HomeMy WebLinkAbout20260098 56 Duplainville Rd Regeneron Sketch Plan Supplemental SubmissionC.T. MALE ASSOCIATES
Engineering, Surveying, Architecture, Landscape Architecture & Geology, D.P.C.
50 Century Hill Drive, Latham, NY 12110
518.786.7400 FAX 518.786.7299 www.ctmale.com
Civil Engineering • Environmental Services • Survey Services • Land Services • Architecture •
Energy & Building Systems Services • Electrical Engineering
April 15, 2026 VIA EMAIL & HAND DELIVERY
Susan Barden, Administrator of OPED
City of Saratoga Springs
City Hall
474 Broadway
Saratoga Springs, New York 12866
Re: Regeneron Saratoga Project
Supplemental Submission
56 Duplainville Road
City of Saratoga Springs, Saratoga County, NY
C.T. Male Project No. 25.0998
Dear Susan:
C.T. Male Associates Engineering, Surveying, Architecture, Landscape Architecture &
Geology, D.P.C. (C.T. Male), on behalf of Regeneron Pharmaceuticals, Inc. (Regeneron or
Applicant), is providing this submission to supplement the sketch plan/SEQRA
application currently under review by the Planning Board. The following attachments are
provided, with a brief explanation of each item below:
List of Attachments
Updated Site Master Plan (V3) Attachment 1
No Effect Finding Letter from OPRHP Attachment 2
Updated Site Master Plan (V3) – An updated site master plan is provided and depicts
additional water infrastructure on the east side of the parcel. Two (2) 425,000-gallon
potable process water tanks and a booster pump station are proposed. The purpose of
these tanks is to provide water system redundancy for Regeneron in the event of a water
main failure elsewhere in the County system. This proposal was determined through
recent meetings with the Saratoga County Water Author ity, which is why these tanks
were not shown on the initial site master plan.
The dimensions of each tank will be 33 feet high x 47.5 feet in diameter , each occupying
roughly 2,500 square feet. The booster pump house will be approximately the same
dimensions as the proposed disinfection and water meter building. The tanks will be
constructed on concrete pads. The tanks will be set back approximately 820 feet from
Adams Road and set behind the existing vegetative buffers in this area of the site, which
will minimize visibility from the south. In addition, the proposed overall limit of
C.T. MALE ASSOCIATES
April 15, 2026
Supplemental Submission
Regeneron Saratoga Project
Page - 2
disturbance was increased to encompass this water tank area, adding 0.78± acres to the
total site disturbance. Design plans for this tank system will be submitted, as required, in
future applications to the City.
No Effect Finding Letter from OPRHP – A project consultation was submitted to the NY
State Office of Parks, Recreation and Historic Preservation (OPRHP) to evaluate potential
impacts to historic and cultural resources. The letter provided concludes: “Based upon
this review, it is the opinion of OPRHP that no properties, including archaeological
and/or historic resources, listed in or eligible for the New York State and National
Registers of Historic Places will be impacted by this project.”
Clarification on EV Chargers and Bike Parking – In the March 17, 2026 Planning Board
submission, we addressed the question about proposed EV chargers on the site. To
clarify, Regeneron anticipates having at least 12 EV chargers at the site, including the
four existing chargers. The number of EV chargers will be based on business needs and
other outside requirements. To further clarify the bike parking proposal, Regeneron will
provide covered bike parking near the main entrance of the building and recognizes the
existing bike infrastructure near the site and throughout Saratoga Springs.
Fire Department Comment from March 2, 2026 (Sent via email):
Comment: Will the project be relocating the 2 fire hydrants on the west side of the project
in the area of the proposed parking garage? The plans were not clear on this.
Response: The hydrants are outside the current proposed footprint of the parking garage
and not expected to be relocated. If they need to be relocated, Regeneron will coordinate
changes with the Fire Department and City Building Department. Design plans for the
parking garage will be submitted, as required, in future applications to the City.
Respectfully Submitted,
C.T. MALE ASSOCIATES
Engineering, Surveying, Architecture, Landscape Architecture & Geology, D.P.C.
Chris Koenig
Project Manager
Environmental Services
C.T. MALE ASSOCIATES
April 15, 2026
Supplemental Submission
Regeneron Saratoga Project
Page - 3
Cc: Mark Pingel (Planning Board Chairman)
Regeneron Pharmaceuticals, Inc. (Applicant)
Bruce Steves, Esq. (Applicant’s Counsel)