Loading...
HomeMy WebLinkAbout20260426 182 Excelsior Ave Subdivision Application"HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** 1rUK Urrlur- uJCI CITY OF SARATOGA SPRINGS 7fi PLANNING BOARD tr F CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 12866-2296 TEL:'518-587-3550 X2533 www.saratoga-springs.org APPLICATION FOR: II PRELIMINARY Jr L FINAL SUBDIVISION Property Address/Location: Tax Parcel #: 166. 1 14 182 Excelsior Avenue (for example: 165.52-4-37) (Application #) (Date received) (Project Title) Check if PH Required Staff Review Zoning District:UR 4 Urban Residential RR/SR - Conservation Design Required Total Acres: 2.49 Land to be Subdivided Into: 2 Lots APPLICANT(S) * OWNER(S) (If not applicant) ATTORNEY/AGENT Name Green Springs Capital Group, LLC 182 Excelsior Property Owner LLC MJ Engineering, Walt Lippmann Address PO Box 3207, Saratoga Springs, NY PO Box 3207, Saratoga Springs, NY 1533 Crescent Avenue, Clifton Park, NY Phone 518 504 7767 518 504 7767 518 371 0799 Email brian@greenspringsholdings.com brian@greenspringsholdings.com wlippmann@mjels.Com Identify primary contact person: ❑ Applicant ❑ Owner 8 Agent * An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. Has a previous application been filed with PB for this property? NO F-1 YES n If YES, include Application TYPE final and DATE: 8/2/24 Does any City officer, Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES NO X If YES, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. I, the undersigned owner or purchaser under contract for the property, hereby request Subdivision consideration by the Planning Board for the identified property above. I agree to meet all requirements under the Unified Development Ordinance for the City of Saratoga Springs. Furthermore, I hereby authorize members of the Planning Board and designated City staff to enter the property associated with this a 52Q n for purposes of con du a necessary site inspections relating to this application. Applicant Signature: Date: 5/15/26 If applicant is not current owner, owner must also sign. Owner Signature: Date: Application Fee: Make checks payable to the "Commissioner of Finance". REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Revised 8/2022 Check Citv's wehsite (www_saratnna-snrinns nrn) fnr meetinn rtates CITY OF SARATOGA SPRINGS PLANNING BOARD CITY HALL - 474 BROADWAY i - SARATOGA SPRINGS, NEW YORK 12866-2296 TEL: 518-587-3550 X2533 www.saratoga-springs.org PRELIMINARY/ FINAL SUBDIVISION APPROVAL REQUIRED SUBMITTAL CHECKLIST Checklist Prepared By: ;vN-5" ter% Date: Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs' Subdivision Approval (Article 14). The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *1 hard copy 1 w/original signature(s), 1 digital copy of ALL materials (all maps, drawings, or image documents as separate files) and Fee are required. CHECK EACH ITEM R1I . Completed Subdivision Application E]I a. Conservation Design (Article 16) if required RI2. SEQR Environmental Assessment Form- short or long form as required by action. 3. Set of plans including: (1) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than I "=50 feet) and (1) 1 1"x 17" copy. One digital version (PDF) of all submittal items printable to Scale 4. Basic or Full Storm Water Pollution Prevention Plan as required per Article 17 of the UDO. ❑ 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system 6. Engineering Report for Water and Sanitary 7. Project Cost Estimate for Letter of Credit (utilize City template) REQUIRED ITEMS ON SUBDIVISION PLAT, AS APPLICABLE: R1I . Name of Subdivision 2. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey ❑✓ with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original property survey must also be included. R13. North arrow and map scale City of Saratoga Springs Subdivision Checklist 1 Wl4. Location of proposed home on each lot including finish floor elevation to nearest tenth foot. F5. Parcel tax map number F6. Site location map (with title block and map key) 7. Site vicinity map (all features within 300 feet of property) 8. Identification of current zoning district with corresponding dimensional standards Wl9. Building setback lines shown on plans 10. Title block with subdivision name; name and address of applicant; and name and address of property owner (if different) 11. Name, address and phone number of subdivision surveyor and/or engineer 12. Names of all adjacent property owners within 300 feet (include both sides of street) 13. Identification of size, material, elevations, and slopes of all existing and proposed utilities within 400 ft of site. 14. Parcel street address (existing and any proposed postal addresses) 15. Incorporate the City's standard engineering details. Yes No N/A ✓� 16. Identification of existing or proposed easements, covenants or legal rights -of -way on this property 17. References to all prior variances or special use permits 18. Existing and proposed contours and spot grades (at 2 foot intervals) extending to property boundary ❑ ❑ 19. Identification of all watercourses, designated State wetlands, Federal wetlands, buffers, floodplains, rock outcroppings, etc. ❑ ❑ 20. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition) ❑ ❑ 21. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) El❑✓ 22. Location and distance to fire hydrant 23. Erosion and sediment control plan — including designated concrete truck washout area 24. Approximate location, dimensions and areas for proposed lots and proposed public recreational land 25. Proposal for utility systems and lateral connections Rl26. Location and width of proposed streets City of Saratoga Springs Subdivision Checklist City of Saratoga Springs OFFICE OF PLANNING AND ECONOMIC DEVELOPMENT FEES - 2026 Application to City Council FEE Comprehensive Plan Amendment $1,800 + $300/acre Zoning Ordinance Amendment $800 + $300/acre Planned Unit Development (PUD) Amendment $800 + $300/acre Application to Zoning Board of Appeals FEE Use Variance $1,400 + $75/app Area Variance - Residential (1 & 2 Family) $350/1st var + $75/app + $150/ea add variance Area Variance - 3+ Family and Commercial $1,000/1st var + $75/app + $200/ea add variance Interpretations $650 + $75/app Post Work Application Fee Application Fee x2 + $75/app Variance Extensions 50% of Application Fee + $75/app Demolition $500 Residential Structures — 1 or 2 Family Principal or Accessory Structure Materials Change - roof, windows, siding $75 Fagade Change - removal/addition of windows, doors, porch $150 Addition or new construction $300 Approval Extension 50% of Application Fee 3+/Multi-Family, Comm. Mixed -Use Principal or Accessory Structure Equipment Install or Materials Change - roof, windows, siding, paint color $150 Signs, awnings $150 Fagade Change - removal/addition of windows, doors, porch $300 Addition or new construction $650 Approval Extension or Modification 50% of Application Fee Post Work Application Fee Application x2 to Planning Board Temporary Use Permit Special Use Permit - Extension Special Use Permit - Modification Site Plan Review- incl. PUD Sketch Plan Site Plan Full Residential Non -Residential / Mixed -use Administrative SPR Residential Non -Residential / Mixed -use Extension Residential Non -Residential / Mixed -use Subdivision - incl. PUD Sketch Plan Preliminary Approval Residential: 1-5 Lots Residential: 6-10 Lots Residential: 11-20 Lots Residential: 21+ Lots Residential - Extension Final Approval Residential Non -Residential Final Approval Modification Residential Non -Residential Final Approval Extension Residential Non -Residential $500 $400 $550 + $75/app $400 per sketch $400 + $250/unit $800 + $150/1,000 sf (Non -Res) + 250 unit (Res) $400 $800 $250 $350 $400 per sketch $700 + $75/app $1,100 + $75/app $1,450 + $75/app $1,800 + $75/app $350 $1,550 + $200/lot + $75/app $2,400/lot + $75/app $400 + $75/app $800 + $75/app $250 $350 Subdivisions and Site Plans are subject to Engineering Review- See DPW Fees Lot Line Adjustment/Subdivision Administrative Action Letter of Credit — Modification Extension Letter of Credit - Collection Recreation Fee Land Disturbance Activity Permit WatercourseNVetland Permit Watercourse/Wetland Permit Extension SEQRA EIS Review (Draft & Final) Sidewalk Fee Lieu Tree Removal $400 $400 up to 1 % of LoC $2,000/lot or unit $750 + $35/acre $750 $350 TBD See DPW Fees Avg. nursery cost in caliper of new species equivalent to diameter at breat height (DBH of tree(s) Removed