HomeMy WebLinkAbout20260426 182 Excelsior Ave Subdivision Application"HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED**
1rUK Urrlur- uJCI
CITY OF SARATOGA SPRINGS
7fi
PLANNING BOARD
tr F
CITY HALL - 474 BROADWAY
SARATOGA SPRINGS, NEW YORK 12866-2296
TEL:'518-587-3550 X2533
www.saratoga-springs.org
APPLICATION FOR:
II PRELIMINARY Jr L FINAL SUBDIVISION
Property Address/Location:
Tax Parcel #: 166. 1 14
182 Excelsior Avenue
(for example: 165.52-4-37)
(Application #)
(Date received)
(Project Title)
Check if PH Required
Staff Review
Zoning District:UR 4 Urban Residential
RR/SR - Conservation Design Required
Total Acres: 2.49 Land to be Subdivided Into: 2 Lots
APPLICANT(S) * OWNER(S) (If not applicant) ATTORNEY/AGENT
Name Green Springs Capital Group, LLC 182 Excelsior Property Owner LLC MJ Engineering, Walt Lippmann
Address PO Box 3207, Saratoga Springs, NY PO Box 3207, Saratoga Springs, NY 1533 Crescent Avenue, Clifton Park, NY
Phone 518 504 7767
518 504 7767 518 371 0799
Email brian@greenspringsholdings.com brian@greenspringsholdings.com wlippmann@mjels.Com
Identify primary contact person: ❑ Applicant ❑ Owner 8 Agent
* An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question.
Has a previous application been filed with PB for this property? NO F-1 YES n
If YES, include Application TYPE final and DATE: 8/2/24
Does any City officer, Does any City officer, employee or family member thereof have a financial interest (as defined by
General Municipal Law Section 809) in this application? YES NO X If YES, a statement disclosing the name,
residence, nature and extent of this interest must be filed with this application.
I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the
Planning Board for the identified property above. I agree to meet all requirements under the Unified Development
Ordinance for the City of Saratoga Springs.
Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property
associated with this a 52Q
n for purposes of con du a necessary site inspections relating to this application.
Applicant Signature: Date: 5/15/26
If applicant is not current owner, owner must also sign.
Owner Signature:
Date:
Application Fee: Make checks payable to the "Commissioner of Finance".
REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT.
Revised 8/2022
Check Citv's wehsite (www_saratnna-snrinns nrn) fnr meetinn rtates
CITY OF SARATOGA SPRINGS
PLANNING BOARD
CITY HALL - 474 BROADWAY
i
-
SARATOGA SPRINGS, NEW YORK 12866-2296
TEL: 518-587-3550 X2533
www.saratoga-springs.org
PRELIMINARY/ FINAL SUBDIVISION APPROVAL
REQUIRED SUBMITTAL CHECKLIST
Checklist Prepared By: ;vN-5" ter% Date:
Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs'
Subdivision Approval (Article 14). The Planning Board reserves the right to request additional information, as
necessary, to support an application. The Board also reserves the right to reject the application if these
minimum requirements are not met. Please complete the checklist below and provide with your submission.
REQUIRED ITEMS: *1 hard copy 1 w/original signature(s), 1 digital copy of ALL materials (all maps, drawings, or
image documents as separate files) and Fee are required.
CHECK EACH ITEM
R1I
.
Completed Subdivision Application E]I a. Conservation Design (Article 16) if required
RI2.
SEQR Environmental Assessment Form- short or long form as required by action.
3.
Set of plans including: (1) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than
I "=50 feet) and (1) 1 1"x 17" copy. One digital version (PDF) of all submittal items printable to Scale
4.
Basic or Full Storm Water Pollution Prevention Plan as required per Article 17 of the UDO.
❑
5. Copy of signed DPW water connection agreement for all projects involving new water
connections to the City system
6.
Engineering Report for Water and Sanitary
7.
Project Cost Estimate for Letter of Credit (utilize City template)
REQUIRED ITEMS ON SUBDIVISION PLAT, AS APPLICABLE:
R1I . Name of Subdivision
2. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey
❑✓ with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original
property survey must also be included.
R13. North arrow and map scale
City of Saratoga Springs Subdivision Checklist 1
Wl4.
Location of proposed home on each lot including finish floor elevation to nearest tenth foot.
F5.
Parcel tax map number
F6.
Site location map (with title block and map key)
7. Site vicinity map (all features within 300 feet of property)
8. Identification of current zoning district with corresponding dimensional standards
Wl9.
Building setback lines shown on plans
10. Title block with subdivision name; name and address of applicant; and name and address of property
owner (if different)
11. Name, address and phone number of subdivision surveyor and/or engineer
12. Names of all adjacent property owners within 300 feet (include both sides of street)
13. Identification of size, material, elevations, and slopes of all existing and proposed utilities within 400 ft
of site.
14. Parcel street address (existing and any proposed postal addresses)
15. Incorporate the City's standard engineering details.
Yes No N/A
✓�
16. Identification of existing or proposed easements, covenants or legal rights -of -way on this property
17. References to all prior variances or special use permits
18. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary
❑ ❑
19. Identification of all watercourses, designated State wetlands, Federal wetlands, buffers, floodplains,
rock outcroppings, etc.
❑ ❑
20. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and
condition)
❑ ❑
21. Location, design specifications and construction material for all proposed site improvements (drains,
culverts, retaining walls, berms, fences, etc.)
El❑✓
22. Location and distance to fire hydrant
23. Erosion and sediment control plan — including designated concrete truck washout area
24. Approximate location, dimensions and areas for proposed lots and proposed public recreational land
25. Proposal for utility systems and lateral connections
Rl26.
Location and width of proposed streets
City of Saratoga Springs Subdivision Checklist
City of Saratoga Springs
OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES - 2026
Application to City Council FEE
Comprehensive Plan Amendment $1,800 + $300/acre
Zoning Ordinance Amendment $800 + $300/acre
Planned Unit Development (PUD) Amendment $800 + $300/acre
Application to Zoning Board of Appeals FEE
Use Variance $1,400 + $75/app
Area Variance - Residential (1 & 2 Family) $350/1st var + $75/app + $150/ea add variance
Area Variance - 3+ Family and Commercial $1,000/1st var + $75/app + $200/ea add variance
Interpretations $650 + $75/app
Post Work Application Fee Application Fee x2 + $75/app
Variance Extensions 50% of Application Fee + $75/app
Demolition
$500
Residential Structures — 1 or 2 Family Principal or Accessory Structure
Materials Change - roof, windows, siding
$75
Fagade Change - removal/addition of windows, doors, porch
$150
Addition or new construction
$300
Approval Extension
50% of Application Fee
3+/Multi-Family, Comm. Mixed -Use Principal or Accessory Structure
Equipment Install or Materials Change - roof, windows, siding, paint color
$150
Signs, awnings
$150
Fagade Change - removal/addition of windows, doors, porch
$300
Addition or new construction
$650
Approval Extension or Modification
50% of Application Fee
Post Work Application Fee
Application x2
to Planning Board
Temporary Use Permit
Special Use Permit - Extension
Special Use Permit - Modification
Site Plan Review- incl. PUD
Sketch Plan
Site Plan Full
Residential
Non -Residential / Mixed -use
Administrative SPR
Residential
Non -Residential / Mixed -use
Extension
Residential
Non -Residential / Mixed -use
Subdivision - incl. PUD
Sketch Plan
Preliminary Approval
Residential: 1-5 Lots
Residential: 6-10 Lots
Residential: 11-20 Lots
Residential: 21+ Lots
Residential - Extension
Final Approval
Residential
Non -Residential
Final Approval Modification
Residential
Non -Residential
Final Approval Extension
Residential
Non -Residential
$500
$400
$550 + $75/app
$400 per sketch
$400 + $250/unit
$800 + $150/1,000 sf (Non -Res) + 250 unit (Res)
$400
$800
$250
$350
$400 per sketch
$700 + $75/app
$1,100 + $75/app
$1,450 + $75/app
$1,800 + $75/app
$350
$1,550 + $200/lot + $75/app
$2,400/lot + $75/app
$400 + $75/app
$800 + $75/app
$250
$350
Subdivisions and Site Plans are subject to Engineering Review- See DPW Fees
Lot Line Adjustment/Subdivision Administrative Action
Letter of Credit — Modification Extension
Letter of Credit - Collection
Recreation Fee
Land Disturbance Activity Permit
WatercourseNVetland Permit
Watercourse/Wetland Permit Extension
SEQRA EIS Review (Draft & Final)
Sidewalk Fee Lieu
Tree Removal
$400
$400
up to 1 % of LoC
$2,000/lot or unit
$750 + $35/acre
$750
$350
TBD
See DPW Fees
Avg. nursery cost in caliper of new species equivalent to
diameter at breat height (DBH of tree(s) Removed