Loading...
HomeMy WebLinkAbout20250900 3 Cobb Alley Construction NOD Page 1 of 1 Tamie Ehinger, Chair Rob DuBoff, Vice Chair Chris Bennett Leslie DiCarlo Jeff Gritsavage Geoff Wood Karen Cavotta Alison Dockum, Alternate Christina Abele, Alternate CITY OF SARATOGA SPRINGS D ESIGN R EVIEW B OARD ❖ City Hall - 474 Broadway Saratoga Springs, New York 12866 Tel: 518-587-3550 x.2517 www.saratoga-springs.org NOTICE OF DECISION In the matter of the application #20250900 3 Cobb Alley Construction 3 Cobb Alley Saratoga Springs, New York 12866 involving Historic review of new construction of a single-family residence with attached two-story, two-car garage within the Urban Residential -3 (UR-3) District, tax parcel # 165.66-2-64, within the City of Saratoga Springs. In accordance with 6 NYCRR Part 617, the Design Review Board classifies this request as a SEQR:  Type II action – exempt from further SEQR review And, in accordance with the objectives, standards and guidelines contained in the Unified Development Ordinance Article 240-13.9 Historic Review Applicability and Approval Standards, the Design Review Board issues the following decision on May 6, 2026:  Approve the plans with the following conditions: Applicant to submit new drawings showing 2/1 windows with specs for windows using real, not simulated light dividers Record of vote: motion to approve made by JGritsavage, seconded by G Wood passed 7-0 In favor: T Ehinger, RDuBoff, CBennett, LDiCarlo, JGritsavage, K Cavotta, G Wood Note: this approval shall expire 18 months from the issuance date unless any necessary building permit has been issued and actual work begun. As a result of this decision, the applicant:  may proceed with the proposed project as approved Please contact the Building Department to verify permit requirements. Chair Received by Accounts cc: Building Department Accounts Dept. Applicant/Agent Outlook RE: DRB - Oravec - 3 Cobb Alley - Revisions From Tonya Yasenchak <tonyay@nycap.rr.com> Date Wed 4/29/2026 12:57 PM To Julia Destino <Julia.Destino@saratoga-springs.org> 1 attachment (157 KB) Final Elev Front Rev 4-29-26.pdf; Hi Julia – Thank you for reaching out. The color rendering is correct in that there will be horizontal siding on the entire lower floor. The entry way and the upper gables will now be LP Smart Side Board & Batten. The Owner has also requested to use Andersen A Series windows (which the DRB approved for the adjacent property at 77 South Franklin). The Owner has also requested a single mullion in the top sash of the DH windows. I will follow up with the material specs. Please let me know if you have any additional questions or if the DRB has any issues that arise during their workshop. Thanks so much. Tonya Y Y ENGINEERING, DPC & ENGINEERING AMERICA CO. Quality Design with Integrity” Tonya Yasenchak, PE 76 Washington St., Saratoga Springs, NY 12866 518 / 587 – 1340 tonyay@nycap.rr.com From: Julia Destino <Julia.Destino@saratoga-springs.org> Sent: Monday, April 27, 2026 3:42 PM To: Tonya Yasenchak <tonyay@nycap.rr.com> Subject: Re: DRB - Oravec - 3 Cobb Alley - Revisions Hey Tonya, I'm reviewing this and do have a quick question - the latest elevation shows vertical siding on the front - on the second-floor gable and on the first floor, horizontal siding between the gables and on the garage. Horizontal siding on all of the other elevations. But the rendering has horizontal siding on part of the first floor of the front. Please confirm which is correct so I can let the Board know during the workshop. Thank you, 4/29/26, 1:00 PM Inbox - Julia Destino - Outlook https://outlook.cloud.microsoft/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AxlDIuR%2FRMEO89B%2FMS6nl%2BQAB2yjXyAAA 1/2 FRONT ELEVATION PROPOSED 9' 1 9' 1 8' 1 7' 7 7' 7 7' 1 CERTAINTEED ARCHITECTURAL SHINGLES LP SMARTSIDE FACIA (SMOOTH) 6" SMARTSIDE CORNERS BRUSHED SMOOTH) LP NICKEL GAP SIDING (SMOOTH) 10" SMARTSIDE TRIM WITH 2" REVEAL (SMOOTH) WOOD BRACKET 10" BASE SMARTSIDE BASE TRIM (SMOOTH) APPROX. GRADE 2nd FLOOR 1st FLOOR CEILING TOP OF WINDOWS 1st FLOOR LEVEL 12"± FOUNDATION REVEAL PELLA WINDOWS LP SMARTSIDE VERTICAL SIDING (BRUSHED SMOOTH) 6" LP SMART SIDE FRIEZE (SMOOTH) LP SMART SIDE FACIA & SOFFIT BRUSHED SMOOTH) 2nd FLOOR CEILING TOP OF WINDOWS 2nd FLOOR 2nd FLR CEILING TOP OF WINDOWS 1st FLOOR CEILING WOOD BRACKETS 1st FLOOR LEVEL LP NICKEL GAP SIDING BRUSHED SMOOTH) 6" LP SMARTSIDE CORNER (SMOOTH) APPROX. GRADE 10" LP SMARTSIDE BASE TRIM (SMOOTH) CONCRETE FOUNDATION REVEAL 8" WOOD COLUMN LP NICKEL GAP SIDING UNDER PORCH BRUSHED SMOOTH) WOOD STEPS 18-0 x 7-0 ALUMINUM GARAGE DOOR WITH GLASS ALONG TOP ONLY NOTE: ELEVATIONS ARE FOR GENERAL VISUAL REFERENCE ONLY AND SHALL NOT BE SCALED FROM FOR ORDERING OR CONSTRUCTION PURPOSES REVISION: 4/13/2026 3 COBB ALLEY ORAVEC: RESIDENCE 6' 7 RIGHT ELEVATION PROPOSED PRIMARY SUITE SLIDING EGRESS WINDOW EGRESS WELL GAS FP VENT GREAT ROOM DINING AREA TOWARDS ALLEY 4x4 WOOD POST WOOD STOOP: 2x6 FJ / 4x4 POST 5/ 4" T&G WOOD DECK 12" ROOF RAKE OVERHANG WITH 6" SMARTSIDE FACIA & SOFFIT FRONT GABLE CANTILEVERED BUMPOUT WOOD BRACKET 1" SQUARE WOOD BALLUSTERS REVISION: 4/13/2026 VERTICAL SIDING ON GABLE BUMPOUT VERTICAL SIDING ON BUMPOUT REAR ELEVATION PROPOSED 9' 1 9' 1 8' 1 7' 7 7' 5 2nd FLOOR CEILING TOP OF WINDOWS 2nd FLOOR LEVEL 1st FLOOR CEILING TOP OF WINDOWS 1st FLOOR LEVEL TOP OF FOUNDATION WOOD RISER & STEPS 2nd FLOOR LEVEL 1st FLOOR CEILING 1st FLOOR LEVEL REVISION: 4/3/2026 11 8 LEFT ELEVATION PROPOSED TOWARDS ALLEY LOFT / DESK NOOK WOOD FRAMED PORCH CONCRETE FOUNDATION REVISION: 4/13/26 24'-0"3'-0" BEDROOM BATH BEDROOM GARAGE WOOD PORCH POST BEYOND GARAGE) BATH