HomeMy WebLinkAbout20260367 624 N Broadway Demoltion & Construction Plans/v. C/RCu/AR STREET
�4-Sr
RFFT
a
3
PROJECT LOCATION MAP
ROJECT
,ITE
41
I
FLUSH
TRANSITION
I
LEGEND
PROPERTY
CONCRETE SIDEWALK
I
j
CONCRETE SIDEWALK —
FLUSH CUP
I
TRANSITION tUF
EXISTING PROPERTY LINE
PROPERTY SETBACK
ASPHALT PAVEMENT
CONCRETE SIDEWALK
q BASEMENT FLOOR OF
PROPOSED BUILDING
F SIDE SETBACK
+ 4.00'
I +
Ilr +
++
I
II
+
+ + +
I +
+ +
+
+ - - -
I I
` 335 I
334 C RR`R SI E S I ETBAC
+ L
I
I
CONCRETE
Rock
GARAGE AT BASEMENT
LEVEL (TYP)
CONCRETE SIDEWALK
STREET
—LOW (24") RETAINING WALLS /
+
r m
'r
i
IASPHALT DRIVEWAY
r I r
I '
r
r
The LA
GROUP
Landscape Architecture
&Engineering P.C.
Peapla. purpose. Place.
40 Long Alley
p: 518-587-8100
Saratoga Springs
518-587-0180
NY 12866
www.thslagroup.com
Unauthorized alteration or addition to this
document is a violation of Section 7209 of the
New York State Education Law.
0 the LA Group 2017
Prepared far.
Crisafulli Associates
21 Computer Drive East
Albany, NY 12205
Date: 06/03/2026 Scale: 1'=10'