HomeMy WebLinkAbout20260098 56 Duplainville Rd Regeneron Sketch Plan NYSDOT Official SEQR Response 03.09.2026 50 Wolf Road, Albany, NY 12232 │ www.dot.ny.gov March 6th, 2026 Susan Barden, Administrator of Planning Department City of Saratoga Springs Planning Department 474 Broadway Saratoga Springs, NY 12866 Re: Regeneron Saratoga Springs – Duplainville Road 56 Duplainville Road Saratoga Springs, NY 12866 Dear Susan: The New York State Department of Transportation has reviewed the SEQR documentation received per the correspondence dated February 23rd, 2026, and offers the following: 1. The NYSDOT acknowledges the Saratoga Springs Planning Board will be designated as the Lead Agency for this environmental review. NYSDOT believes we are an Interested agency under SEQR. 2. This project proposes to redevelop the vacant “Quad Graphics” facility for use as a Regeneron pharmaceutical production facility. The project is an infill/redevelopment project and will include upgrades to existing mechanical equipment, utilities, sanitary sewer systems, water mains, on-site water tanks, trash compactors, bulk chemical and gas storage, additional sidewalks and covered walkway, cooling towers, electrical transformers, pipe racking, removal of a rail spur, site driveway improvements including a security gate, emergency generators and a newly constructed parking garage. The project plans to increase impervious surface by ~0.6 acres and 12.9/62.1 acres will be physically disturbed. The area of the project is zoned as “General Industrial” (IND-G), which is intended to “accommodate light industrial, warehouse, and related business uses in areas where the intensity of the uses will have minimum adverse impacts on neighboring uses” (City Code, 240-6.1B). This project is redeveloping an existing property within W.J. Grande Industrial Park and well aligns with the permitted zoning uses and existing land use. This project also compliments and furthers the City of Saratoga Spring’s 2015 Comprehensive Plan. Regarding economic stability, two guiding principles highlighted are “to encourage development that benefits our tax base and is based on sustainable concept” and to foster job growth by retaining businesses and attracting new businesses within the city” (pg. 13). This project accomplishes both goals as the new facility will foster job growth by attracting a new business and promote sustainable growth as a redevelopment project. Additionally, the “adaptive reuse of vacant buildings and infill” (pg.15) is specifically mentioned as a recommended action to further these guiding principles and that reoccupation of vacant buildings should be promoted (pg. 48). 3. Although this redevelopment is consistent with zoning law and helps support the city’s comprehensive plan, there are some areas for improvement that can help further additional city goals such as safety, sustainability, multi- modal transportation, and accessibility. Please see below suggestions for the city’s consideration: a. Currently, 419 parking spaces are required for the project and there are 839 existing spaces. This project proposes increasing this to 1,493 parking spots, through the addition of a new parking garage. This is more than 3.5x the required amount and parking should be reduced in non-garage areas. This space can be converted to green space, recreational space, or communal space for Regeneron and would better support sustainability initiatives and reduce impervious surface. b. Installation of a striped pedestrian crossing from the parking garage to nearest building entrance. c. Installation of EV charging stations within the parking garage and potentially at other main parking areas (Comprehensive Plan, pg. 28). d. Installation of bike racks within the proposed parking garage and at the main entrances to the facility. (Comprehensive plan, pg. 33). e. Installation of pedestrian scale, energy-efficient, and “dark sky” style lighting to improve energy efficiency and reduce light pollution (Comprehensive Plan, pg. 28). f. Consider converting the currently striped island bump outs at the existing SE parking lot to hardscaped bump outs. This will induce traffic calming and improve safety. g. Consider installation of a bike “fix-it” station within the parking garage or near the recreation facilities to the East of the building (Comprehensive Plan, pg. 33). h. Consider installation of a pedestrian path/network surrounding the facility for improved connectivity, accessibility, and safety for those moving outside the facility. i. Consider installation of roof solar energy infrastructure on the existing building as well as on the proposed parking garage roof. This is well supported by the energy goals of the comprehensive plan (pg. 28). 4. NYSDOT received an EAF, Expanded EAF, Sketch Plan Application, Sketch Plan On-Site Noticing, Sketch Plans, and a Lead Agency Request on February 24th, 2026, by Susan Barden. 5. Please note that NYSDOT does not allow new development to directly discharge stormwater into the highway stormwater management system. 6. A NYSDOT Highway Work Permit (PERM 33-com) will be necessary for any work within the State right-of-way. 7. In anticipation of the Highway Work Permit, a Traffic Impact Study may be required. 8. A PERM 32 NYSDOT permit application will be required for any utility work in the NYSDOT right-of-way. Please submit documentation the Town will take ownership of any proposed utilities in NYSDOT right-of-way. If you have any questions pertaining to the Utility Permit process or requirements, please contact Matt Haggerty at Matt.Haggerty@dot.ny.gov or (518) 461-3669. For questions about the Highway Work Permit process and requirements, contact Wyatt Martin, Regional Permit Engineer (Wyatt.Martin@dot.ny.gov or 518-457-4745). Sincerely, Greg Wichser, P.E. Regional Program and Planning Manager cc: Wyatt Martin, Region 1 Traffic Matt Haggerty, Region 1 Construction Paul Korowajczyk, Resident Engineer, Saratoga County Brian Sleasman, Region 1 Design