HomeMy WebLinkAbout20260672 624 N Broadway Site Plan Cost EstimateCost Estimate for Letter of Credit Planning Board No.: 202xxxxx Project: 624 North Broadway Location: Date: 8/7/2026 Firm Name & Preparer: The LA Group (Job # 2026027) Abigail Neill On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Erosion Control (including silt fence)1 LS $1,500.00 $1,500.00 0%$1,500.00 2 Site Clearing, Preparation, & Building Demo 1 LS $50,000.00 $50,000.00 0%$50,000.00 3 Construction Entrance 1 EA $500.00 $500.00 0%$500.00 Site Utilities 4 6" PVC Sanitary Line 14 LF $50.00 $700.00 0%$700.00 5 4" DIP Water Line 16 LF $70.00 $1,120.00 0%$1,120.00 6 12" HDPE Storm Pipe 82 LF $45.00 $3,690.00 0%$3,690.00 7 Catch Basin 2 EA $3,000.00 $6,000.00 0%$6,000.00 Misc 8 Concrete Walk & Pavers 282 SF $7.00 $1,974.00 0%$1,974.00 9 Pavement (Backfill, Subbase, Binder, Top)3,254 SF $6.00 $19,524.00 0%$19,524.00 10 Trees 14 EA $600.00 $8,400.00 0%$8,400.00 11 Perennials, Topsoil & Seed 1 LS $5,000.00 $5,000.00 0%$5,000.00 12 Shrubs 18 EA $250.00 $4,500.00 0%$4,500.00 13 Retaining Wall 1 LS $8,000.00 $8,000.00 0%$8,000.00 Total onsite Work $110,908.00 $110,908.00 Total onsite X.25 $27,727.00 $27,727.00 Off Site (All infrastructure & amenities to be dedicated to the City) Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Misc. 14 Demolition (Concrete, Curb, Asphalt)1 LS $2,000.00 $2,000.00 0%$2,000.00 15 Concrete Walk 917 SF $7.00 $6,419.00 0%$6,419.00 16 Pavement Patch (Backfill, Subbase, Binder, Top)491 SF $9.00 $4,419.00 0%$4,419.00 17 Curbing 23 LF $35.00 $805.00 0%$805.00 18 Trees 2 EA $600.00 $1,200.00 0%$1,200.00 Site Utilities 19 Sanitary Sewer Connection 1 EA $2,500.00 $2,500.00 0%$2,500.00 20 6" PVC Sanitary Line 28 LF $50.00 $1,400.00 0%$1,400.00 21 4" Water Service Connection 1 EA $4,500.00 $4,500.00 0%$4,500.00 22 4" DIP Water Line 32 LF $70.00 $2,240.00 0%$2,240.00 23 12" HDPE Storm Pipe 21 LF $45.00 $945.00 0%$945.00 Saratoga Springs, NY 624 North Broadway 2026-07-31 624 North Broadway LOC 24 As Built Drawings 1 LS $2,000.00 $2,000.00 0%$2,000.00 Total offsite Work $28,428.00 $28,428.00 Total On-Site Work X25%$27,727.00 Total Off-Site work $28,428.00 Total = $56,155.00 * New LOC Reduced Amount = XXXX LOC Amount = $56,500.00 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $14,125.00 (25% LOC Amount) 2026-07-31 624 North Broadway LOC