Loading...
HomeMy WebLinkAbout20190432 Blackler Residence 1-17-20 Correspondence City of Saratoga Springs ,11(::1 .,, �..,..011(; , i. BUILDING DEPARTMENT PATRICK COGAN CITY HALL Zoning&Building Inspector �`- w r. Extension 44511 , ' 474 Broadway DUANE MILLER Jf:.1 . Saratoga Springs,NY 12866 Assistant Building Inspector ,c, c KU`9" Extension 1514 Telephone (518)587-3550 Ext. 2511 JOHN BARNEY • BUILDING & www.saratoga-springs.org Assistant Building& PLUMBING Construction Inspector • CODES Extension 1.511 RICHARD TIERSCH Assistant Building& Construction Inspector Extension 45G5 January 17, 2020 William Cottrell 36 Cottrell Lane Hoosick Falls,NY 12090 RE: 62 Van Dam—Request to accept engineer's inspection Mr. Cottrell, I am in receipt of your letter dated 1/13/20 regarding the project at 62 Van Dam St. and the request to accept your inspections and photos in lieu of the required Building Department inspections. Unfortunately, I am unable to accommodate this request. After reviewing the Building Department file,the project history,and the photos provided I have very serious concerns about the manner in which this project has been conducted. Mr. Blackler received a Stop Work Order on 5/8/17 and was ordered to halt construction without the proper approvals and permits. Mr. Blackler has been advised many times that he was not to proceed with the renovations to the house until such approvals and permits were obtained. The fact that he chose to continue the work without authorization is,as you say, regrettable. As Mr. Barney has indicated during the permit review,conditioned on the permit itself, and stated on inspection reports, all drywall must be removed in the existing portion of the structure in order to allow for the required Building Department inspections. The Building Department must inspect all the framing, fire blocking, fire rated assemblies, plumbing work, HVAC work, and insulation. All rough wiring must be inspected by an approved third party electrical inspection agency. It is also quite evident that extensive plumbing work has been done without a Plumbing Permit. The Plumbing Permit must be obtained by a licensed Master Plumber. Once the permit is obtained,all rough plumbing will need to be tested and those tests observed by the Building Department. Plastic piping systems must be tested with water, not air. We will not accept any plumber's affidavit on this project. Once the Plumbing Permit is in place and all framing has been exposed, Mr. Blackler will need to call our office to schedule a framing inspection. Work will not be allowed to proceed beyond the scope that is specifically authorized on the inspection reports. Multiple inspections will be required to verify that the fire rated assemblies are constructed in compliance with the UL listing. Page I 1 Please understand that while I respect your professional opinion and assessment of the work that you observed, I cannot in good conscience issue a CO for this property with the amount of work that has gone uninspected. I would not be fulfilling my obligation and duty to future owners and occupants. On Wednesday, January 8th I attended a Design Review Commission caravan at the project site. During that meeting on site, I noticed that the rated sheathing was being installed incorrectly. The current installation method would not be compliant with the UL listing, the manufacturer's install instructions, the ICC-ES report,the project drawings, or good construction practice. Based on what I observed, all exterior work must cease until such time as Mr. Blackler has obtained approval from the Design Review Commission and the Building Department. Once DRC approval has been granted, any required changes must be submitted on revised stamped construction drawings for Building Department review and approval. Exterior work will only be allowed to proceed in accordance with the revised approved drawings. Any exterior work that has not been approved or is not done according to the approved drawings will need to be removed. Please feel free to contact me with any questions about this project, and thank you for any assistance you can provide to make sure this project proceeds in a safe and compliant manner. Sincerely, Patrick Cogan Zoning and Building Inspector Cc S. Blackler J. Barney B. Birge Page I 2