be in the General Population classification. Environment Classification Controlled – Applies to environments that are restricted or “controlled” in order to prevent access from members of the General Population classification. Uncontrolled – Applies to environments that are unrestricted or “uncontrolled” that allow access from members of the General Population classification. 7 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 The MPE limits defined in 47 CFR § 1.1310 and utilized in this analysis are outlined in the table and diagram below: Limits for Occupational/Controlled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f2)* 6 30-300 61.4 0.163 1.0 6 300-1500 ‐‐ ‐‐ f/300 6 1500-100,000 ‐‐ ‐‐ 5 6 Limits for General Population/Uncontrolled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f2)* 30 30-300 27.5 0.073 0.2 30 300-1500 ‐‐ ‐‐ f/1500 30 1500-100,000 ‐‐ ‐‐ 1.0 30 f = frequency in MHz * = Plane‐waveequivalentpowerdensity 1 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 Verizon Wireless Site Compliance Report Site name - SARATOGA EXIT 14 ODAS NODE 7 - A Site Name: SARATOGA EXIT 14 ODAS NODE 7 - A Site Address: 96 Gilbert Road, Saratoga Springs, NY, 12866 Structure Type: Utility Pole Report Information Report Date: Feb 18, 2026 Report Generated by: Mamta Verma Customer Contact: Rick Andras Compliance Statement Verizon Compliance Statement: Verizon Wireless is compliant with FCC rules and regulations in all publicly accessible areas. DavidC.Cotton,Jr. LicensedProfessionalEngineer StateofNewYork,086838 Date:2026-Feb-28 :ItisaviolationofNewYorkStateLaw,Article145,Section§7209foranyperson,unlessacting underthedirectionofalicensedprofessionalengineer,toalterthisdocumentinanyway. 2 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary ................................................................................................................................................. 3 2. Antenna Inventory ................................................................................................................................................... 4 3. Analysis ................................................................................................................................................................... 5 4. Appendix A: Reference Information ......................................................................................................................... 6 3 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 1. Executive Summary Verizon Wireless has contracted with Circet USA, an independent Radio Frequency consulting firm, to determine if the proposed telecommunications facility is in compliance with Federal Communications Commission (FCC) rules and regulations regarding RF exposure as defined in 47 CFR § 1.1307(b) and 1.1310. This document and the conclusions herein are based on the information provided by representatives of Verizon Wireless which is assumed to be true and correct. All information used in this report was analyzed to determine compliance in publicly accessible areas, in particular at ground level. The analysis evaluates the telecommunications facility with respect to the General Population/Uncontrolled Maximum Permissible Exposure (MPE) limits. Circet USA has taken into consideration the Verizon Wireless antenna system as well as any existing antenna systems at the subject location. Verizon Wireless final antenna count is (1) antenna. Based on the analysis, Circet USA has determined that: Verizon Wireless is compliant in all publicly accessible areas with the FCC rules and regulations governing human exposure to RF electromagnetic fields as described in 47 CFR § 1.1307(b) and 1.1310. With the proposed Verizon Wireless antenna configuration in service, the composite exposure from this facility in all areas at ground level will be less than 1% of the General Population MPE limit, or over 100 times less than the maximum allowed exposure in publicly accessible areas. 4 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 2. Antenna Inventory The table below contains data provided by Verizon Wireless representatives and/or gathered by Circet USA personnel. This data was used to perform the RF exposure analysis. Notes: Each row with the same number in the Antenna ID column references the same physical antenna. Power values provided by the client and used in the analysis may be greater than what is initially deployed. 80% TDD Duty Cycle and 100% FDD Duty Cycle are used. Jumper/connector/coax power losses between RRHs and antenna: AWS/PCS: 2 dB C-band: 2.5 dB Ant ID Owner Antenna manufacturer Antenna model Mech. Tilt (°)Azimuth (°) Height (ft) Frequency band Elec. Tilt (°)HBW (°) VBW (°) Total power (Watts)Gain (dBd) ERP (Watts) 1 Verizon JMA Wireless CX16OMI236-BFxy 0 0 35.9 PCS1900 2 360 27.1 63.55 5.25 212.86 1 Verizon JMA Wireless CX16OMI236-BFxy 0 0 35.9 WCDMA2100 2 360 27.1 190.6 5.25 638.57 1 Verizon JMA Wireless CX16OMI236-BFxy 0 0 35.9 4GHz 2 360 9.4 142.9 7.65 832.05 5 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 3. Analysis Circet USA has included the Verizon Wireless antenna system at the subject location in the analysis. All existing and proposed antennas are listed in the antenna table above. Engineering assumptions were used when specific antenna or operating parameter information was not available for the other existing collocated antennas (if applicable). Using this data, software modeling using IXUS software was performed for all transmitting antennas located at the site. Circet USA has assumed a 100% duty cycle and maximum radiated power. The site has been modeled with these assumptions to determine the maximum potential RF energy density at ground level. Circet USA believesthistobeaworst‐caseanalysisbased on the best available data. As stated previously, based on this analysis, the calculated ground level exposure from the Verizon Wireless antenna system alone is less than 1% of the General Population MPE limit. Keep in mind that the FCC did not arbitrarily establish their own standards but rather adopted the recommendations of national and international organizations such as the National Council on Radiation Protection and Measurements (NCRP), the American National Standards Institute (ANSI) and the Institute of Electrical and Electronics Engineers (IEEE). These recommendations were developed by expert scientists and engineers following extensive evaluation of the potential biological effects from RF exposure. The FCC MPE limits are based on thresholds for known adverse effects, and they were designed to provide a substantial margin of safety. There is a safety factor of 50 built into the General Public MPE limits, and the predicted Verizon Wireless exposure levels are over 100 times below these very conservative limits. In cases where such compliance exists, the subject of electromagnetic field safety is preempted by the Telecommunications Act of 1996, which states: “No state or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the (Federal Communication) Commission’s regulations concerning such emissions.” The graph below provides a visual depiction of the rather insignificant electromagnetic field exposure contribution from the Verizon Wireless antenna system out to a distance of 500’ from the base of the structure. This portrays how low the Verizon Wireless contribution is when compared to the General Population MPE limit. 6 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 4. Appendix A: Reference Information FCC Rules & Regulations All information used in this report was analyzed as a percentage of the MPE limits as detailed in 47 CFR § 1.1310. The calculated power density at each sample point divided by the limit at each calculated frequency provides a result in % MPE. Summing the calculated % MPE from all contributors provides accumulative % MPE at a particular sample point. Wireless carriers use different frequency bands with varying MPE limits; therefore, it is useful to report results in terms of % MPE as opposed to power density. All results were compared to the FCC radio frequency exposure rules as detailed in 47 CFR § 1.1307(b) to determine compliance with the MPE limits for General Population/Uncontrolled environments as defined below: Two Classifications for Exposure Limits Occupational – Applies to situations in which persons are “exposed as a consequence of their employment” and are “fully aware of the potential for exposure and can exercise control over their exposure”. General Population – Applies to situations in which persons are “exposed as a consequence of their employment may not be made fully aware of the potential for exposure or cannot exercise control over their exposure”. Generally speaking, those without significant and documented RF Safety & Awareness training would be in the General Population classification. Environment Classification Controlled – Applies to environments that are restricted or “controlled” in order to prevent access from members of the General Population classification. Uncontrolled – Applies to environments that are unrestricted or “uncontrolled” that allow access from members of the General Population classification. 7 1777 Sentry Parkway W. Building 11 • Suite 201 Blue Bell • PA • 19422 The MPE limits defined in 47 CFR § 1.1310 and utilized in this analysis are outlined in the table and diagram below: Limits for Occupational/Controlled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f2)* 6 30-300 61.4 0.163 1.0 6 300-1500 ‐‐ ‐‐ f/300 6 1500-100,000 ‐‐ ‐‐ 5 6 Limits for General Population/Uncontrolled Exposure Frequency Electric Field Magnetic Field Power Density Averaging Time Range Strength Strength (S) |E|2, |H|2, or S (MHz) (E) (V/m) (H) (A/m) (mW/cm2) (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f2)* 30 30-300 27.5 0.073 0.2 30 300-1500 ‐‐ ‐‐ f/1500 30 1500-100,000 ‐‐ ‐‐ 1.0 30 f = frequency in MHz * = Plane‐waveequivalentpowerdensity · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · · ·