Loading...
HomeMy WebLinkAbout20250566 33-35 Caroline St Site Plan Revised Cost EstimateCost Estimate for Letter of Credit (Template) (Note: This is not an all inclusive list. Please adjust for project specifics.) Planning Board No.: #20250566 Planning Board No.: Kearneys Block Planning Board No.: 33-35 Caroline Street Saratoga Springs, NY Date: 6/12/2026 Revised 7/16/26 Firm Name & Preparer: Bohler & Dempsey Page 1 of 3 On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 0 AC $0.00 $0.00 0%$0.00 2 Rough Grading 0 CY $0.00 $0.00 0%$0.00 3 Silt Fence 130 LF $5.00 $650.00 0%$650.00 4 Construction Entrance 1 EA $300.00 $300.00 0%$300.00 5 Buffer Protection 0 EA $0.00 $0.00 0%$0.00 6 Misc. Erosion Control Measures Inlet protection 1 EA $0.00 $0.00 0%$0.00 Demolition 7 Building Removal 0 EA $0.00 $0.00 0%$0.00 8 Asphalt Removal 500 SF $10.00 $5,000.00 0%$5,000.00 9 Concrete Removal 2,200 SF $5.00 $11,000.00 0%$11,000.00 Hard Scape 10 Stone Subbase 0 CY $0.00 $0.00 0%$0.00 11 Asphalt Pavement 0 SF $0.00 $0.00 0%$0.00 12 CIP Curbing 0 LF $0.00 $0.00 0%$0.00 13 Concrete Sidewalk 230 SF $28.00 $6,440.00 0%$6,440.00 14 Retaining Wall 0 LF $0.00 $0.00 0%$0.00 Site Amenities 15 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 16 Striping 0 LS $0.00 $0.00 0%$0.00 17 Crosswalk 0 LS $0.00 $0.00 0%$0.00 18 Bench 0 EA $0.00 $0.00 0%$0.00 19 Bike Rack EA $0.00 $0.00 0%$0.00 20 Site Lighting 0 EA $0.00 $0.00 0%$0.00 21 Fencing 0 LF $0.00 $0.00 0%$0.00 Site Water 22 6" DIP Class 52 Water Main 10 LF $200.00 $2,000.00 0%$2,000.00 23 3/4" Type K Copper Water Service 0 EA $0.00 $0.00 0%$0.00 24 1" Type K Copper Water Service EA $0.00 0%$0.00 25 Water Fittings 1 EA $2,000.00 $2,000.00 0%$2,000.00 26 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 D. LOC33-35CarolineSt Page 2 of 3 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary 27 6" SDR-26 Sanitary Line & Stone 0 LF $0.00 $0.00 0%$0.00 28 8" SDR-26 Sanitary Line & Stone 0 LF $0.00 $0.00 0%$0.00 29 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Site Storm 30 6" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 31 12" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 32 Catch Basin 0 EA $0.00 $0.00 0%$0.00 33 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 34 Yard Drains 0 EA $0.00 $0.00 0%$0.00 Stormwater Management 35 Bioretention Area 0 EA $0.00 $0.00 0%$0.00 36 UG Infiltration Chambers 0 EA $0.00 $0.00 0%$0.00 37 Hydrodynamic Separator 0 EA $0.00 $0.00 0%$0.00 38 Wet Pond 0 EA $0.00 $0.00 0%$0.00 Landscaping 39 Topsoil/Seed/Mulch 0 CY $0.00 $0.00 0%$0.00 40 Deciduous Trees 0 EA $0.00 $0.00 0%$0.00 41 Shrubs 0 EA $0.00 $0.00 0%$0.00 Total onsite Work $27,390.00 $27,390.00 Total onsite X.25 $6,847.50 $6,847.50 Off Site (All infrastructure & amenities to be dedicated to the City) Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Road Construction 42 Stonel Subbase 93 CY $5.00 $465.00 0%$465.00 43 Asphalt Pavement (Binder)2,500 SF $4.00 $10,000.00 0%$10,000.00 44 Asphalt Pavement (Top)2,500 SF $3.00 $7,500.00 0%$7,500.00 45 Concrete Curbing 2,500 LF $6.50 $16,250.00 0%$16,250.00 46 Concrete Sidewalk 1,750 SF $28.00 $49,000.00 0%$49,000.00 Site Amenities 47 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 48 Striping 0 LS $0.00 $0.00 0%$0.00 49 Crosswalk 0 LS $0.00 $0.00 0%$0.00 50 Street Signs 0 EA $0.00 $0.00 0%$0.00 51 Decrotive Street Light 2 EA $7,000.00 $14,000.00 0%$14,000.00 Off Site Water 52 6" DIP class 52 Water Main 10 LF $200.00 $2,000.00 0%$2,000.00 53 6" Mueller Gate Valve 1 EA $1,000.00 $1,000.00 0%$1,000.00 54 8" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 55 8" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 56 S.S. Tapping Sleeve and Valve Connection 1 EA $1,000.00 $1,000.00 0%$1,000.00 57 3/4" Corp, WSO and Type K water service to PL 0 EA $0.00 $0.00 0%$0.00 58 1" Corp, WSO and Type K water service to PL 0 EA $0.00 $0.00 0%$0.00 59 Water Fittings 1 EA $1,000.00 $1,000.00 0%$1,000.00 60 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 61 Testing & Disinfection 1 LS $0.00 $0.00 0%$0.00 D. LOC33-35CarolineSt Page 3 of 3 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Site Sanitary 62 SDR-35 6" Sanitary Service to PL & Stone 0 EA $0.00 $0.00 0%$0.00 63 SDR-35 8" Sanitary Main & Stone 30 LF $250.00 $7,500.00 0%$7,500.00 64 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 65 Kor N' Seal connection 1 EA $1,500.00 $1,500.00 0%$1,500.00 Site Storm 66 12" HDPE Storm Line & Stone 95 LF $25.00 $2,375.00 0%$2,375.00 67 Catch Basin 1 EA $5,000.00 $5,000.00 0%$5,000.00 68 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Landscaping 69 Topsoil/Seed/Mulch 0 CY $0.00 $0.00 0%$0.00 70 Street Trees 4 EA $4,000.00 $16,000.00 0%$16,000.00 Misc. 71 As-built Drawing 1 EA $2,500.00 $2,500.00 0%$2,500.00 72 Electric Line 1 EA $10,000.00 $10,000.00 0%$10,000.00 Total offsite Work $147,090.00 $147,090.00 Total On-Site Work X25%$6,847.50 Total Off-Site work ######### Total LOC Amount = #########* New LOC Reduced Amount = $153,937.50 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $38,484.38 D. LOC33-35CarolineSt