Loading...
HomeMy WebLinkAbout20260656 11 Federal St Site Plan Engineering Report Engineering Report Water and Sanitary Sewer For CONGRESS/FEDERAL STREET SARATOGA SPRINGS, NY 12866 Planning Board # XXXX Prepared For: JEM Capital Holding LLC / JRM Capital Holdings LLC 42 East Avenue, Saratoga Springs, NY 12866 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 July 29, 2026 I. Project Description The project includes the demolition of the existing building and redevelopment of the site to include a 5-story multi-use building. The building will be a mixture of a hotel, restaurant, and residential units. II. Existing Water and Sanitary Sewer Utilities Municipal water service is provided in the vicinity of the project site by the City of Saratoga Springs. A 10-inch diameter water main is located in Federal Street and a 6-inch diameter water main in Congress Street. A hydrant flow test was conducted November 19, 2025 and indicated static pressures around 11 Federal Street of 87 psi. During the flow test, hydrants flowed at 1,113 gpm with only an 11 psi drop in pressure, providing a theoretical available flow of 2,954 gpm at 20 psi. Municipal sanitary sewer service is available from the City of Saratoga via the 10” sanitary sewer main in Congress Street, adjacent to the project site. The sewer main runs northeast on Congress Street, eventually discharging to the Saratoga County Sewer District pump station at the intersection of High Rock Avenue and Warren Street. Ultimately the wastewater flows for conveyance and treatment at SCSD’s wastewater treatment plant in Mechanicville. III. Projected Water and Wastewater Flows Anticipated wastewater flows for the project were calculated based on design flows for hotel, apartments, and restaurant/bar space. Condo Units (61 bdrm) (110 gpd/bdrm) 6,710 gpd Hotel Units (120 units) (110 gpd/unit) 13,200 gpd Bar/Restaurant (150 seats) (20 gpd/seat) 3,000 gpd Total 22,910 gpd Average daily flow for wastewater is estimated to be 15.9 gallons per minute (gpm) based on a 24-hour day. Estimated peak hourly flow is 66.78 gpm (4.2 x average).2 Average daily demand for water is estimated to be approximately equal to the wastewater flow or 15.9 gpm. IV. Proposed Water and Wastewater Utilities Proposed Water Utilities To service the building, two separate water connections are proposed to be installed from the municipal water main located in Federal Street. The two services will provide both domestic and fire protection to the building. Connections and appurtenances, including mechanical joints, tees, isolation valves, thrust blocks, trenching, bedding, service connections, as well as testing and disinfection will all be specified in accordance with City of Saratoga Springs and AWWA standards. Proposed Wastewater Utilities Sanitary sewer service will be provided by installing a new 8-inch SDR-26 gravity sewer lateral discharging to the existing 10” Congress Street sewer main. Piping, trenching, bedding, service connections, and testing are specified in accordance with City of Saratoga Springs standards. In addition, a 4,000 gallon grease interceptor will be installed below the parking garage to serve the restaurant kitchen. Notes 1. From Table B-3 NYSDEC Design Standards for Intermediate Sized Wastewater Treatment Systems. 2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q = (18 + P ½) ÷ (4 + P ½) where P = population in thousands 3. From the NYS Plumbing Code, Appendix E based on Water Supply Fixture Units.