Loading...
HomeMy WebLinkAbout20260722 69 Outlook Ave Subdivision ApplicationProperty Address/Location: _______________________________________________________________ Tax Parcel #: ___________________________________ Zoning District:___________________________ APPLICANT(S)* OWNER(S) (If not applicant) ATTORNEY/AGENT Name Address Phone Email Identify primary contact person:  Applicant Owner Agent APPLICATION FOR: ___ PRELIMINARY BBB FINAL SUBDIVISION CITY OF SARATOGA SPRINGS PLANNING BOARD CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 www.saratoga-springs.org **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** Total Acres:________________________ Application Fee: Make checks payable to the "Commissioner of Finance”. REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Check City’s website (www.saratoga-springs.org) for meeting dates. *An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Has a previous application been filed with PB for this property? NO ____ YES ____ If YES, include Application TYPE _______________________ and DATE: _______________ Does any City officer, Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES_____ NO _____. If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the Planning Board for the identified property above. I agree to meet all requirements under the Unified Development Ordinance for the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. Applicant Signature: ______________________________________________ Date: __________________ If applicant is not current owner, owner must also sign. Owner Signature: ______________________________________________ Date: __________________ Revised /2022 [FOR OFFICE USE] _____________BB Application  _________BB_ Date received @@@@@@@@@@@@@@@@@@@@@@@@@@ 3roMect Title Check if PH Required Staff Review _______________ (for example: 165.52-4-37) __ RR/SR - Conservation DeViJn Required Land to be Subdivided Into:__________Lots City of Saratoga Springs Subdivision Checklist 1 Checklist Prepared By: __________________________________ Date: ____________ Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs’ Subdivision Approval (Article 14). The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: CHECK EACH ITEM … 1.Completed Subdivision Application … 2.SEQR Environmental Assessment Form- short or long form as required by action. … 3.Set of plans including: (1) large scale plans (sheets must be 24” x 36”, drawn to a scale of not more than 1”=50 feet) aQG (1) 11 [ 1 cop\ 2Qe digital version 1%' oI all VXEPittal itePV priQtaEle to scale … 4. Basic or Full Storm Water Pollution Prevention Plan as required per Article 1 oI tKe 8'2. … 5.Copy of signed DPW water connection agreement for all projects involving new water connections to the City system … 6.Engineering Report for Water and Sanitary … .3roMect &oVt (VtiPate Ior /etter oI &reGit (Xtili]e &it\ tePplate) REQUIRED ITEMS ON SUBDIVISION PLAT, AS APPLICABLE: … 1.Name of Subdivision … .Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. … .North arrow and map scale PRELIMINARY/ FINAL SUBDIVISION APPROVAL REQUIRED SUBMITTAL CHECKLIST *1 hard copy  Z/RULJLQDO VLJQDWXUH(s  1 digital copy of ALL materials (all maps, drawings, or image documents as separate files) DQG FHH DUH required. CITY OF SARATOGA SPRINGS PLANNING BOARD CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 www.saratoga-springs.org 1a &oQVervatioQ 'eViJQ (Article 1) iI reTXireG City of Saratoga Springs Subdivision Checklist 2 … 5.Parcel tax map number … 6.Site location map ZitK title ElocN aQG Pap Ne\) … 7.Site vicinity map (all features within 300 feet of property) … 8.Identification of current zoning distSiDt with corresponding GiPeQVioQal VtaQGarGV … 9.Building setback lines shown on plans … 10.Title block with subdivision name; name and address of applicant; and name and address of property owner (if different) … 11.Name, address and phone number of subdivision surveyor and/or engineer … 12.Names of all adjacent property owners within 300 feet (include both sides of street) … 13.,GeQtiIicatioQ oI Vi]e Paterial elevatioQV aQG VlopeV oI all e[iVtiQJ aQG propoVeG XtilitieV ZitKiQ 4 It oI Vite … 14.Parcel street address (existing and any proposed postal addresses) Yes No N/A 1.Identification of existing or proposed easements, covenants or legal rights-of-way on this property 1.References to all prior variances or special use permits 1.Existing and proposed contours and spot grades (at 2 foot intervals) e[teQGiQJ to propert\ EoXQGar\ .Identification of all watercourses, designated State wetlands, Federal wetlands, EXIIerV floodplaiQV rock outcroppings, etc. .Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition .Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) .Location and distance to fire hydrant .Erosion and sediment control plan – including designated concrete truck washout area .Approximate location, dimensions and areas for proposed lots and proposed public recreational land .Proposal for utility systems and lateral connections .Location and width of proposed streets … ./ocatioQ oI propoVeG KoPe oQ eacK lot iQclXGiQJ IiQiVK Iloor elevatioQ to QeareVt teQtK Ioot … 1.,Qcorporate tKe &it\ V VtaQGarG eQJiQeeriQJ GetailV City of Saratoga Springs OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES - 2026 Application to City Council FEE Comprehensive Plan Amendment Zoning Ordinance Amendment Planned Unit Development (PUD) Amendment $1,800 + $300/acre $800 + $300/acre $800 + $300/acre Application to Zoning Board of Appeals FEE Use Variance $1,400 + $75/app Area Variance - Residential (1 & 2 Family) $350/1st var + $75/app + $150/ea add variance Area Variance - 3+ Family and Commercial $1,000/1st var + $75/app + $200/ea add variance Interpretations $650 + $75/app Post Work Application Fee Application Fee x2 + $75/app Variance Extensions 50% of Application Fee + $75/app Application to Design Review Board FEE Demolition Residential Structures - 1 or 2 Family Principal or Accessory Structure Materials Change - roof, windows, siding $500 $75 Façade Change - removal/addition of windows, doors, $150 Addition or new construction $300 Approval Extension 50% of application fee 3+/Multi-Family, Comm, Mixed-Use Principal or Accessory Structure Materials Change - roof, windows, siding, paint color $150 Façade Change - removal/addition of windows, doors, $150 Addition or new construction $650 Approval Extension 50% of application fee Post Work Application Fee Application Fee x2 Application to Planning Board Special Use Permit $1,200 + $75/app Temporary Use Permit $500 Special Use Permit - Extension $400 Special Use Permit - Modification $550 + $75/app Site Plan Review - incl. PUD Sketch Plan $400 per sketch Site Plan Full Residential $400 + $250/unit Non-Residential / Mixed-use $800 + $150/1,000 sf (Non-Res) + 250 unit (Res) Administrative SPR Residential $400 Non-Residential / Mixed-use $800 Extension Residential $250 Non-Residential / Mixed-use $350 Subdivision - incl. PUD Sketch Plan $400 per sketch Preliminary Approval Residential: 1-5 Lots $700 + $75/app Residential: 6-10 Lots $1,100 + $75/app Residential: 11-20 Lots $1,450 + $75/app Residential: 21+ Lots $1,800 + $75/app Residential - Extension $350 Final Approval Residential $1,550 + $200/lot + $75/app Non-Residential $2,400/lot + $75/app Final Approval Modification Residential $400 + $75/app Non-Residential $800 + $75/app Final Approval Extension Residential $250 Non-Residential $350 * Subdivisions and Site Plans are subject to Engineering Review- See DPW Fees Demolition $500 Residential Structures – 1 or 2 Family Principal or Accessory Structure Materials Change - roof, windows, siding $75 Façade Change - removal/addition of windows, doors, porch $150 Addition or new construction $300 Approval Extension 50% of Application Fee 3+/Multi-Family, Comm, Mixed-Use Principal or Accessory Structure Equipment Install or Materials Change - roof, windows, siding, paint color $150 Signs, awnings $150 Façade Change - removal/addition of windows, doors, porch $300 Addition or new construction $650 Approval Extension or Modification 50% of Application Fee Post Work Application Fee Application x2 Other Lot Line Adjustment/Subdivision Administrative Action $400 Letter of Credit – Modification Extension $400 Letter of Credit - Collection up to 1% of LoC Recreation Fee $2,000/lot or unit Land Disturbance Activity Permit $750 + $35/acre Watercourse/Wetland Permit $750 Watercourse/Wetland Permit Extension $350 SEQRA EIS Review (Draft & Final) TBD Sidewalk Fee Lieu See DPW Fees Tree Removal Avg. nursery cost in caliper of new species equivalent to diameter at breat height (DBH of tree(s) Removed diameter at breat height (DBH of tree(s) Removed