Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20260654 21 Joseph St Subdivision EAF
Short Environmental Assessment Form Part I - Project Information Part I — Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information_ Complete all items in Part 1. You may also provide any additional information you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part I — Project and Sponsor Information Name of Action or Project: 21 Joseph Street Subdivision Project Location (describe, and attach a location map): 21 Joseph Street, Saratoga Springs, NY 12866 Brief Description of Proposed Action; The subject property is currently improved with a single-family residence that will be demolished prior to redevelopment. The request is to subdivide the property into three parcels to include two, conforming 60-foot-wide residential building lots AND a narrow strip of land (approximately 6 feet wide, extending the full depth of approximately 173 feet), which will be conveyed and merged into the adjoining property at 25 Joseph Street (owned by applicant) and does not constitute a separate building lot_ Name of Applicant or Sponsor: Telephone: 5 1 g_694-2983 Jeffrey Levy E-Mail: Address: 25 Joseph Street City/PO: State: Zip Code. Saratoga Springs New York 12866 1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that be ❑ may affected in the municipality and proceed to Part 2. If No, continue to question 2. 2. Does the proposed action require a permit, approval or funding from any other government Agency? NO YES If Yes, list agency(s) name and permit or approval: Saratoga Springs Planning Board Subdivision Approval ❑ 3. a. Total acreage of the site of the proposed action? .49 acres b. Total acreage to be physically disturbed? .49 acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? 85 acres 4. Check all land uses that occur on, are adjoining or near the proposed action: E] Urban ❑ Rural (non -agriculture) ❑ Industrial ❑ Commercial 0 Residential (suburban) ❑ Forest ❑ Agriculture ❑ Aquatic ❑ Other(Specify): ❑ Parkland Page 1 of 3 SEAF 2026 5. Is the proposed action, a. A permitted use under the zoning regulations? b. Consistent with the adopted comprehensive plan? NO YES NIA ❑ ❑� ❑ ❑ ❑ © 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? NO YES E Ft/1 7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? If Yes, identify:❑ NO YES ❑ S. a. Will the proposed action result in a substantial increase in traffic above present levels? Are public transportation services available at or near the site of the proposed action? c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed action? NO YES ❑ Elb. ❑ El ❑ 9. Does the proposed action meet or exceed the state energy code requirements? If the proposed action will exceed requirements, describe design features and technologies: NO YES 10. Will the proposed action connect to an existing public/private water supply? If No, describe method for providing potable water: NO YES ❑ ❑ 11 _ Will the proposed action connect to existing wastewater utilities? If No, describe method for providing wastewater treatment: YES FNO 12_ a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? NO YES ❑✓ ❑ ❑ 13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain wetlands or other waterbodies regulated by a federal, state or local agency? b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: NO YES R1 ❑ El - Page 2 of 3 SEAF 2026 14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: ❑ Shoreline ❑ Forest ❑ Agricultural/grasslands ❑ Early mid -successional ❑ Wetland ❑ Urban R Suburban 15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or Federal government as threatened or endangered? NO YES 21 1:1 16. Is the project site located in the 100-year or 500-year flood plain? NO YES ✓❑ ❑ 17. Will the proposed action create storm water discharge, either from point or non -point NO YES ❑ 21 sources?If Yes, a. Will storm water discharges flow to adjacent properties? ❑ RI b. Will storm water discharges be directed to established conveyance systems (runoff and stone drains)? R] ❑ If Yes, briefly describe: Existing City of Saratoga Springs infastructure. 18. Does the proposed action include construction or other activities that would result in the impoundment of water or other liquids (e.g., retention pond, waste lagoon, dam)? NO YES If Yes, explain the purpose and size of the impoundment: ❑ ❑ 19_ Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste management facility? If Yes, describe: NO YES 20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or completed) for hazardous waste? NO YES If Yes, describe: 21. Is the project located within, or within 1/2 mile of, a disadvantaged community? NO Z YES ❑ If No, could impacts from the project affect a disadvantaged community? ❑ If Yes to either question in 21, answer the following question. a. Identify the potential pollution impacts of the project, either direct or indirect, that may occur within the disadvantaged community (e.g., wastewater discharges, air emissions, noise, odors, solid or hazardous waste generation or management): I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor/na e: 3effi-ey M. Levy Date: July 30, 2026 Signature: Title: Page 3 of 3 SEAF 2026