Loading...
HomeMy WebLinkAbout20260091 Lexington Rd & Bemis Heights Rd Subdivision Modification Public Comment (5)Daniel and Maryrose Behan 30 Lexington Road Saratoga Springs, NY 12866 April 19, 2026 To: Saratoga Springs Planning Board Dear Chairman Pingle and Planning Board Members, We have lived at 30 Lexington Road Saratoga Springs for the past 37 years. We enjoy this neighborhood comprised of year-round business owners, professionals, law enforcement, postal workers, schoolteachers- young families as well as re�rees. When we moved here in 1989, we assumed the proposed site for the Lexington Road - Bemis Heights project was forever wild land. Our assump�on seemed to be supported by the fact that local, major, builders passed on this desirable loca�on, while the development in Saratoga throughout the years exploded. Informa�on from some of the original owners that Phase 3 was never developed due to issues with water/wetlands. In 2018 we received a leter from Mr. Curto with his plan to build 4 houses. Subsequently, we atended the Board mee�ng along with other neighbors when the proposed project was on the agenda. The Planning Board Mee�ng provided us with an opportunity to iden�fy our concerns which are as follows:  Zoning  Environmental- Water (flooding), Wetlands  Neighborhood esthe�cs  Traffic  Noise It was our belief that the Board listened to our concerns - we felt heard and that as residents of Saratoga the Board would protect our interests while balancing their role to fairly consider the project. A�er atending the workshop mee�ng on April 16, 2026, it became clear the project would go forward regardless of our substan�ve, ini�al, concerns being addressed. _________________________________________________________________ dbehanjr@gmail.com 518-796-5223 & mrbehan@gmail.com 315-750-0891 Zoning: We believe the board’s reliance on UR-1 zoning is misplaced; Rural Residen�al zoning is the appropriate standard for this review. Because the previously approved Phase 3 project was abandoned and the current proposal shares no significant similari�es with the original plan, the board should treat this as a de novo applica�on subject to updated criteria. If the former city planner made an error in his guidance to Mr. Curto that is an issue for the city to address but should not affect this new project, which we believe should be evaluated under the current RR zoning requirements. We feel it is important to note that there is documenta�on from November 2025 that the neighboring property of Rood and Riddle Equine Hospital, 63 Henning Road was approved under RR requirements. Water/flooding We are very concerned that the addi�on of thirteen homes approved under the UR 1 criteria may have a nega�ve impact on our home with poten�al flooding. We do not believe the proposed 6-inch gravel cleanout drainage will be sufficient to prevent water from backing up in heavy storms. Environmental - Water (flooding), Wetlands Due to proximity to the wetlands, we have been advised that homeowners will be restricted from use of pes�cides. To address this issue, homeowners will have this restric�on in a Restricted Covenant. Although this may be a noble idea to protect wetlands there is absolutely no way to enforce this. The Board’s comments that neighbors helping neighbors with this is not a viable enforcement recommenda�on. The issue of what to do with the dilemma of beaver dams over the long term, is a similar problem. How does maintenance get enforced? Neighborhood esthe�cs – Although we stressed this as a concern for our ability as Saratogians to maintain our property value and the looks of the neighborhood, this was impossible due to the wetland restric�ons. The new proposed homes will not carry a look consistent with the exis�ng homes in the neighborhood. A�er living and paying taxes in Saratoga for 37 years we believe more considera�on should have been given to the Saratoga residents. Fire Code Appendix D107/traffic - There has been no explana�on provided as to why this issue is being ignored or mi�gated with turnarounds that we do not believe is in the best interest of the residents due to safety concerns. The addi�on of 13 homes has the poten�al to add 26 or more vehicles using Lexington Road. This is a safety concern for the residents as well as an inconvenience to current residents due to the difficulty of ge�ng onto Lake Avenue. Noise: While apprecia�ng the noise study, the Northway only gets busier, resul�ng in increased traffic noise. The removal of vegeta�on without replacement or subs�tu�on of sound barriers or sound absorbing materials will only have a nega�ve impact for the homeowners close to this project. Notwithstanding, awareness and focus presented to the Board regarding zoning requirements, environmental review requirements, wetland designa�on, neighborhood esthe�cs, traffic issues, fire code restric�ons, and increasing noise levels, this project con�nues to move forward. We are disappointed with the Planning Board’s review and pending approval of this project as proposed. Please place this leter as part of the permanent record of this project. Should the concerns iden�fied above turn into reality, this record will be used to pursue responsibility from the city for failure to protect our home. Thank you Maryrose and Dan Behan Maryrose and Dan Behan