HomeMy WebLinkAbout20260098 56 Duplainville Rd Regeneron Sketch Plan Presentation Traffic 04.27.2026 PowerPointREGENERON – SARATOGA CAMPUS TRAFFIC EVALUATION
Saratoga Springs Planning Board Meeting – April 23, 2026
1
Study Area
Existing Traffic Conditions
Trip Generation
Future Traffic Conditions
Traffic Related Recommendations
LaBella and City Planner Comments
Outline
2
Study Area Intersections
NY Route 50/Geyser Road (CR 43)/Avenue of the Pines
Geyser Road (CR 43)/Cady Hill Boulevard (CR 44)
Cady Hill Boulevard (CR 44)/Adams Road/Old County Road
Rowland Street (CR 47)/Adams Road
Study Area
Study Intersection
Site Access
N
Project
Site
Adams Road
Geyser Road (CR 43)
Rowland Street (CR 47)
Duplainville Road
Cady Hill Blvd
Adams Road
3
Turning Movement Counts (January 13-16, 2026)
AM Peak – 7:00 to 9 a.m.
PM Peak – 4 to 6 p.m.
Hourly Variation – Geyser Road
Automatic Traffic Recorder (January 8, 2026)
10,205 vpd
4
Traffic Forecasts
Future year (2030)
No-Build Traffic Volumes
General Background Growth = 0.5%/year
Other Developments provided by:
City of Saratoga Springs
Town of Milton
Site Trip Generation (1,000 employees in 3 shifts)
Based on rates observed at Regeneron Red Mill Campus
Less than Quad Graphics SEQR approval
Emphasize SEQR Approval
5
Trip Distribution
10%
15%
10%
25%
40%
6
Build Traffic Volumes
7
LOS Definitions
8
Levels of Service
AM Peak Hour PM Peak Hour
9
Study Intersections – LOS Summary
Letter Grade from A to F
Green = LOS A/B
Yellow = C
Orange = D
Red = E/F
Split Circles = Signalized Intersections
Left = Overall Intersection LOS
Right = Worst-Case Approach LOS
Squares = Unsignalized Intersections
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
No-Build Condition
10
Study Intersections – LOS Summary
Letter Grade from A to F
Green = LOS A/B
Yellow = C
Orange = D
Red = E/F
Split Circles = Signalized Intersections
Left = Overall Intersection LOS
Right = Worst-Case Approach LOS
Squares = Unsignalized Intersections
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
Build Condition
AM =
PM =
11
Build Condition
Generally Good LOS
(PM Peak = Worst-Case)
Study Intersections – LOS Summary
Letter Grade from A to F
Green = LOS A/B
Yellow = C
Orange = D
Red = E/F
Split Circles = Signalized Intersections
Left = Overall Intersection LOS
Right = Worst-Case Approach LOS
Squares = Unsignalized Intersections
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
12
Build Condition
LOS A to C with two exceptions
Study Intersections – LOS Summary
Letter Grade from A to F
Green = LOS A/B
Yellow = C
Orange = D
Red = E/F
Split Circles = Signalized Intersections
Left = Overall Intersection LOS
Right = Worst-Case Approach LOS
Squares = Unsignalized Intersections
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
13
Build Condition
LOS D Avenue of the Pines WB (PM peak)
LOS D Old Country Rd WB (PM Peak)
Study Intersections – LOS Summary
Letter Grade from A to F
Green = LOS A/B
Yellow = C
Orange = D
Red = E/F
Split Circles = Signalized Intersections
Left = Overall Intersection LOS
Right = Worst-Case Approach LOS
Squares = Unsignalized Intersections
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
AM =
PM =
14
Geyser Road/Cady Hill Road - Queuing
Average queue does not impact Adams Road
95th percentile queue extends back to Adams Road
Install “Do Not Block Cross Road Sign”
Traffic Findings / Recommendations
15
Traffic Review by LaBella
Letter dated April 14, 2026
Re-evaluated the entire traffic assessment
Background growth
Trip generation
Traffic distribution and assignment
Intersection analysis
Queuing assessment
Determined that the analysis and recommendations provided in the CM letter are acceptable
No additional mitigation identified
Review Comments
16
Traffic Comments by City Principal Planner
Email dated March 5, 2026
Left-Turn Lane on Geyser Road at Cady Hill Boulevard
Adequate LOS and no queuing issues after development
Does not meet AASHTO guidelines
Avoid Geyser Road/Cady Hill Boulevard = More impact to Rowland Street/Adams Road
Adding 0.5 miles to an employee’s commute is a greater impact than increased delay at the signalized intersection – still quicker to go through Cady Hill than around to Rowland St
Review Comments
17
Traffic Comments by City Principal Planner
Email dated March 5, 2026
Sidewalk Connection
Adams Road to Cady Hill Boulevard connection proposed by City has impacts to vegetation, driveways, and wayfinding
Regeneron proposes a connection into Geyser Park Trail Loop which provides similar access
Review Comments
18
Thank You
Creighton Manning Engineering
Project Manager: Mark Nadolny
Presenter: Ken W. Wersted, P.E
mnadolny@cmellp.com
www.cmellp.com
Tel. 518.689.1841
Contact Info