Loading...
HomeMy WebLinkAbout20260808 167 Lake Ave Exterior Modification - Rooftop Solar ApplicationRevised 12/2025 APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT Name Address Phone / / / Email Identify primary contact person:  Applicant Owner Attorney/Agent * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Applicant’s interest in premises: Owner Lessee Under option to lease or purchase PROPERTY INFORMATION Property Address/Location: Tax Parcel #: . - - (for example: 165.52 – 4 – 37 ) Current Zoning District: Property use:  Residential Non-residential/mixed-use Type of Review: Architectural Historic Extension/modification (of current approval) Summary description of proposed action: Has a previous application been filed with the DRB for this property? No  Yes – date(s)? _____________________ -App. No.(s)? _________________ Date Acquired by Owner: _________________ **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** CITY OF SARATOGA SPRINGS DESIGN REVIEW %O$RD CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 www.saratoga-springs.org APPLICATION FOR: ARCHITECTURAL / HISTORIC REVIEW [FOR OFFICE USE] _______________ ASSOicatiRn  ____________ Date receiYed @@@@@@@@@@@@@@@@@@@@@@@@@@ 3rRMect Title Staff Review _______________ **A “complete” application consists of 1 hard copy (original) , and 1 electronic copy of application & ALL other materials as required below: New Construction / Additions Color photographs showing site/exterior details of existing structures and adjacent properties A detailed scaled site plan is essential for achieving minimal zoning compliance, depicting both current and planned structures along with all building projections such as decks, porches, steps, roof overhangs, and chimneys. This site plan must show all setbacks from property boundaries and any easements, in addition to the dimensional and bulk standards relevant to the zoning district on 17"x11" sheet. Elevation drawings showing design of all sides of existing & proposed construction – label dimensions, colors, materials, lighting (fixture & lamp type, wattage), etc. - include compass bearing & scale; no larger than 2’x3’ sheet – smaller permitted if legible Floor plans for proposed structure; on sheet no larger than 2’x3’ – smaller permitted if legible Product literature, specifications and samples of proposed materials and colors Change in exterior building materials (windows, doors, roof, siding, etc.), or color (in non-residential districts only) Color photographs showing site/exterior details of existing structures and that illustrate affected features Elevation drawings showing all sides of existing & proposed construction – label dimensions, colors, materials, lighting (fixture & lamp type, wattage), etc. - include compass bearing & scale; no larger than 2’x3’ sheet – smaller permitted if legible Product literature, specifications and samples of proposed materials and colors Within front yard setbacks in Historic Districts only (Front setbacks: UR-1 & INST-HTR=30’; UR-4=25’; UR-2, UR-3 & NCUD-1=10’) -Installation, removal or change in material of drive- and walkways -Installation or removal of architectural, sculptural or vegetative screening over 3’ in height -Installation of accessory utility structures or radio/satellite transmission/reception devices (more than 2’ diameter) For any of above: Color photographs showing site/exterior details of existing structures, and of adjacent properties Site plan showing existing & proposed construction: include property lines & dimensions, required & proposed setbacks & lot coverage, site features (fences, walks, trees, etc.) street names, compass bearing & scale; no larger than 2’x3’ sheet – smaller preferred if legible Product literature, specifications and samples of proposed materials and colors Signage / Awnings Color photographs showing site/exterior details of existing structures, and adjacent properties Plan showing location of proposed sign/awning structure on building/premises: no larger than 11”x17” Scaled illustration of proposed sign/awning structure and lettering (front view & profile): include all dimensions of structure; type, dimensions and style of lettering or logo; description of colors, materials, mounting method and hardware Descriptions, specifications of proposed lighting including fixture & lamp type, wattage, mounting method, and location Product literature, specifications and samples of proposed materials and colors Demolition Color photographs showing site/exterior details of existing structures, and of adjacent properties Site plan showing existing and any proposed structures - include dimensions, setbacks, street names, compass bearing, and scale Written description of reasons for demolition and, in addition: For structures of “architectural/historical significance”, demonstrate “good cause” why structure cannot be preserved For structures in an architectural district that might be eligible for listing on National Register of Historic Places, or for a “contributing” structure in a National Register district (contact City staff), provide plans for site development following demolition - include a timetable and letter of credit for project completion Telecommunication facilities Color photographs showing site/existing structures, and of adjacent properties Site plan showing existing and proposed structures: include dimensions, setbacks, street names, compass bearing, and scale Scaled illustration of proposed structures: include all dimensions; colors, materials, lighting, mounting details Consult Article 240-12.22 of the City’s Zoning Ordinance and City staff to ensure compliance with requirements for visual impact assessment and existing and proposed vegetative screening Revised 12/2025 3eWised 12/2025 Request for extension of current approval Identify date of original DRB approval: ______________Current expiration date: ________________ Org. App. No. ____________ Describe why this extension is necessary and whether any significant changes have occurred either on the site or in the neighborhood. SEQR Environmental Assessment Form Applicants proposing the following must complete “Part I” of the SEQR Short Environmental Assessment Form (available here: http://www.dec.ny.gov/docs/permits_ej_operations_pdf/seafpartone.pdf): -Construction or expansion of a multi-family residential structure (4 units +) -Construction or expansion (exceeding 4,000 sq. ft. gross floor area) of a principal or accessory non-residential structure -Telecommunications facility, radio antennae, satellite dishes -Demolition Disclosure Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? No  Yes - If yes, a statement disclosing the name, residence, nature, and extent of this interest must be filed with this application. Certification I/we, the property owner(s), or purchaser(s)/lessee(s) under contract, of the land in question, hereby request an appearance before the Design Review BϕχϘϊ. By the signature(s) attached hereto, I/we certify that the information provided within this application and accompanying documentation is, to the best of my/our knowledge, true and accurate. I/we further understand that intentionally providing false or misleading information is grounds for immediate denial of this application. I/we hereby authorize the members of the Design Review BϕχϘϊ and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. Furthermore, I/we agree to meet all requirements under Article VII for Historic Review or Article VIII for Architectural Review of the Zoning Code of the City of Saratoga Springs. Date: (applicant signature) Date: (applicant signature) If applicant is not the currently the owner of the property, the current owner must also sign. Owner Signature: Date: Owner Signature: Date: 3eWised 12/2025 INSTRUCTIONS ARCHITECTURAL / HISTORIC REVIEW APPLICATION кͨELIGIBILITY: An applicant to the Design Review BϕχϘϊ for Architectural Review or Historic Review must be the property owner(s) or lessee, or have an option to lease or purchase the property in question. лͨCOMPLETE SUBMISSIONS: Applicants are encouraged to work with City staff to ensure that an application is complete. The DRBwill only consider properly completed applications that contain 1 original and 1 digital version of the application and ALL other required materials as indicated on the application. HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED!! мͨACTIONS REQUIRING REVIEW: Architectural Review District Historic Review District •any exterior changes that require a building permit •any change in exterior building materials •a new, or change to an existing, sign or sign structure •demolition of a structure Within a non-residential zoning district: •a change in exterior building color •installation of an awning •Installation or exterior change to a structure requiring a building or demolition permit •any material change to exterior of a structure including: -addition or removal of exterior architectural features -installation, removal or material changes to exterior building elements such as roof, siding, windows, doors, porches, etc. -enclosure or screening or buildings openings such as windows, doors, porches, etc. -installation of utility, mechanical or misc. accessory structures to the exterior of a building such as HVAC equipment, solar panels, wind turbines, radio/satellite transmission/reception devices, etc. Within a front yard setback: -installation, removal or material changes to drive- or walkways -installation or removal of architectural, sculptural or vegetative screening that exceeds 3’ in height -installation of accessory utility structures or radio/satellite transmission/reception devices over 2’ in diameter •a change in exterior building color within a non- residential zoning district •a new, or change to an existing, sign or awning •installation of telecommunications facilities Note – Ordinary maintenance or repair that does not involve a change in material, design or outer appearance is exempt from Historic or Architectural Review. CITY O F SARATOGA SPRINGS DESIGN REVIEW BOARD City Hall - 474 Broadway Saratoga Springs, New York 12866 Tel: 518-587-3550 x2533 www.saratoga-springs.org нͨDESIGN GUIDELINES: The Design Review BϕχϘϊ will evaluate whether the proposed action (construction, alteration or demolition) is compatible with existing structures and surrounding properties using the following criteria: •Height – consistent with historic form and context of site and surrounding properties •Scale – relationship of structure and its architectural elements to human size, form, perception •Proportion – relationship among building elements including front façade, windows, and doors •Rhythm – pattern resulting from repeating building elements such as door/window openings, columns, arches, and other façade elements •Directional Expression – compatibility with horizontal & vertical expression of surrounding structures •Massing & Open Space – relationship of structure to open space between it and adjoining buildings •Setback – compatibility with surrounding structures •Compatibility of the following with surrounding structures/properties: -Major building elements (storefronts, doors, windows, roof) -Building materials -Color – (in non-residential zoning districts only) оͨDECISIONS: The Design Review BϕχϘϊ may approve, approve with conditions, or disapprove an application. The DRC may impose appropriate conditions and safeguards in connection with its approval including nature/ quality of materials, manner of construction, and design. An applicant may appeal a denied DRC application on the grounds of hardship. Application approvals shall expire within 18 months of tIe filinH date unless the project has sufficiently commenced (i.e. building/demolition permits obtained and construction/alteration begun). Applicants may request up to 2 extensions if requested before expiration date of prior approval. 6.$GEND$ D$7E: Check City’s website (www.saratoga-springs.org) for meetinH dates "pplications are placed on an aHenda on first-come, first-serWed Casis as determined CZ tIe completeness of tIe application 7.APPLICATION FEE N0N-3&'6N%"#-&  Make checks payable to the "Commissioner of Finance” 3&'&3 50 5)& $633&N5 '&& 803,4)&&5 *N$-6%&% *N 5)*4 %0$6.&N5 ADDITIONAL INFORMATION: ΖϕϘϋϊϋϚχϏϒϋϊϏϔόϕϘϓχϚϏϕϔϕϔΊϘωώϏϚϋωϚϛϘχϒΛϋϜϏϋϝͥΑϏϙϚϕϘϏωΛϋϜϏϋϝχϔϊϚώϋ΍ϋϙϏύϔΛϋϜϏϋϝBϕχϘϊϘϋϙϖϕϔϙϏψϏϒϏϚϏϋϙϓχϟψϋόϕϛϔϊϏϔϚώϋCϏϚϟͯϙ ΞϔϏόϏϋϊ΍ϋϜϋϒϕϖϓϋϔϚΘϘϊϏϔχϔωϋχϜχϏϒχψϒϋϏϔCϏϚϟΑχϒϒχϔϊϕϔϚώϋCϏϚϟͯϙϝϋψϙϏϚϋχϚώϚϚϖϙͧͿͿϔϟ΀ϙχϘχϚϕύχϙϖϘϏϔύϙͨωϏϜϏωϖϒϛϙͨωϕϓͿ΍ϕωϛϓϋϔϚCϋϔϚϋϘͿ ΟϏϋϝͿкрсймͿΏϛϒϒ΀Ξ΍Θ Revised 12/2025 City of Saratoga Springs OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES - 2026 Application to City Council FEE Comprehensive Plan Amendment Zoning Ordinance Amendment Planned Unit Development (PUD) Amendment $1,800 + $300/acre $800 + $300/acre $800 + $300/acre Application to Zoning Board of Appeals FEE Use Variance $1,400 + $75/app Area Variance - Residential (1 & 2 Family) $350/1st var + $75/app + $150/ea add variance Area Variance - 3+ Family and Commercial $1,000/1st var + $75/app + $200/ea add variance Interpretations $650 + $75/app Post Work Application Fee Application Fee x2 + $75/app Variance Extensions 50% of Application Fee + $75/app Application to Design Review Board FEE Demolition Residential Structures - 1 or 2 Family Principal or Accessory Structure Materials Change - roof, windows, siding $500 $75 Façade Change - removal/addition of windows, doors, $150 Addition or new construction $300 Approval Extension 50% of application fee 3+/Multi-Family, Comm, Mixed-Use Principal or Accessory Structure Materials Change - roof, windows, siding, paint color $150 Façade Change - removal/addition of windows, doors, $150 Addition or new construction $650 Approval Extension 50% of application fee Post Work Application Fee Application Fee x2 Application to Planning Board Special Use Permit $1,200 + $75/app Temporary Use Permit $500 Special Use Permit - Extension $400 Special Use Permit - Modification $550 + $75/app Site Plan Review - incl. PUD Sketch Plan $400 per sketch Site Plan Full Residential $400 + $250/unit Non-Residential / Mixed-use $800 + $150/1,000 sf (Non-Res) + 250 unit (Res) Administrative SPR Residential $400 Non-Residential / Mixed-use $800 Extension Residential $250 Non-Residential / Mixed-use $350 Subdivision - incl. PUD Sketch Plan $400 per sketch Preliminary Approval Residential: 1-5 Lots $700 + $75/app Residential: 6-10 Lots $1,100 + $75/app Residential: 11-20 Lots $1,450 + $75/app Residential: 21+ Lots $1,800 + $75/app Residential - Extension $350 Final Approval Residential $1,550 + $200/lot + $75/app Non-Residential $2,400/lot + $75/app Final Approval Modification Residential $400 + $75/app Non-Residential $800 + $75/app Final Approval Extension Residential $250 Non-Residential $350 * Subdivisions and Site Plans are subject to Engineering Review- See DPW Fees Demolition $500 Residential Structures – 1 or 2 Family Principal or Accessory Structure Materials Change - roof, windows, siding $75 Façade Change - removal/addition of windows, doors, porch $150 Addition or new construction $300 Approval Extension 50% of Application Fee 3+/Multi-Family, Comm, Mixed-Use Principal or Accessory Structure Equipment Install or Materials Change - roof, windows, siding, paint color $150 Signs, awnings $150 Façade Change - removal/addition of windows, doors, porch $300 Addition or new construction $650 Approval Extension or Modification 50% of Application Fee Post Work Application Fee Application x2 Other Lot Line Adjustment/Subdivision Administrative Action $400 Letter of Credit – Modification Extension $400 Letter of Credit - Collection up to 1% of LoC Recreation Fee $2,000/lot or unit Land Disturbance Activity Permit $750 + $35/acre Watercourse/Wetland Permit $750 Watercourse/Wetland Permit Extension $350 SEQRA EIS Review (Draft & Final) TBD Sidewalk Fee Lieu See DPW Fees Tree Removal Avg. nursery cost in caliper of new species equivalent to diameter at breat height (DBH of tree(s) Removed diameter at breat height (DBH of tree(s) Removed O PRODUCT FEATURE O anti anti Bifaciality >85% SMBB Technology Excellent performance High quality junction box and 100% inspection, Anti LID to guarantee Anti PID Lower temperature Quality RFID Tracking Half Cut Topcon Cell in low -light environments connector systems the reliability of solar systems coefficient ® MANAGEMENT SYSTEM iaISO man Quality management system NE&IS014001: Standard for environmental management system maOHSAS 18001: International standard for occupational health and safety assessment system PRODUCT CERTIFICATES �.� I EC'' RMHT541440-460AB2 REGITEC 182mm 16BB 108Cells Mono Half Cells Glass/Glass TOPCon Bifacial PV Module i.I1011011, 111111 1111121 HER: .011111ilf 10 iffilliflill!1Iltlpl, ==MMMM ' OE' illl:Jlll' 111i - MIMMKUMIM M a 114 NUAIIIIII: =I====I= I N .............. - ------- Current -Voltage & Power -Voltage Curves (RMHT54/460AB2) Voltage (V) Voltage (V) All Dimensions in mm The above drawing is a graphical representation of the product. For engineering quality drawings please contact REGITEC. Module Type RMHT54/440AB2 RMHT54/445AB2 RMHT5/450AB2 RMHT54/455AB2 RMHT54/460AB2 STC NOCT STC NOCT STC NOCT STC NOCT STC NOCT Maximum Power- Pmax(W) 440 3339 445 337.6 450 341,3 455 345 460 348.7 Open Circuit Voltage - Voc(V) 38.90 36.6 39.10 36.7 39.30 36.8 39.50 36.9 39.70 37.0 Short- Circuit Current - Isc(A) 14.31 11,59 14.40 11.65 14.48 11,71 14.56 11,77 14.64 11.83 Voltage at Pmax -Vmp(V) 32.47 30.5 32.65 30.7 3282 30,9 33.00 31.1 33.17 31.3 Current at Pmax - Imp(A) 1355 10.95 13.63 11.03 13.71 11.08 13.79 11.13 13.87 11.18 Module Efficiency -qm(%) 22.00 22.30 22.50 1 22.80 23.00 1 Power Tolerance(W) (0-+4,99W) Maximum System Voltage(V) 1500Vdc (1EC I UL) Maximum Series Fuse Rating (A) 25A STC : Irradiance 1000W/M2, Cell Temperature 25'C, Air Mass 1.5 NOCT Irradiance 800W/m', Ambient Temperature 20^,C, Air Mass 1.5, Wind Speed 1m/s External Dimensions 1762x1134x30mm Power Gain 10% 15% 20% 25% 30% Weight 22kg Maximum Power- Pmax(W) 495 517.5 540 562.5 585 Solar Cells N-Type 16BB 182x94mm (2x54pcs) Open Circuit Voltage - Voc(V) 39.40 39.51 3962 3973 39.85 Glass AR Coated 1.6-1.6 mm tempered glass Short- Circuit Current - Isc(A) 15.90 16.58 1725 1792 18.58 Frame Anodized aluminum alloy Voltage at Pmax -Vmp(V) 32.92 33,03 33.14 33.26 33.37 Junction Box IP68 Current at Pmax - Imp(A) 15.04 15.67 1629 15.91 17,53 Output Cables 4.Omm-, 1200mm (+),1200mm (-), length can be customized Connector StaUbli MC4 Mechanical Load Front Side Max 5400Pa, Rear Side Max. 2400Pa wiv# 1762x1134x30mm Pmax Temperature Coefficient -0.300%/'C Container 40'HQ Voc Temperature Coefficient -0.250%/'C Pieces per Pallet 36 Ise Temperature Coefficient 0 04%t'C Pallets per Container 26 Operating Temperature -40-+85'C Pieces per Container 936 Nominal Operating Cell Temperature(NOCT) 452"C Specifications are Sub Oct to dhiho POWERING THE FUTi ENPHASE. IQ8AC Microinverter Our newest IQ8 Series Microinverters' 2,3 are the industry's first microgrid-forming4, software -defined microinverters with split -phase power conversion capability to convert DC power to AC power efficiently. Peak output power Nominal grid voltage (L-L) Nominal frequency CEC weighted efficiency Maximum input DC voltage MPPT voltage range Maximum module Isc Ambient temperature range 366 VA 350 VA 240 V 208 V split -phase (L-L),180e single-phase (L-L),120e 60 Hz 60 Hz 97.0 % 96.5 60V 60V 28-45 V 28-45 V 20A 20A -40-C to 65-C (-40T to 149T) i -- i Staubli MC4 DC connectors 0 11 LED EnplaseAC conneAor 1.2 in 8.9In I IQ8 Series Microinverters can be added to existing IQ7 systems on the same IQ Gateway only in the following grid -tied configurations: Solar Only or Solar+ Battery (IQ Battery 3T/10T and IQ Battery 5P) without backup. 2 I07 Series Microinverters cannot be added to a site with existing I08 Series Microinverters on the same gateway. Mixed system of IQ7 and IQ8 will not support IOB-specific PCS features and grid -forming capabilities. 3 IQ Microinverters ship with default settings that meet North America's IEEE 1547 interconnection standard requirements. Region -specific adjustments may be requested by an Authority Having Jurisdiction (AHJ) or utility representative, according to the IEEE 1547 interconnection standard. Use an IQ Gateway to make these changes during installation. 4 Meets UL 1741 only when installed with IQ System Controller 2 or 3. NORTH AMERICA p Simple • Lightweight and compact with plug -and -play connectors • Power line communication (PLC) between components • Faster installation with simple two - wire cabling G✓ Reliable • Produces power even when the grid is down4 • More than one million cumulative hours of testing • Industry -leading limited warranty of up to 25 years • Class II double -insulated enclosure • Optimized for the latest high- powered PV modules 0 Microgrid-forming • Complies with the latest advanced grid support • Remote automatic updates for the latest grid requirements • Configurable to support a wide range of grid profiles • Meets CA Rule 21(UL 1741-SA) and IEEE 1547:2018 (UL 1741-SB 3rd Ed.) ® 2024 Enphase Energy. All rights reserved. Enphase, the a and CC logos, 10, and certain other marks listed at DSH-00046-5.0-EN-2024-12-10 htmr//ennhase com/trademark-usane-c uidefnes are trademarks of Enphase Energy, Inc. In the U.S. and other countries. Data subject to change. Commonly used module pairings5 W 295-500 To meet compatibility, PV modules must be within the following Module compatibility _ maximum input DC voltage and maximum module Ise. Module compatibility can be checked at https://enphase.com/installers/ microinverters/calculator. MPPT voltage range V 28-45 Operating range V 18-58 Minimum/Maximum start voltage V 22/58 Maximum input DC voltage V 60 Maximum continuous input DC current A 14 Maximum input DC short-circuit current A 25 Maximum module Is. A 20 Overvoltage class DC port — II DC port backfeed current mA 0 PV array configuration - Ungrounded array; no additional DC side protection required; AC side protection requires a maximum of 20 A per branch circuit • •: •:• •: VAC Peak output power VA 366 350 Maximum continuous output power VA 349 345 Nominal grid voltage (L-L) V 240, split -phase (L-L),180' 208,single-phase (L-L),120° Minimum and maximum grid voltage6 V 211-264 183-229 Maximum continuous output current A 1.45 1.66 Nominal frequency Hz 60 Extended frequency range Hz 47-68 AC short-circuit fault current over three cycles Arms 2.70 Maximum units per 20 A (L-L) branch circuit 7 — 11 9 Total harmonic distortion % <5 Overvoltage class AC port — III AC port backfeed current mA 18 Power factor setting — 1.0 Grid -tied power factor (adjustable) — 0.85 leading ... 0.85 lagging Peak efficiency % 97.3 97.2 CEC weighted efficiency % 97.0 96.5 Nighttime power consumption mW 30 22 Ambient temperature range -40°C to 65°C (-40°F to 149°F) Relative humidity range 4%to 100% (condensing) DC connector type Staubli MC4 5 No enforced DC/AC ratio. 6 Nominal voltage range can be extended beyond nominal if required by the utility. I Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. DSH-00046-5.0-EN-2024-12-10 //�.IRONRIDGE XR100° Rail Rail Section Properties Property Value Total Cross -Sectional Area 0.582 in Section Modulus (X-axis) 0.297 in Moment of Inertia (X-axis) 0.390 in' Moment of Inertia (Y-axis) 0.085 in" Torsional Constant 0.214 in' Polar Moment of Inertia 0.126 in APPROVED MATERIALS: 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 (34,000 PSI YIELD STRENGTH MINIMUM) Mill Part Block Part Description i Lerglh Miaferial Weight Number Number XR-100-168M XR-100-168B XR100, Rail 168" 6000-Series Aluminum 9.9 lbs. XR-100-184M XR-100-184B XR100, Rail 184" 10.8 lbs. XR-100-204M XR-100-204B XR100, Rail204" 11.9 lbs. v1.20 N 0 O ::3 OG = C O rt O Z3 OQ X O m m m (D p O x ki O I D co N V O O O m N CD a CD ti co 3 n v N C U) S r `-f. nCD 0 CY) cC°o V C O N w rn O N N + O v cn z Z CY) J rCD v ((D D CDO ' Q 0 3 N OD O 4', gyp ry O� t � v C) CD n .� Cnn CD C/) • rr� J Q OK r 16s NY29 f; Y .wj Awf snom •l is ��br ���I•f�.. ;�' •1M.. � ' Ni F�f •: WV y r