HomeMy WebLinkAbout20190841 Verizon Wireless Communications Facility NOD CITY OF SSPRINGS MARK TO RP EY, Chair
JAM I N TOTI NO, Vice Chair
PLANNING BOARD ROBERT F. BRISTOL
TODD FABOZZI
- , �'` RUTH HORTON
� City Hall - 474 Broadway SARA BOIVIN
' Saratoga Springs, New York 12866
LEXIE BONITATIBUSTel: 518-587-3550 fax: 518-580-9480 AMY RYAN, Alternate
'°RATED www.saratoga-springs.org
S HAW NA J E N KS, Alternate
NOTICE OF DECISION
IN THE MATTER OF THE APPLICATION #2019084 I
VERIZON WIRELESS COMMUNICATIONS FACILITY
25 LAKE AVENUE
SARATOGA SPRINGS, NY 12866
Involving the premises with tax parcel no. 165.52-4-46. 1 , in the City of Saratoga Springs, on an application for a
special use permit for a new telecommunications facility on the roof of an existing building; specifically, a six feet
wide and six feet deep structure placed in the rear corner of the building within a Transect — 6 (T-6) Urban Core
District.
In accordance with 6 NYCRR Part 617, the Planning Board classified this action as a Type I Action, accepted lead
agency status and issued a Negative SEQRA Declaration on September 19, 2019.
Having properly noticed and conducted a public hearing on November 21 , 2019, as required, on the proposed
use;
And, upon evaluation of the application based on the City's enumerated criteria to ensure that the proposed
use(s) will not adversely affect surrounding properties and community character;
And, in accordance with requirements set forth in the City Zoning Ordinance, chapter 240, article 7. I "Special
Use Permit", and article 6.3.2 "Telecommunications Facilities and Towers" the Planning Board issues the
following decision on November 21 , 2019 (passed 6-0-in favor: Totino, Fabozzi, Horton, Boivin, Bonitatibus,
Jenks):
Approve with the following conditions:
• The facility shall be maintained as approved while in use.
• The facility shall meet the "Notice of discontinuance and removal" as required, per 6.3.2 C.
Note: this approval shall expire 18 months from the issuance date unless all conditions have been complied
with and actual work begun.
November 27, 2019 4
Date received by Accounts Chair
cc: Building Dept., Public Works, Public Safety, Accounts Dept., Applicant/Agent, File
Page Iofl