HomeMy WebLinkAbout20240588 NYS Route 29 Special Use permit Station Park Mobility 07.24.2026Comments and recommendation on the Station Park application pertaining to traffic impacts, safety and other mobility matters, using the proposed
TIA+ outline.
OUTLINE COMMENT RECOMMENDATION
1. Scoping Meeting
1.1. Meet with OPED staff to a) determine the
limits of the study area, b) discuss the
elements to be studied, and c) whether to
combine the TIA with another proposed
project. The limits of the study area may be
different for different portions of the study.
The applicant is free to make a case for
why a particular element does not need to
be analyzed. The Planning Board Chair will
be the arbiter.
• TBD •
2. Study area map
2.1. Prepare a study area map with streets,
number of travel and turn lanes, sidewalks,
bus stops, bus shelters, bike lanes,
multi/shared-use paths, trails, crosswalks,
and other elements of the transportation
network. This map will provide a basis for
discussion with OPED and before the
Planning Board. A draft should be
prepared for the scoping meeting.
• TIA concerned with intersections along
West Av., and sight distance along
Washington St.
•
2.2. The study area is to include, at a minimum,
all transportation facilities (streets,
sidewalks, pedestrian ramps, bike lanes, bus
stops, etc.) within one-quarter mile of the
site perimeter, and select facilities within
one-half mile of the site perimeter. OPED, in
consultation with other city agencies, will
determine the locations to be analyzed,
and the extent of analysis thereof.
• 2024 TIA studied intersections along West
Av., and sight distance along
Washington St. It did not study the
intersection of Washington St and Kirby
Rd (to the west of the site) nor the
intersections of West Av and Grand St or
West Circular St (to the south of the site).
• 2024 TIA included Tait Lane Reserve,
across the RR tracks from the site. It is
unclear why.
• The applicant should provide a
walking circulation analysis to
demonstrate that people can get
where they want to go without
walking out of their way or across
lawns.
3. City plans
3.1. Describe how the proposed project will
advance goals and specific
recommendations found in city plans
• The project narrative does not contain
the word walking, sidewalk, pedestrian,
bicycle, path, ADA, accessibility, or trail.
• An easement for non-motorized
connections to the train station.
(Comprehensive, Missing Sidewalk Links,
Open Space, Complete Streets, Greenbelt
Trail, etc.).
• The walking and cycling network and
connectivity within the development and
to external destinations (i.e. Greenbelt
Trail ) is not clear.
• A path at the SW corner of the site to
the sidewalk on the Washington St
bridge.
• All streets should be public.
• Coordinate with ongoing CRTC West
Avenue Train Station study.
4. Parking and trips
4.1. Calculate the number of net new parking
spaces: number of new parking spaces
proposed minus the number of existing
spaces to be retained. Minimize the
number of spaces using applicable
exemptions (sharing, on-street, land bank)
found in UDO Section 10.6. Should the
number of net new parking spaces be zero
or below, other sections of the TIA,
especially task 4.2 may not be necessary.
• TBD • On street parking should be
eliminated and all parking placed in
lots or garages. This will permit more
area for trees and landscaping.
4.2. Estimate net new (subtract existing from
total) motor vehicle (MV) trips using best
current practices: the Environmental
Protection Agency’s (EPA) Mixed-Use Trip
Generation Model, the Institute of
Transportation Professionals’ (ITE) Trip
Generation Manual, or a more local source
(for example internal research). Offer
strategies to minimize new external, peak-
hour MV trips through transportation
demand management (TDM). Should the
number of net new trips be zero or below,
other sections of the TIA may not be
necessary.
• 2017 TIS did this.
• 2017 TIS recommended a transportation
demand management plan.
• The proposed development analyzed by
the 2017 TIS recommended a monitoring
and mitigation implementation plan after
phase 2 of the project. This would allow
adjustments should impacts be more
than expected.
• 2017 TIS contained 266 DUs, 5 retail and 2
restaurants. The current proposal is for
390 DUs and no retail or restaurants.
Nonetheless, the estimated peak hour
trips were almost identical: 417 and 419,
respectively.
•
4.3. Estimate net new walking and cycling trips.
Evaluate existing walking and cycling
facilities adjacent with and nearby
proposal and propose improvements to
enhance new walking and cycling trips
(connections to existing paths, crosswalks,
sidewalks).
• Bus stop on Washington St is not be
practical unless there is a signalized
crosswalk.
• A new bus stop within the site for
CDTA’s flex service. But stop to
include shelter, benches, and other
amenities.
4.4. Calculate and show on the study area map
travel times between the project site and
destinations within the city (city hall, library,
local school, dog run, nearest grocery store,
nearest park, bike path…). Calculate for
driving, cycling, and walking, transit using
readily available navigation apps.
• Not done. •
5. Traffic safety
5.1. Summarize any relevant safety analyses
produced within the past five years.
• Not done. •
5.2. Obtain and/or collect motor vehicle speed
data for a representative 24-hour period on
select streets. Calculate the maximum, 85th
percentile, and 50th percentile speeds per
hour.
• 2024 TIA lists 85th percentile speeds along
Washington St at the project site as 47
and 49 mph. The posted speed
transitions from 30 to 45 mph at the east
end of the bridge, where the entrance to
the site will be. It is not clear at what time
of day these speeds were taken, nor the
range of speeds over the course of the
day. There is no discussion about the
safety impacts of these speeds. The
fatality risk for a person hit at these
speeds while crossing from the site to the
shops across the street is about 65%,
https://www.transportation.gov/safe-
system-approach/safer-speeds.
• 2024 TIA lists 85th percentile speeds along
Station Ln as 33 mph. The posted speed
is 30 mph. About 100’ west of the
entrance to the site, Station Ln becomes
a loop at the train station drop-off and
parking lot. It is questionable whether
drivers would be travelling this fast so
near a dead end. There is no information
as to where along the street these
speeds were taken, or at what time of
day. More importantly, this speed is used
to justify the removal of trees to meet
sight distance at the corner.
•
5.3. Assemble 3-year crash data for all users
(pedestrian, bicycle, vehicle, transit) on
select streets. Perform a crash cost analysis
• Not done. •
using the KABCO scale. Present the
Economic Costs, QALY Costs, and
Comprehensive Costs in most recent
dollars. Present crashes per number of
lanes and crashes per average daily traffic
(ADT). Compare crashes to other locations
in the city.
5.4. Perform intersection sight distance analyses
at signalized intersections. Perform gap
and stopping sight distance analyses at
unsignalized intersections, driveways, bus
stops, and other points where people
walking, cycling or driving would be
expected to enter or cross the street.
• 2024 TIA found the site distance
acceptable for drivers.
•
5.5. Propose countermeasures to manage
speeds and reduce crashes without limiting
access for pedestrians and cyclists.
• DPS questioned the number of
crosswalks, citing maintenance costs.
There should be a crosswalk at every leg
of every intersection, plus midblock
crosswalks.
• 2017 TIS recommended against a single-
lane roundabout at West & Washington
based on traffic volumes. It does not
appear safety was considered.
• Crosswalk across Washington.
• Streets within the site should have
traffic calming that limit speeds to 20
mph.
• There should be sidewalks on both
sides of every street.
• 6’ wide sidewalks.
• The peak hour volumes projected
along Station Park Avenue are 139
NB and 93 SB. NACTO recommends
advisory bike lanes for streets with
these volumes (50-150 peak hour per
direction),
https://nacto.org/publication/urban-
bikeway-design-guide/designing-
bikeways-for-all-ages-and-
abilities/bikeways-on-low-speed-low-
volume-streets/advisory-bike-lanes.
6. Traffic volume
6.1. Obtain and/or collect vehicle, transit, truck,
bicycle, and pedestrian volumes for
representative time periods on select streets
and paths.
• 2024 TIA did not collect data nor analyze
traffic at Freeman Ln (the road to Intrada
and USPS). It appears this road will be
connected directly to the site.
• 2024 TIA’s Traffic volumes were collected
in March, which is not a peak month for
• 2024 TIA used a 0.82 historic annual
growth rate (from CRTC) to project
traffic volumes into the future. Based
on this, in 25 years we will have 23%
more traffic. As the city intends to
grow population and economy, but
Saratoga. They do not appear to have
been adjusted seasonally.
• 2017 TIS volumes were seasonally
adjusted.
not car traffic, then a lower rate
should be used.
6.2. Calculate volume to capacity (v/c) ratio
per hour on select streets. Determine the
percentage increase due to the proposed
project.
• 2024 TIA contains v/c ratios.
•
6.3. Perform a queue analysis to determine if
the proposed project will routinely impede
access to surrounding properties.
• Not done. •
6.4. Propose improvements that align with city
plans, and/or make more efficient use of
existing infrastructure. Improvements should
generally not lead to induced vehicle
traffic (roadway widening, new turn lanes),
nor should they fixate on localized peak
hour traffic delays.
• 2017 TIS recommended a southbound
right turn lane on West at Washington.
This would be counter to city goals.
•
• •
7. Data and other information may be found with
the city, county, metropolitan planning
organization (MPO), state, and others identified
by OPED and/or applicant.
• n/a •
• •
8. To ensure transparency, OPED is to be copied
on all correspondence during the review
process between the applicant and other
jurisdictions (NYSDOT, Saratoga County, etc.).
• City not copied on CDTA comments
(20241018 NYS ROUTE 29 PRIME STATION
LANE SITE PLAN CORRESPONDENCE CDTA
FEEDBACK.PDF)
•
Reports & feedback referenced:
• 2024 TIA, 20241018 NYS ROUTE 29 PRIME STATION LANE SITE PLAN TRAFFIC LETTER W ATTACHMENTS.PDF
• Letter from CSAB, 20241018 NYS RT 29 STATION LANE SITE PLAN REVIEW COMPLETE STREETS ADVISORY BOARD LETTER 06.01.2026.PDF
• Comments from DPS, 20241018 NYS ROUTE 29 PRIME STATION LANE SITE PLAN TRAFFIC COMMENTS 11102025.PDF
• Letter from NYS DOT, 20241018 NYS ROUTE 29 PRIME STATION LANE SEQRA RESPONSE LETTER.PDF
• Project narrative, 20241018 NYS ROUTE 29 PRIME STATION LANE SITE PLAN NARRATIVE.PDF
• 2017 TIS, TRANSPORTATION IMPACT STATION PARK 2017.pdf