Loading...
HomeMy WebLinkAbout20260745 673 Crescent Ave Subdivision Engineering Report Engineering Report Water and Sanitary Sewer For 673 Crescent Ave Subdivision Saratoga Springs, New York PB # XXXXXXXX Prepared For: Tuz & Weilbaker 673 Crescent Ave Saratoga Springs, NY 12866 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 August 19, 2026 PROJECT DESCRIPTION The project is located at 673 Crescent Ave in the City of Saratoga Springs, New York. It involves the subdivision of one residential parcel into two residential parcels. The existing parcels are zoned RR Rural Residential. EXISTING CONDITIONS Water Distribution – A 12” City of Saratoga Springs watermain is located within the west side of Crescent Ave. An existing hydrant is located along the front edge of the parcel. Sanitary Sewer – A sanitary main runs along the east side of Crescent Ave, with a manhole located on the line. This sanitary main flows via gravity to the Saratoga County Sewer District (SCSD) Pump Station that eventually discharges to the SCSD treatment plant in Mechanicville. SEWER AND WATER USAGE The table below provides information on the anticipated average potable water use and wastewater flow rates for the project. Water use and wastewater flow are estimated to be equal for this study. Table - Average Daily Flow (ADF) 3 Bedroom Home: (2 homes) x (330 gpd/home)1 660 gpd Total 660 gpd Summary of Design Flows Average daily flow for wastewater is estimated to be 0.5 gallons per minute (gpm) based on a 24 hour day. Estimated peak hourly flow is 2.2 gpm (4.41 x average).2 Average daily demand for water is estimated to be approximately equal to the wastewater flow or 0.5 gpm. Instantaneous peak demand is estimated at 3.0 gpm3 for each residence giving a total instantaneous demand of 6.0 gpm. PROPOSED CONDITIONS Water Distribution – To serve the project, two (2) new 3/4” copper water services will be connected to the existing 12” water main. The nearest fire hydrant is located on the west side of Crescent Ave, at the southern property line of the project. Sanitary Sewer – To service the project, two (2) new sanitary sewer services will be installed at the existing sewer main. Notes: 1. From Table 1, Appendix 75-A Wastewater Treatment Standards - Residential Onsite Systems (110 gallons per day per bedroom) 2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q = (18 + P ½) ÷ (4 + P ½) where P = population in thousands 3. From Tables XIV Community Water Systems Source Book, Ameen (3.0 gpm/residence)