Loading...
HomeMy WebLinkAbout20250566 33-35 Caroline St Site Plan Revised Dewatering Letter - 35 Caroline Dempsey Construction & Development 54 Minot St, Boston, MA 02122 July 14, 2026 To Whom It May Concern: Based on two prior excavations, we believe we will not encounter any groundwater until approximately 12’ 6” below grade on Caroline Street. Once we encounter the water table, water will be funneled through crushed stone to one of the few local sumps in the site. There the water will be tested for any chemicals before being pumped through a geotextile filter bag to filter out any remaining silt. The geotextile bag will be placed right outside of the site barriers on top of the storm drain on Caroline Street. Below are images from the prior excavations, rough sump locations and diagram, and details of the geotextile bag. Sincerely, Cronan Dempsey Dempsey Construction & Development Local Sump Diagram - Above is a rough diagram of how on-site sumps will look - Sumps will include a perforated drainage pipe encased in crushed stone that will filter out initial mud and silt and provide a space for water to be tested for any chemicals - Sump pumps in the drainage pipe will then pump water to the final sump and/or directly to the geotextile bag and into the Caroline St storm drain Geotextile Bag Details - A geotextile filter bag like the one pictured above will be placed over the storm drain on Caroline Street to act as a final filter for the groundwater before it enters the drain. - We plan to use a 2’ x 2’ or 3’ x 3’ bag like the one linked below - https://www.grainger.com/product/ENPAC-Dewatering-Bag-36-in-x-36-38E778 Dempsey Construction & Development Test Pit 1 - Water table encountered at 12’ 6” below grade on Caroline Street Te st Pit 2 - Water table encountered at 12’ 6” below grade on Caroline Street Dempsey Construction & Development Excavation and Sump Locations