Loading...
HomeMy WebLinkAbout20260778 58 Washington St Site Plan Cost EstimateCost Estimate for Letter of Credit Planning Board No.: Project: Location: Saratoga Springs, NY Date: 8/28/2026 Firm Name & Preparer: The LA Group, Matt Brobston On Site (All infrastructure & amenities on private property) Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 1 LS $2,500.00 $2,500.00 0% $2,500.00 2 Rough Grading 1 LS $8,000.00 $8,000.00 0% $8,000.00 3 Erosion Control Measures 1 LS $5,000.00 $5,000.00 0% $5,000.00 4 Construction Entrance 1 EA $1,200.00 $1,200.00 0% $1,200.00 Demolition 5 Fence Removal 1 LS $3,000.00 $3,000.00 0% $3,000.00 6 Asphalt Removal 7,055 SF $1.50 $10,582.50 0% $10,582.50 7 Gravel Removal 4,055 SF $0.75 $3,041.25 0% $3,041.25 Hard Scape 8 Concrete Sidewalk 75 SF $10.00 $750.00 0% $750.00 Landscaping 9 Landscaping 1 LS $5,000.00 $5,000.00 0% $5,000.00 Total onsite Work $39,073.75 $39,073.75 Total onsite X.25 $9,768.44 $9,768.44 Off Site (All infrastructure & amenities to be dedicated to the City) Item # Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Demolition 10 Concrete Removal 1,500 SF $2.50 $3,750.00 0% $3,750.00 11 Asphalt Removal 2,045 SF $1.50 $3,067.50 0% $3,067.50 12 Remove Cobra Light 2 EA $2,500.00 $5,000.00 0% $5,000.00 13 Cut/Remove Water Line 1 LS $2,500.00 $2,500.00 0% $2,500.00 Road Construction 13 Asphalt Pavement 1,700 SF $8.00 $13,600.00 0% $13,600.00 14 Concrete Curbing 445 LF $40.00 $17,800.00 0% $17,800.00 15 Concrete Sidewalk 2,310 SF $10.00 $23,100.00 0% $23,100.00 Site Amenities 16 Decrotive Street Light 5 EA $4,500.00 $22,500.00 0% $22,500.00 Off Site Water 58 Washington Street - Hotel 58 Washington Street - Hotel 58 Washington - LOC Estimate 17 6" DIP Water Main 32 LF $85.00 $2,720.00 0% $2,720.00 18 S.S. Tapping Sleeve and Valve Connection 1 EA $3,000.00 $3,000.00 0% $3,000.00 Site Sanitary 19 8" PVC Sanitary Service 35 EA $60.00 $2,100.00 0% $2,100.00 20 Pipe connection 1 EA $3,000.00 $3,000.00 0% $3,000.00 Site Storm 20 8" HDPE Storm Line 14 LF $35.00 $490.00 0% $490.00 21 12" HDPE Storm Line 320 LF $45.00 $14,400.00 0% $14,400.00 22 Catch Basin 3 EA $3,500.00 $10,500.00 0% $10,500.00 23 Connect to Existing Catch Basin 1 EA $1,500.00 $1,500.00 0% $1,500.00 Landscaping 24 Topsoil/Seed/Mulch 1 LS $1,000.00 $1,000.00 0% $1,000.00 25 Street Trees 3 EA $350.00 $1,050.00 0% $1,050.00 Misc. 26 As-built Drawing 1 LS $3,000.00 $3,000.00 0% $3,000.00 Total offsite Work $134,077.50 $134,077.50 Total On-Site Work X25% $9,768.44 Total Off-Site work $134,077.50 Total LOC Amount = $143,900.00 * New LOC Reduced Amount = $143,900.00 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $35,975.00 58 Washington - LOC Estimate