Loading...
HomeMy WebLinkAbout20250533 26 Finley St Site Plan Response to Comments 04.06.2026April 3, 2026 Susan Barden City of Saratoga Springs Planning Department 474 Broadway, DPW Saratoga Springs, NY 12866 RE: 26 Finley Street Dear Susan: Lansing Engineering is pleased to submit this letter in response to the July 31, 2025 comment letter regarding the above noted project. The following summarizes the comments followed by our response. Comment: DOH Standard is 8" water main instead of 6" Response: The plans have been revised to show an 8" watermain. 2. Comment: The driveway curb cut is larger than the city standards. See SS-13 Response: The project curbcut has been revised to conform to the City commercial driveway standard. 3. Comment: Include ROW Trees Response: The plans have been revised to include ROW trees. 4. Comment: Call out seeding and grading between sidewalk and roadway. Response: The plans have been revised to include seeding and grading between the sidewalks and the roadway. Comment: Use city standards for pipe bollards, M-3. Response: The City standard bollard has been included on sheet DT-7. Comment: A fire hydrant is requested across the street, see attached map. Response: The plans have been have been revised to include a hydrant directly across the street from the development. Finley Street April3, 2026 Attached will be a copy of the revised plan set for your review. If additional information is required, please contact our office at your earliest convenience. Thank you. Sincerely, LANSING ENGINEERING, PC Paul R. Lubera, PE, CPESC CC: file pg. 2