Loading...
HomeMy WebLinkAbout20260708 269 Broadway Site Plan Review Cost EstimateCost Estimate for Letter of Credit (Template) (Note: This is not an all inclusive list. Please adjust for project specifics.) Planning Board No.: Project: 269 Broadway Location: 269 Broadway Saratoga Springs, NY Date: 8/14/2026 Firm Name & Preparer: Studio A Landscape Architecture & Engineering, D.P.C. Page 1 of 2 On Site (All infrastructure & amenities on private property) Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Mobilization 1.00 LS $35,000.00 $35,000.00 0% $35,000.00 2 Clearing & Grubbing 260.00 CY $85.00 $22,100.00 0% $22,100.00 3 Misc. Erosion Control Measures 1 LS $25,000.00 $25,000.00 0%$25,000.00 Demolition 4 Asphalt Removal 8,645 SF $4.00 $34,580.00 0% $34,580.00 5 Concrete Removal 824 SF $5.00 $4,120.00 0% $4,120.00 6 Utility Reclocation, Removal, Abandonment 1 LS $20,000.00 $20,000.00 0% $20,000.00 Hard Scape 7 Permable Pavers 230 SF $30.00 $6,900.00 0% $6,900.00 8 Subbase (for Permeable Pavers) 9 CY $50.00 $425.93 0% $425.93 9 Green Roof 767 SF $100.00 $76,700.00 0% $76,700.00 10 Decomposed Granite 246 SF $30.00 $7,380.00 0% $7,380.00 11 Concrete Sidewalk 824 SF $15.00 $12,360.00 0% $12,360.00 12 Subbase (for Concrete Sidewalk) 31 CY $50.00 $1,525.93 0% $1,525.93 13 Concrete Driveway Apron 306 SF $20.00 $6,120.00 0% $6,120.00 14 Subbase (for Concrete Driveway Apron) 11 CY $50.00 $566.67 0% $566.67 15 Stepping Stones 27 EA $20.00 $540.00 0% $540.00 Site Amenities 16 Traffic Signs (Remove and Reset) 11 EA $1,200.00 $13,200.00 0% $13,200.00 17 Bench 3 EA $1,500.00 $4,500.00 0% $4,500.00 18 Site Lighting (Remove and Reset/Relocate/New Fixture) 1 LS $20,000.00 $20,000.00 0% $20,000.00 19 Raised Plant Bed Walls 636 IN $12.20 $7,759.20 0% $7,759.20 20 Raised Plant Bed Filter Media 4 CY $50.00 $195.68 0% $195.68 Site Water 21 6" DIP Class 52 Water Main 32 LF $110.00 $3,520.00 0% $3,520.00 22 Water Fittings 1 LS $2,000.00 $2,000.00 0% $2,000.00 Site Sanitary 23 8" SDR-26 Sanitary Line & Stone 16 LF $100.00 $1,600.00 0% $1,600.00 Site Storm 24 Roof Leader (8" HDPE) 100 LF $25.00 $2,500.00 0% $2,500.00 25 12" HDPE Storm Drain & Stone 266 LF $50.00 $13,300.00 0% $13,300.00 26 Manhole Structure 2 EA $2,500.00 $5,000.00 0% $5,000.00 27 Infiltration Chambers 9 EA $560.00 $5,040.00 0% $5,040.00 Landscaping 28 Topsoil/Seed/Mulch 310 SF $7.00 $2,170.00 0% $2,170.00 29 Deciduous Trees 9 EA $800.00 $7,200.00 0% $7,200.00 30 Shrubs 109 EA $100.00 $10,900.00 0%$10,900.00 269 Broadway LOC 7-16-2206.xls Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Total onsite Work $352,203.40 $352,203.40 Total onsite X.25 $88,050.85 $88,050.85 Off Site (All infrastructure & amenities to be dedicated to the City) Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 31 Clearing & Grubbing 0.06 AC $1,500.00 $84.57 0% $84.57 Demolition 32 Asphalt Removal 482 SF $4.00 $1,928.00 0% $1,928.00 33 Concrete Removal 1,270 SF $5.00 $6,350.00 0% $6,350.00 34 Curb Removal 84 LF $10.00 $840.00 0% $840.00 35 Sawcut Pavement 260 LF $10.00 $2,600.00 0% $2,600.00 Road Construction 36 CIP Conc. Curbing 84 LF $30.00 $2,520.00 0% $2,520.00 37 Asphalt Pavement (inc. subbase) 482 SF $55.00 $26,510.00 0% $26,510.00 38 Concrete Sidewalk with Radiant Heating 1,451 SF $30.00 $43,530.00 0% $43,530.00 39 Subbase (for Concrete Sidewalk) 54 CY $50.00 $2,687.04 0% $2,687.04 Site Amenities 40 Traffic Signs (Remove and Reset) 1 EA $250.00 $250.00 0% $250.00 Off Site Water 41 6" Mueller Gate Valve 2 EA $500.00 $1,000.00 0% $1,000.00 Tapping Sleeve 2 EA $6,500.00 $13,000.00 0% $13,000.00 42 Water Fittings 1 LS $5,000.00 $5,000.00 0% $5,000.00 43 Testing & Disinfection 1 LS $1,000.00 $1,000.00 0% $1,000.00 Off Site Sanitary 44 Saddle Connection 1 EA $1,500.00 $1,500.00 0% $1,500.00 Off Site Storm 45 Storm Connection 1 EA $1,500.00 $1,500.00 0% $1,500.00 Landscaping 46 Topsoil/Seed/Mulch 310 SF $7.00 $2,170.00 0% $2,170.00 47 Deciduous Trees 3 EA $750.00 $2,250.00 0% $2,250.00 Misc. 48 As-built Drawing 1 LS $6,000.00 $6,000.00 0% $6,000.00 Total offsite Work $120,719.61 $120,719.61 Total On-Site Work X25%$88,050.85 Total Off-Site work $120,719.61 Total LOC Amount = $208,770.46 * New LOC Reduced Amount = $208,770.46 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $52,192.61 269 Broadway LOC 7-16-2206.xls