Loading...
HomeMy WebLinkAbout20260595 359 Ballston Ave Center For the Family Site Plan Engineering Report Engineering Report Water and Sanitary Sewer For Saratoga Center for the Family 359 Ballston Ave SARATOGA SPRINGS, NEW YORK Planning Board #26.XXX Prepared For: Saratoga Center for the Family 359 Ballston Ave Saratoga Springs, NY 12866 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 July 15, 2026 I. Project Description The Saratoga Center for the Family Project involves the construction of a new office building at 359 Ballston Ave, Saratoga Springs, NY 12866. The site is bounded by Ballston Ave to the east and the Railroad Run walking path to the west. II. Existing Water and Sanitary Sewer Utilities Existing Water Utilities Along the project frontage the City of Saratoga Springs municipal water system includes a 14” water main located within Ballston Ave. The existing building on the site is currently served by a 1” water service from the city water main. Existing Sanitary Sewer Utilities The sanitary sewer infrastructure within the project area consists of a 36-inch Saratoga County Sewer District No. 1 (SCSD No. 1) trunk sewer main located west of the project site along the Railroad Run walking path. The sewer main ultimately discharges to the Saratoga County Sewer District No. 1 (SCSD) wastewater treatment plant in Mechanicville. III. Projected Water and Wastewater Flows The proposed office building is expected to accommodate of 6 employees. Based on the employee count, the anticipated wastewater generation rates for the project are summarized in the table below: Description Use Rate Total Use Employees (6 Employees) 15 gpd/Employees1 90 gpd Total 90 gpd Average daily flow for wastewater is estimated to be 0.2 gallons per minute (gpm) based on an 8-hour day. Average daily demand for water is estimated to be approximately equal to the wastewater flow. IV. Proposed Water, Wastewater, and Stormwater Utilities Proposed Water Utilities To serve the proposed building, a 1-inch copper water service is proposed to connect to the existing 1-inch water service that serves the existing building on site. The new water service will provide domestic water supply for the building and its occupants. Connections and appurtenances, including valves, trenching, bedding, service connections, as well as testing and disinfection will all be specified in accordance with City of Saratoga Springs and NYSDOH standards. Proposed Sanitary Sewer Utilities To provide sanitary sewer service to the proposed building, a new 4-inch PVC sewer lateral is proposed to connect to the existing building sewer lateral on site. The lateral will continue to connect to the sanitary manhole northwest of the site. Connections and appurtenances, trenching, bedding, and piping will all be specified in accordance with City of Saratoga Springs and SCSD standards. Notes 1. From Table 1, Appendix 75-A Wastewater Treatment Standards - Residential Onsite Systems (110 gallons per day per bedroom) 2. From Figure 1, GLUMRB Recommended Standards for Wastewater Facilities Q = (18 + P ½) ÷ (4 + P ½) where P = population in thousands