Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20260367 624 N Broadway Construction NOD (3)
Page 1 of 1 Tamie Ehinger, Chair Rob DuBoff, Vice Chair Karen Cavotta Karen D’Andrea Leslie DiCarlo Jeff Pfeil Geoff Wood Alison Dockum, Alternate Christina Abele, Alternate CITY OF SARATOGA SPRINGS D ESIGN R EVIEW B OARD ❖ City Hall - 474 Broadway Saratoga Springs, New York 12866 Tel: 518-587-3550 x.2517 www.saratoga-springs.org NOTICE OF DECISION In the matter of the application #20260367 624 N Broadway Construction 624 N Broadway Saratoga Springs, New York 12866 involving Historic review of construction of a four-unit structure within the Urban Residential 4 (UR-4) District, tax parcel #165.44- 1-22, within the City of Saratoga Springs. In accordance with 6 NYCRR Part 617, the Design Review Board classifies this request as a SEQR: Unlisted – Negative Declaration by Design Review Board July 8, 2026 And, in accordance with the objectives, standards and guidelines contained in the Unified Development Ordinance Article 240 - 13.9 Historic Review Applicability and Approval Standards, the Design Review Board issues the following decision on July 8, 2026: Approve the project with the following conditions: Applicant to return with the following for final approval: 1. Depth detail for dormers showing new size to match existing building window widths with lesser height 2. Lighting location and selections 3. Mechanical equipment locations and penetrations 4. Gutter and downspout locations, profiles and details Record of vote: motion to approve made by K Cavotta, seconded by G Wood passed 5-2 In favor: K Cavotta, K D’Andrea, L DiCarlo, J PFeil, G Wood Opposed: T Ehinger, R DuBoff Note: this approval shall expire 18 months from the issuance date unless any necessary building permit has been issued and actual work begun. Please contact the Building Department to verify permit requirements. Chair Received by Accounts cc: Building Department Accounts Dept. Applicant/Agent T/FIRST FLOOR SUBFLOOR 341' - 4 5/8" T/SECOND FLOOR SUBFLOOR 353' - 7" T/ BASEMENT SLAB 331' - 3 1/2" T/ SECOND FLOOR PLATE 363' - 8 1/8" AVERAGE GRADE PLANE 335' - 7 1/4" AVERAGE BUILDING HEIGHT 371' - 10 1/2" 36 3 1 4 LP SMARTSIDE LAP SIDING, 5" EXPOSURE 12" DIA. HB&G PREMACAST TUSCAN COLUMN 10" DIA. HB&G PREMACAST TUSCAN COLUMN 2) 1-1/2" DIA. STEEL PIPE GUARD RAIL ABOVE DECORATIVE RAILING HB&G 6" BALUSTRADE RAILING SYSTEM TRUEXTERIOR POLY ASH TRIM W/ DURATION MILLWORK MOULDINGS MAHOGANY DECKING TRUEXTERIOR POLY ASH TRIM W/ DURATION MILLWORK MOULDINGS FYPON CORBEL BRACKET BKT 11.25X5.75X3.75 CERTAINTEED LANDMARK PRO ASPHALT SHINGLES THIN STONE GRANITE VENEER ON CHIMNEY TRUEXTERIOR 5/4x POLY ASH TRIM AND DURATION MILLWORK MOULDINGS AT WINDOWS AND DOORS. TRUEXTERIOR 5/4x12 POLY ASH SKIRT BOARD ANDERSEN E-SERIES ALUMINUM- CLAD WOOD WINDOWS AND PATIO DOORS 9" 12" 9" 12" 9" 12" 9" 12" 9" 12" 9" 12" 9" 12" 9" 12" SIMPSON STAINED WOOD ENTRY DOOR W/ TRANSOM 0' 2'4'8' 624 North Broadway 07.06.08 Proposed West Elevation SARATOGA SPRINGS . NY T/FIRST FLOOR SUBFLOOR 341' - 4 5/8" T/SECOND FLOOR SUBFLOOR 353' - 7" T/ BASEMENT SLAB 331' - 3 1/2" T/ SECOND FLOOR PLATE 363' - 8 1/8" AVERAGE GRADE PLANE 335' - 7 1/4" AVERAGE BUILDING HEIGHT 371' - 10 1/2" 36 3 1 4 LP SMARTSIDE LAP SIDING, 5" EXPOSURE 12" DIA. HB&G PREMACAST TUSCAN COLUMN 10" DIA. HB&G PREMACAST TUSCAN COLUMN 2) 1-1/2" DIA. STEEL PIPE GUARD RAIL ABOVE DECORATIVE RAILING HB&G 6" BALUSTRADE RAILING SYSTEM TRUEXTERIOR POLY ASH TRIM W/ DURATION MILLWORK MOULDINGS MAHOGANY DECKING TRUEXTERIOR POLY ASH TRIM W/ DURATION MILLWORK MOULDINGS FYPON CORBEL BRACKET BKT 11.25X5.75X3.75 CERTAINTEED LANDMARK PRO ASPHALT SHINGLES THIN STONE GRANITE VENEER ON CHIMNEY TRUEXTERIOR 5/4x POLY ASH TRIM AND DURATION MILLWORK MOULDINGS AT WINDOWS TRUEXTERIOR 5/4x12 POLY ASH SKIRT BOARD ANDERSEN E-SERIES ALUMINUM- CLAD WOOD WINDOWS THIN STONE GRANITE VENEER TRUEXTERIOR 5/4x6 POLY ASH CORNER BOARDS 9" 12" 9" 12" 0' 2'4'8' 624 North Broadway 07.06.08 Proposed South Elevation SARATOGA SPRINGS . NY T/FIRST FLOOR SUBFLOOR 341' - 4 5/8" T/SECOND FLOOR SUBFLOOR 353' - 7" T/ BASEMENT SLAB 331' - 3 1/2" T/ SECOND FLOOR PLATE 363' - 8 1/8" AVERAGE GRADE PLANE 335' - 7 1/4" AVERAGE BUILDING HEIGHT 371' - 10 1/2" 36 3 1 4 LP SMARTSIDE LAP SIDING, 5" EXPOSURE CERTAINTEED LANDMARK PRO ASPHALT SHINGLES TRUEXTERIOR 5/4x POLY ASH TRIM AND DURATION MILLWORK MOULDINGS AT WINDOWS TRUEXTERIOR 5/4x12 POLY ASH SKIRT BOARD ANDERSEN E-SERIES ALUMINUM- CLAD WOOD WINDOWS THIN STONE GRANITE VENEER TRUEXTERIOR 5/4x6 POLY ASH CORNER BOARDS CLOPAY COACHMAN OVERHEAD GARAGE DOORS TRUEXTERIOR POLY ASH TRIM W/ DURATION MILLWORK MOULDINGS FYPON CORBEL BRACKET BKT 11.25X5.75X3.75 NOTE: TWO (2) PROPOSED 3" O4 4" ABS WASTE STACK VENTS (BLACK) TO BE LOCATED ON THIS SIDE OF THE ROOF. NO OTHER ROOF PENETRATIONS ARE ANTICIPATED. 9" 12" 9" 12" 9" 12" 9" 12" 9" 12" 9" 12" 0' 2'4'8' 624 North Broadway 07.06.08 Proposed East Elevation SARATOGA SPRINGS . NY T/FIRST FLOOR SUBFLOOR 341' - 4 5/8" T/SECOND FLOOR SUBFLOOR 353' - 7" T/ BASEMENT SLAB 331' - 3 1/2" T/ SECOND FLOOR PLATE 363' - 8 1/8" AVERAGE GRADE PLANE 335' - 7 1/4" AVERAGE BUILDING HEIGHT 371' - 10 1/2" 36 3 1 4 LP SMARTSIDE LAP SIDING, 5" EXPOSURE 12" DIA. HB&G PREMACAST TUSCAN COLUMN 10" DIA. HB&G PREMACAST TUSCAN COLUMN 2) 1-1/2" DIA. STEEL PIPE GUARD RAIL ABOVE DECORATIVE RAILING HB&G 6" BALUSTRADE RAILING SYSTEM TRUEXTERIOR POLY ASH TRIM W/ DURATION MILLWORK MOULDINGS MAHOGANY DECKING TRUEXTERIOR POLY ASH TRIM W/ DURATION MILLWORK MOULDINGS FYPON CORBEL BRACKET BKT 11.25X5.75X3.75CERTAINTEEDLANDMARKPRO ASPHALT SHINGLES THIN STONE GRANITE VENEER ON CHIMNEY TRUEXTERIOR 5/4x POLY ASH TRIM AND DURATION MILLWORK MOULDINGS AT WINDOWS TRUEXTERIOR 5/4x12 POLY ASH SKIRT BOARD ANDERSEN E-SERIES ALUMINUM- CLAD WOOD WINDOWS THIN STONE GRANITE VENEER TRUEXTERIOR 5/4x6 POLY ASH CORNER BOARDS 9" 12" 9" 12" PROPOSED LOCATION OF GAS AND ELECTRICAL METERS, TO BE CONFIRMED BY NATIONAL GRID 0' 2'4'8' 624 North Broadway 07.06.08 Proposed North Elevation SARATOGA SPRINGS . NY 5/4x6 POLY ASH TRIM, PTD. POLY ASH SILL, PTD. 5/4x4 POLY ASH SKIRT BOARD 5/4x8 POLY ASH TRIM, PTD. 3/4" POLY ASH HALF ROUND TRIM, PTD. POLY ASH CROWN MOULDING, PTD. ALUMINUM DRIP EDGE, WHITE 12" DIA. TUSCAN COLUMN, TYP. POLY ASH MOULDING, PTD. POLY ASH FRIEZE BOARD, PTD. POLY ASH FASCIA, PTD. POLY ASH CROWN MOULDING, PTD. ALUMINUM DRIP EDGE, WHITE 2' 6 7 8 8 3 8 1 2 1 8 8"x8" NEWEL POST, PTD. DECORATIVE RAILING, PTD. 11 2 7 1 4 1 4 1' 5 1 8 12" DIA. TUSCAN COLUMN POLY ASH MOULDING, PTD. POLY ASH FRIEZE BOARD, PTD. POLY ASH CROWN MOULDING, PTD. T&G MAHOGANY DECKING 10" DIA. TUSCAN COLUMN DECORATIVE RAILING, PTD. 1-1/2" DIA. STEEL PIPE RAILING, PTD. 6" ALUMINUM HALF ROUND GUTTER, WHITE METAL DRIP EDGE 1x8 POLY ASH TRIM, PTD. FYPON CORBEL BRACKET BKT 11.25X5.75X3.75 POLY ASH CROWN MOULDING, PTD. 5/4x POLY ASH FRIEZE BOARD, PTD. ASPHALT SHINGLES 624 North Broadway 07.06.08 Exterior Details SARATOGA SPRINGS . NY 1/2" = 1'-0" Typical Window Trim Detail 1/2" = 1'-0" Detail at Entry Canopy Roof 1/2" = 1'-0" Detail at Balcony 1/2" = 1'-0" Detail at Roof Fascia