NOTICE OF
ADMINISTRATIVE ACTION
In the matter of the request for administrative action relating to application
#20260738
225 Caroline St. Exterior Modifications
225 Caroline St.
Saratoga Springs, New York 12866
to approve the installation of snow guards to the side and rear facades.
The Chairperson of the Design Review Board finds that, in accordance with Section 8.3 of the Rules and
Regulations of the Design Review Board, the requested action is not substantive in nature and is not
contrary to the intent of the original Board decision. Therefore, the request for administrative action, as
described above, is approved.
September 1, 2026
Date Chair
cc: Building Department File
(Applicant)
(Agent)
Outlook
Re: 225 Caroline-Snow Guards - Admin Approval?
From Tamie Ehinger <tamieehinger@yahoo.com>
Date Tue 9/1/2026 1:16 PM
To Julia Destino <Julia.Destino@saratogaspringsny.gov>
Cc Tamie Ehinger <Tamie.Ehinger@saratogaspringsny.gov>
External sender <tamieehinger@yahoo.com>
Make sure you trust this sender before taking any actions.
Hi Julia,
I am comfortable approving this administratively. I would consider this an act of normal maintenance.
It is not a permanent feature, i.e. can be easily removed if necessary. Factor in the lack of visibility, and
the color matching, and this seems perfectly appropriate. Please consider the installation of the snow
guards administratively approved.
Thank you!
Best,
t a m i e e h i n g e r | 415.710.0836
Sent from my iPhone
On Sep 1, 2026, at 10:49 AM, Julia Destino <Julia.Destino@saratogaspringsny.gov> wrote:
Good morning!
Attached, please find the application for the installation of snow guards at 225 Caroline St.
The guards will be installed on the side and rear facades, not on the front, are an aluminum
metal blend and will be color matched to the new standing seam roof.
Is this something you feel comfortable approving administratively or would you prefer I add
it to an agenda?
Please let me know.
Thank you,
9/4/26, 11:51 AM Inbox - Julia Destino - Outlook
https://outlook.cloud.microsoft/mail/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AxlDIuR%2FRMEO89B%2FMS6nl%2BQACKc1bKgAA 1/2
8/18/26, 7:15 PM 2026-07-31 19:26:51Z.jpeg
https://mail.google.com/mail/u/1/#inbox?projector-1 1/1
8/18/26, 7:14 PM 2026-07-31 19:26:51 Z.jpeg
r
https://mail.google.com/mail/u/1/#inbox?projector-1 1/1
8/18/26, 7:14 PM 2026-07-31 19:26:51Z.jpeg
https://mail.google.com/mail/u/1Anbox/FMfcgzQhVrKfGhQPZDGRLZBrhJDvRMxH?projector=1 &messagePartld=0.1 1/1
imI
The Right Way
QolorGard' 2.0
NEW and IMPROVED Snow
Retention Solution -
Designed with safety, simplicity and
reliability in mind, the next -generation
ColorGard snow retention system is
engineered to reduce the risk of rooftop
avalanches while preserving the sleek
aesthetics of your metal roof.
y.+
Rooftop avalanches pose a significant risk
during winter months, as accumulated
ensnowandiceoftenslideofftheroof
G masse,"endangering people and property
below. Make your metal roof safe for the
winter with the all -NEW ColorGard 2.0
system.
4
O You Asked. We Delivered.
After listening to valuable customer
a) feedback, our team has engineered
E an enhanced version of our flagship
O
ColorGard snow retention system. This
W new design simplifies the assembly
process and significantly reduces
installation time.
No longer are installers required to
preassemble ColorGard before getting
on the roof — it is now a true lay -and -
play system for new construction
and retrofit applications. Have
post -installation design changes? No
problem with ColorGard 2.0, as retrofit
modifications are quick and easy.
Features and Benefits
NO IN -FIELD CUTTING: with the new internal
splice, the VersaClipT1 can be installed directly
over all splices, eliminating the need for in -field
cutting; ColorGard 2.0 crossmembers now require
field cutting only at the end of the assembly.
CUSTOMIZABLE AND VERSATILE: site -specific
engineering allows for optimal performance on
exposed -fastened and standing seam metal
roof profiles
UNPARALLELED PERFORMANCE: designed to
last the life of the roof with corrosion -resistant
materials; load -tested on 500+ roof profiles,
ensuring safety and reliability
AESTHETICALLY PLEASING: visually enhance
the look of the roof with perfect color- and
finish -matching
0
N
13
C
0
888-825-3432 1 www.S-5.com
000DairGardO 2.0
SpHice
Included with crossmembers. Use the Splice to join two
pieces of ColorGard together, ensuring continuous, unbroken
protection.The dimple in the center is designed to provide a
gap, allowing for expansion and contraction of the ColorGard
sections.
SnaCHp` 2.0
SnoClip can be added to retard the migration of snow and ice
beneath the crossmembers. Simply insert it onto the ColorGard
crossmember during or following installation and secure the
fastener to engage the SnoClip foot onto the roof.
versaGilO p'" 2.0
VersaClip goes in place as ColorGard crossmember is installed. It
no longer has to be preassembled to the crossmember.
CODOO [r&NPTM
Not included. The ColorStrip should be supplied in 2 in (50.8
mm) wide strips by the manufacturer of the roofing material
in order to ensure a perfect color match for the life of the roof
system.
Simple Installation!
With this new and improved redesign,
installation of the SnoClip and VersaClip
components are refined and improved,
resulting in a true "lay -and -play" assembly.
AT30Torx drive is used for all clamp set
screws, attachment bolts and SnoClip
fasteners on the snow retention system,
further simplifying the installation process.
5-510 Warningl Please use this product responsiblyl
Products are protected by multiple U.S. and foreign patents. Visit the website at www.S-5.com for complete
information on patents and trademarks. For maximum holding strength, setscrews should betensioned and re -
tensioned as the seam material compresses, Clamp setscrewtension should be verified using a calibrated torque
wrench between 160 and 180 inch pounds when used on 22ga steel, and between 130 and 150 inch pouncisforall
other metals and thinner gauges of steel. Consult the S-51 website at www.S-5.com for published data regarding
holding strength.
Crossmember
Splice
SnoClip 2.0 II SnoClip 2.0 III
snap
Distributed by
VersaClip 2.0
2 in
50.8 mm)
Copyright2026, Metal Roof Innovations, Ltd. S-5! products are patent protected.
S-51 aggressively protects its patents, trademarks and copyrights. Version 061526.