HomeMy WebLinkAbout20251051 162 Circular St. RISE Exterior Modifications Plans (2)ACCESACOUSAC TAD
ADJAFF
ALTALUMANOD
ASPHASSOC
BALC
B/CBDBETBLDGBLKGBM(S)BOTBRGBRKBRKTBSMT
BUS
CCAB
CBCICJ
CLGCLLCLOSCLRCMUCOCOLCONCCOND
CONNCONSTCONTCONTRCOORDCORRCPTCRSCTCWCWR
ACCESSIBLE
ACOUSTICAL CEILING TILEAREA DRAIN, ACCESS DOOR
ADJACENTABOVE FINISHED FLOOR
ALTERNATEALUMINUMANODIZED FINISH
ASPHALTASSOCIATED
BALCONY
BOTTOM OF CURBBOARDBETWEENBUILDINGBLOCKINGBEAM(S)BOTTOMBEARINGBRICKBRACKETBASEMENT
BUSINESS
CONDUITCABINET
CATCH BASINCAST IRONCONTROL JOINT
CEILINGCONTRACT LIMIT LINECLOSETCLEAR(ANCE)CONCRETE MASONRY UNITCLEAN OUTCOLUMNCONCRETECONDENS(ATE, ER, ING, ATION)
CONNECTIONCONSTRUCTIONCONTINU(OUS, ATION)CONTRACTORCOORDINATECORRIDORCARPETCOURSECERAMIC TILECOLD WATERCHILLED WATER RETURN
ACOUSTICAL
D
DBLDEMODEPTDETDFDIDIADIAGDIMDISP
DLDNDOMDRDWDWG
EA
EFEHDEIFSEJELELECELEVEMERENCLEPEPDM
EQEQPTETRETRDETRLEW
EWCEXHEXISTEXPEXT
FAIFBFDFDNFEFECFFFHFIN
FL, FLRFLUOR
FO
FOBFOCFOUND
FPWHF.R.P.FRT
DRAIN
DOUBLEDEMOLISHDEPARTMENTDETAILDRINKING FOUNTAINDUCTILE IRON, DROP INLETDIAMETERDIAGONALDIMENSIONDISPENSER
DEAD LOADDOWNDOMESTICDOORDISHWASHERDRAWING
EACH
EXHAUST FANELECTRIC HAND DRYEREXTERIOR INSULATION & FINISH SYSTEMEXPANSION JOINTELEVATIONELECTRICALELEVATOREMERGENCYENCLOS(E, SURE)ELECTRICAL PANEL BOARDETHYLENE PROPYLENE DIENE MONOMER
EQUALEQUIPMENTEXISTING TO REMAINEXISTING TO BE REMOVEDEXISTING TO BE RELOCATEDEACH WAY
ELECTRIC WATER COOLEREXHAUSTEXISTINGEXPOSEDEXTERIOR
FRESH AIR INTAKEFOILBACKEDFLOOR DRAIN, FIRE DAMPERFOUNDATIONFIRE EXTINGUISHERFIRE EXTINGUISHER CABINETFINISHED FLOORFIRE HYDRANTFINISH(ED)
FLOORFLUORESCENT
FIBER OPTIC
FACE OF BRICKFACE OF CONCRETEFOUNDATION
FREEZE PROOF WALL HYDRANTFIBERGLASS REINFORCED PLASTICFIRE RETARDANT TREAT(ED, MENT)
GGA
GALV
GL
GWBGYP
HBHC
HDR
HDWD
HMHORHPHRHTHTGHTRHVAC
HWHWR
IDIN
INCANINSULINTINV
JBJCJT
L
LABLAMLAV
LINLLLLHLLVLP
GASGAGE
GALVANIZED
GLASS/GLAZING
GYPSUM WALL BOARDGYPSUM
HOSE BIBBHOLLOW CORE
HEADERHARDWAREHARDWOOD
HOLLOW METALHORIZONTALHIGH POINTHANDRAIL/HOURHEIGHTHEATING
HEATING, VENTILATING,
HOT WATERHOT WATER RETURN
INSIDE DIAMETERINCH
INCANDESCENTINSULAT(E, D, ION)INTERIORINVERT
JUNCTION BOXJANITOR'S CLOSETJOINT
LENGTH, LONG (STRUCTURAL SHAPEANGLE IN THE CONTEXT OF
LABORATORYLAMINATE(D)LAVATORY
LINOLEUMLIVE LOADLONG LEG HORIZONTALLONG LEG VERTICALLOW POINT (LOW PRESSURE INTHE CONTEXT OF HVAC DRAWINGS)
HEATER
HDW
MC
MECHMEMB
MFRMHMICROW
MIN
MOMTDMTGMTL
NNIC
NOMNTS
OAOCOD
OHOPGOPPOZ
PPB
PCCPDPHPILPLPLAM
PLASPLMBG
PSFPSI
PTPTNPVC
STRUCTURAL SHAPE MISCELLANEOUSCHANNEL IN THE CONTEXT OF
MECHANICALMEMBRANE
MANUFACTURERMANHOLEMICROWAVE OVEN
MINIMUM OR MINUTES
MASONRY OPENINGMOUNTEDMOUNTINGMETAL
NORTHNOT IN CONTRACT
NOMINALNOT TO SCALE
OVERALLON CENTEROUTSIDE DIAMETER
OVERHEADOPENINGOPPOSITEOUNCE
POLEPULLBOX
PRECAST CONCRETEPRESSURE DROPPHASEPILASTERPLATEPLASTIC LAMINATE
PLASTERPLUMBING
POUNDS PER SQUARE FOOTPOUNDS PER SQUARE INCH
PRESSURE TREATEDPARTITIONPOLYVINYL CHLORIDE
QTQTY
SCSCHED
SECTSFSG
SHTSIMSOGSPSPEC
SQ
SS
STDSTLSTORSTRUCTSUSP
TT/T&BT>CT/C
TELTEMPTERR
THDTHKTHR
TOILTOSTOW
TS
T/STVTYP
UCUGUHULUNFINUNOUPSUTIL
VBVCTVERTVESTVIFVJVTVTRVWC
W/DWW/W/OW
WCWD
WR
WSCTWTWWF
QUARRY TILEQUANTITY
SOLID CORESCHEDULE(D)
SECTIONSQUARE FEETSAFETY GLASS
SHEETSIMILAR(CONCRETE) SLAB ON GRADESUMP PUMPSPECIFICATIONS
SQUARE
STAINLESS STEEL, SANITARY SEWER
STANDARDSTEELSTORAGESTRUCTURALSUSPENDED
TREADTOP OFTOP & BOTTOMTONGUE AND GROOVETERNE COATEDTOP OF CURB
TELEPHONETEMPERATURETERRAZZO
THREAD(ED)THICK(NESS)THRESHOLD
TOILETTOP OF SLABTOP OF WALL
STRUCTURAL TUBULAR STEEL IN THECONTEXT OF STRUCTURAL DRAWINGSTOP OF STEELTELEVISIONTYPICAL
UNDERCUTUNDERGROUNDUNIT HEATERUNDERWRITERS LABORATORIESUNFINISHEDUNLESS NOTED OTHERWISEUNINTERRUPTABLE POWER SUPPLYUTILITY
VAPOR BARRIERVINYL COMPOSITION TILEVERTICALVESTIBULEVERIFY IN FIELDAESTHETIC "V" JOINTVAPOR TIGHTVENT THROUGH ROOFVINYL WALL COVERING
WASHER/DRYERWIDE, WIDTH, WATERWITHWITHOUTSTRUCTURAL SHAPE WIDE FLANGE INTHE CONTEXT OF STRUCTURAL DRAWINGSWATER CLOSETWOOD
WATER RESISTANT
WAINSCOTWEIGHTWELDED WIRE FABRIC
STRUCTURAL DRAWINGS)
STRUCTURAL DRAWINGS/
CAT CATALOG
I.E.THAT IS
NO #NUMBER
ST STORM SEWER
T/F TOP OF FRAME
ROUNDRND
RECESSED PAPER TOWELROUGH OPENINGRPTDDRO
REFRIGERAT(OR, ANT, ATION)
REINFORCED CONCRETE PIPERISER, RADIUSR
RELOCATED EXISTING
RESILIENTREQUIREDREINFORCE(ED, MENT)REFLECTED
ROOF DRAIN
RMRLE
RESILREQDREINF
ROOM
RD
REFLREFG
RCP
ADDITIONALADD'L.
AIR HANDLING UNITAHU
APPROXIMATEAPPROXARCHARCHITECT(URE,URAL)
BOTTOM OFB/
CL CENTER LINE
CONFERENCECONF
DA DOUBLE ACTING
DIVISIONDIV
ELECTRICAL CONTRACTOREC
FIXTUREFIX
FEMININE NAPKIN VENDERFNDFNVFEMININE NAPKIN DISPOSAL
FURNISH, FURNITUREFURRING, FURREDFOOTINGFEET, FOOTFTFTG
FURNFUR
GAL GALLON
GRAB BARGBGENERAL CONTRACTORGC
GROUNDGND
HIGHH
HEAVY DUTYHD
HARDWAREHDWR
INFO INFORMATION
KPL KICKPLATE
LEFT HAND REVERSELEFT HAND(ED)LINEAR FOOTLF
LHRLH
LOUVERLVR
MACHINEMACH
MASONRYMASMATERIALMAT
MEZZANINEMEZZ
MILLIMETER(S)MIL
MIRRORMIRMOULDINGMLD
MECHANICAL CONTRACTOR
PLUMBING CONTRACTORPC
PANELPNLPAINT(ED)POLYISOCYANURATEPOLYPNT
PLYWD PLYWOOD
RIGHT HAND REVERSERHRRIGHT HANDRH
ROOF TOP UNITRECESSED SOAP DISPENSERRTURSDDISPENSER AND DISPOSAL
RIGHT OF WAYROW
SOAP DISPENSERSD
SEMI-RECESSEDSR
SHEET VINYLSV
THROUGHTHRU
TOILET PAPER HOLDERTPH
VINYLV
WATERPROOF / WORKING POINTWP
WATER RESISTANT TILE BACKER BOARDWRTBB
CAFETERIACAFET
BUILT-UP ROOFBUR
EPAINT EPOXY PAINT
TECHNOLOGYTECH
SYNTH SYNTHETIC
SH STUDY HALL
OFF OFFICE
MAINT MAINTENANCE
FOLDING PARTITION WALLFPW
PREFIN PREFINISHED
AND AIR CONDITIONING
ABBREVIATIONS
STONE (CUT OR CAST)
FINISH WOOD
GYPSUM WALLBOARD OR GROUT
STEEL
BATT INSULATION
EARTH
PLYWOOD
ROUGH WOOD BLOCKING
CONCRETE MASONRY UNITS
CONCRETE
MATERIAL INDICATIONS
GRANULAR FILL
RIGID INSULATION
(OR NEW WALL ON FLOOR PLANS ONLY)
INDICATORS
1i
1i
101
A101
1 Ref
1Re
f
1 Ref
1Re
f
A101
1
Ref
1Re
f 1 Re
f
1
Ref
EXTERIOR
ELEVATION
INTERIOR ELEVATION
SECTION
DOORS
WALL TYPES
STOREFRONT TYPES
DRAWING LIST
S100 SITE PLAN
ARCHITECTURAL
T100 COVER SHEET & GENERAL INFORMATION
D100 BASEMENT DELOITION PLAN
D101 FIRST & SECOND FLOOR DEMOLITION
PLAN
A100 BASEMENT FLOOR PLAN
A101 FIRST FLOOR PLAN
A102 SECOND FLOOR PLAN
A103 GARAGE PLAN
A200 EXTERIOR ELEVATIONS
A201 EXTERIOR ELEVATIONS
A400 REFLECTED CEILING PLANS
A600 ENLARGED PLANS & DETAILS
Se
a
l
Pr
o
j
e
c
t
N
a
m
e
Dr
a
w
i
n
g
T
i
t
l
e
Pr
o
j
e
c
t
N
o
.
Pr
i
n
t
D
a
t
e
CO
N
T
R
A
C
T
O
R
S
H
A
L
L
V
E
R
I
F
Y
A
L
L
D
I
M
E
N
S
I
O
N
A
T
S
I
T
E
,
U
N
A
U
T
H
O
R
I
Z
E
D
A
L
T
ER
A
T
I
O
N
S
OR
A
D
D
I
T
I
O
N
S
T
O
T
H
I
S
D
O
C
U
M
E
N
T
I
S
A
V
I
O
L
A
T
I
O
N
O
F
T
H
E
N
E
W
Y
O
R
K
S
T
AT
E
ED
U
C
A
T
I
O
N
L
A
W
.
De
s
i
g
n
e
d
Dr
a
w
n
Ch
e
c
k
e
d
St
a
t
u
s
Da
t
e
Drawing No.
WW
W
.
R
E
4
O
R
M
A
R
C
H
I
T
E
C
T
UR
E
.
C
O
M
32
3
C
L
I
N
T
O
N
ST
R
E
E
T
SC
H
E
N
E
C
T
A
D
Y
,
N
Y
12
3
0
5
P:
5
1
8
.
3
9
9
.
4
1
7
4
F:
5
1
8
.
3
9
9
.
4
1
0
5
2/
1
8
/
2
0
2
6
9
:
5
0
:
4
6
A
M
LH
K
LH
K
CH
E
C
K
E
R
DR
B
SU
B
M
I
T
2/
1
8
/
2
6
CO
V
E
R
S
H
E
E
T
&
G
E
N
E
R
A
L
IN
F
O
R
M
A
T
I
O
N
NU
M
B
E
R
Ri
s
e
-
M
i
l
e
s
t
o
n
e
M
a
n
o
r
Re
n
o
v
a
t
i
o
n
T100
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
SA
R
A
T
O
G
A
S
P
R
I
N
G
S
,
N
Y
1
2
8
6
6
Rise - Milestone Manor Renovation
162 CIRCULAR STREET
SARATOGA SPRINGS, NY 12866
NO
DE
S
C
R
I
P
T
I
O
N
DA
T
E
ARCHITECT:OWNER:
MECHANICAL/ELECTRICAL
ENGINEER:
RE4ORM ARCHITECTURE
323 CLINTON STREET
SCHENECTADY, NY 12306
RISE HOUSING & SUPPORT SEVICES
127 UNION STREET
SARATOGA SPRINGS, NY 12866
ENGINEERED SOLUTIONS
646 PLANK ROAD SUITE 104
CLIFTON PARK, NY 12065
DRAWING LIST
ELECTRICAL
E000 LEGEND SCHEDULES GENERAL NOTES
MECHANICAL
M000 HVAC LEGENDS, SYMBOLS, & NOTES
PLUMBING
P1 PLUMBING
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
S
I
T
E
P
L
A
N
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
,
C
I
T
Y
O
F
S
A
R
A
T
O
G
A
S
P
R
I
N
G
S
,
S
A
R
A
T
O
G
A
C
O
U
N
T
Y
,
N
E
W
Y
O
R
K
LA
N
S
I
N
G
E
N
G
I
N
E
E
R
I
N
G
P
R
E
L
I
M
I
N
A
R
Y
/
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
24
5
2
S
T
A
T
E
R
O
U
T
E
9
S
U
I
T
E
3
0
1
MA
L
T
A
,
N
Y
1
2
0
2
0
(5
1
8
)
8
9
9
-
5
2
4
3
CI
V
I
L
-
T
R
A
N
S
P
O
R
T
A
T
I
O
N
-
E
N
V
I
R
O
N
M
E
N
T
A
L
-
L
A
N
D
S
U
R
V
E
Y
I
N
G
EXISTING CONDITIONS & DEMOLITION PLAN
LAYOUT, MATERIALS, & GRADING PLAN
SITE STATISTICS
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
S
I
T
E
P
L
A
N
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
,
C
I
T
Y
O
F
S
A
R
A
T
O
G
A
S
P
R
I
N
G
S
,
S
A
R
A
T
O
G
A
C
O
U
N
T
Y
,
N
E
W
Y
O
R
K
LA
N
S
I
N
G
E
N
G
I
N
E
E
R
I
N
G
P
R
E
L
I
M
I
N
A
R
Y
/
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
24
5
2
S
T
A
T
E
R
O
U
T
E
9
S
U
I
T
E
3
0
1
MA
L
T
A
,
N
Y
1
2
0
2
0
(5
1
8
)
8
9
9
-
5
2
4
3
CI
V
I
L
-
T
R
A
N
S
P
O
R
T
A
T
I
O
N
-
E
N
V
I
R
O
N
M
E
N
T
A
L
-
L
A
N
D
S
U
R
V
E
Y
I
N
G
ASPHALT PAVEMENT DETAIL1
2 SCREEN FENCING DETAIL
CONCRETE SIDEWALK DETAIL1
EX
I
S
T
I
N
G
G
A
R
G
A
R
E
R
E
L
O
C
A
T
E
D
+/
-
1
9
'
-
0
"
V
I
F
5'
P
R
O
P
E
R
T
Y
S
E
T
B
A
C
K
7' - 4"3' - 4"
EX
I
S
T
.
O
.
H
.
D
O
O
R
O
P
E
N
I
N
G
EX
I
S
T
.
O
.
H
.
D
O
O
R
O
P
E
N
I
N
G
G01G02
G05
G06
G06
G06
G06
G08
G08
2
1
1
2
2
22
G04
3 1/2"
4' - 0"
2
G09
A1033
A103
4
5
A103
G102
G101
G-
E
2
G-
E
3
ATTIC
ACCESS
G101
MULTIPURPOSE
ROOM
G100
G12
G12
G12
G12
G12
G01
G01
G01
2'
-
0
"
7' - 7 1/4"
G15
G06 G07
G04
G10
G10
G04
G06
G08
G11
G13
G16
G14
G06
G01
G02
G04
G10
G16
4'
-
0
"
8"
NEW CONCRETE
FOUNDATION
WALLS &
FOOTINGS
8"
1' - 4"
8"
4"
EXISTING
GARAGE
RELOCATED
NEW 4" THICK
CONCRETE STEM WALL
NEW P.T. WOOD SILL
(INSTALL WHILE GARAGE IS
STILL ON CRIBBING)
INSTALL NEW FIBERGLASS
BATT INSULATION IN
EXISTING EXTERIOR WALLS
& 2ND FLOOR FRAMING.
PROVIDE 5/8" GYPSUM WALL
BOARD ON ALL INTERIOR FACES
OF EXTERIOR WALLS, CEILING,
CENTER BEAM & COLUMNS.
REMOVE EXISTING SHINGLES
AND REPLACE WITH NEW
FIBERGLASS ARCHITECTURAL
SHINGLES TO MATCH NEW
SHINGLES BEING INSTALLED
ON THE MAIN HOUSE
G102
INTERIOR PARTITION
4 3/4"
1
5/8'' GWB
5/8"3 1/2"5/8"
5/8'' GWB
GWB CEILING
EXISTING
STRUCTURE
(2) 2x4 TOP PLATE
2x4 BOTTOM PLATE
2x4' WD STUDS
@ 16'' O.C.
INTERIOR PARTITION
EXISTING WALL NEW GWB
2
5/8'' GWB
5/8'' GWB
EXISTING
STRUCTURE
GWB CEILING
5/8'' GWB
EXISTING WALL
EXISTING WALL
EXISTING WALL
EXIST 5/8"
5
A103
1
WOOD
SEE DOOR SCHEDULE
2
H.M.
SE
E
D
O
O
R
S
C
H
E
D
U
L
E
SEE DOOR SCHEDULE
SE
E
D
O
O
R
S
C
H
E
D
U
L
E
SE
E
D
O
O
R
S
C
H
E
D
U
L
E
SE
E
D
O
O
R
S
C
H
E
D
U
L
E
SEE DOOR SCHEDULE
5
WOOD
BI-FOLD
PANELED
DOOR
4
WOOD
DUTCH DOOR
SE
E
D
O
O
R
S
C
H
E
D
U
L
E
SEE DOOR SCHEDULE
3'
-
2
"
PANELED
DOOR
3
WOOD
SE
E
D
O
O
R
S
C
H
E
D
U
L
E
SEE DOOR SCHEDULE
PANELED
DOOR
Se
a
l
Pr
o
j
e
c
t
N
a
m
e
Dr
a
w
i
n
g
T
i
t
l
e
Pr
o
j
e
c
t
N
o
.
Pr
i
n
t
D
a
t
e
CO
N
T
R
A
C
T
O
R
S
H
A
L
L
V
E
R
I
F
Y
A
L
L
D
I
M
E
N
S
I
O
N
A
T
S
I
T
E
,
U
N
A
U
T
H
O
R
I
Z
E
D
A
L
T
ER
A
T
I
O
N
S
O
R
A
D
D
I
T
I
O
N
S
T
O
T
H
I
S
DO
C
U
M
E
N
T
I
S
A
V
I
O
L
A
T
I
O
N
O
F
T
H
E
N
E
W
Y
O
R
K
S
T
A
T
E
E
D
U
C
A
T
I
O
N
L
A
W
.
De
s
i
g
n
e
d
Dr
a
w
n
Ch
e
c
k
e
d
St
a
t
u
s
Da
t
e
Drawing No.
OF
WW
W
.
R
E
4
O
R
M
A
R
C
H
I
T
E
C
T
U
R
E
.
C
O
M
32
3
C
L
I
N
T
O
N
S
T
R
E
E
T
SC
H
E
N
E
C
T
A
D
Y
,
N
Y
12
3
0
5
P:
5
1
8
.
3
9
9
.
4
1
7
4
F:
5
1
8
.
3
9
9
.
4
1
0
5
2/
1
8
/
2
0
2
6
9
:
5
0
:
3
7
A
M
LH
K
LH
K
Ch
e
c
k
e
r
DR
B
SU
B
M
I
T
2/
1
8
/
2
6
GA
R
A
G
E
P
L
A
N
NU
M
B
E
R
Ri
s
e
-
M
i
l
e
s
t
o
n
e
Ma
n
o
r
R
e
n
o
v
a
t
i
o
n
A103
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
SA
R
A
T
O
G
A
S
P
R
I
N
G
S
,
N
Y
1
2
8
6
6
1/4" = 1'-0"1 GARAGE FLOOR PLAN
ROOM FINISH SCHEDULE - GARAGE
ROOM NO.ROOM NAME
FLOOR BASE WALL CEILING
REMARKSMAT'L FINISH MAT'L FINISH MATERIAL FINISH MAT'L FINISH
G100 MULTIPURPOSE ROOM CONC LVT NEW VINYL GWB PAINT GWB PAINT
G101 ATTIC ACCESS CONC -NEW VINYL GWB PAINT --
DOOR SCHEDULE - GARAGE
DOOR
NO.
ROOM NAME DOOR FRAME
LABEL HDW SET CommentsFROMTO
SIZE Door
Type MAT'L FINISH MAT'L FINISHWHTTHK
G101 3' - 0"6' - 8"0' - 1 3/4"1 WOOD PAINT WOOD PAINT -1
G102 ATTIC ACCESS 3' - 0"7' - 0"0' - 1 3/4"2 H.M.PAINT H.M.PAINT -2
G-E2 8' - 0"6' - 8"0' - 1 1/2"EXIST PAINT EXIST PAINT --EXISTING DOOR REMOVE, REINSTALL & PAINT
G-E3 8' - 0"6' - 8"0' - 1 1/2"EXIST PAINT EXIST PAINT --EXISTING DOOR REMOVE, REINSTALL & PAINT
NOTE: BLANK IN TO OR FROM IS EXTERIOR
3/16" = 1'-0"2 GARAGE EAST ELEVATION1
3/16" = 1'-0"3 GARAGE NORTH ELEVATION1
3/16" = 1'-0"4 GARAGE WEST ELEVATION1
GARAGE NOTES
Label Note Comment
G01 EXISTING WOOD WINDOW. REMOVE DURING BUILDING
RELOCATION & REINSTALL AFTER. REPAIR & REGLAZE AS
REQUIRED & PAINT ENTIRE UNIT.
G02 NEW PREHUNG WOOD DOOR FULL LIGHT WITH FAUX DIVIDID
LIGHTS. PAINT ENTIRE UNIT.
G04 NEW 4" THICK CONCRETE FLOOR SLAB & FOUNDATIONS. EXACT
SIZE TO MATCH EXISTING GARAGE BEING RELOCATED. REFER
TO SECTION FOR MORE INFORMATION.
G05 EXISTING STAIR TO STORAGE ATTIC. AFTER BUILDING
RELOACTION REPAIR STAIR & LANDINGI AS REQUIRED.
G06 EXISTING GARAGE EXTERIOR WALLS. REPAIR ANY DAMAGED
OR DETERIORATED EXTERIOR SIDING & TRIM AS REQUIRED
WITH MATERIALS TO MATCH EXISTING. PAINT EXTERIOR TO
MATCH MAIN HOUSE.
G07 EXISTING SWING DOOR. REMOVE PRIOR TO GARAGE BUILDING
RELOCATION AND REINSTALL AFTER. REPAIR ALL ROT AND
DAMAGE (EXISTING OR CREATED DURING REMOVAL&
REINSTALLATION), REGLAZE WINDOWS IF NEEDED AND PAINT.
G08 EXISTING OVERHEAD GARAGE DOORS. REMOVE PRIOR TO
GARAGE BUILDING RELOCATION AND REINSTALL AFTER.
REPAIR ALL ROT AND DAMAGE (EXISTING OR CREATED DURING
REMOVAL& REINSTALLATION), AND PAINT.
G09 NEW ELECTRIC PANEL LOCATION
G10 EXISTING GARAGE ROOF. REMOVE EXISTING SHINGLES AND
REPAIR SHEATHING AS REQUIRED. REPLACE SHINGLES WITH
NEW FIBERGLASS ARCHITECTURAL SHINGLES TO MATCH NEW
SHINGLES BEING INSTALLED ON THE MAIN HOUSE
G11 EXISTING GARAGE OVERHEAD DOOR, MODIFY TOP PANEL TRO
ADD GLAZING TO EXISTING PANELS. GLAZING TO BE INSULATED
SAFETY GLAZING PANELS.
G12 EXISTING GARAGE EXTERIOR WALLS, PROVIDE NEW
FIBERGLASS BATT INSULATION & 5/8" GYPSUM WALL BOARD ON
THE INTERIOR. REPLACE SILL WITH P.T. 2x PLATE WHILE THE
GARAGE IS RAISED ON MOVERS TIBERS & CRIBBING.
G13 NEW WOOD ATTIC ACCESS DOOR WITH TRIM DETAILS TO LOOK
LIKE BARN DOOR. LOCATED DOOR IN EXISTING WINDOW
OPENING.
G14 NEW WALL HUNG MINI-SPLIT CONDESERS
G15 (2) NEW WOOD 2x4 AND PLYWOOD SHELVES FOR BIN STORAGE.
G16 REMOVE & REPLACE EXISTING EXTERIOR LIGHT FIXTURE WITH
NEW. SEE ELECTRICAL DRAWINGS.
3/8" = 1'-0"5 GARAGE SECTION
3/4" = 1'-0"
WALL TYPES PROJECT
NO
DE
S
C
R
I
P
T
I
O
N
DA
T
E
1/4" = 1'-0"6 GARAGE REFLECTED CEILING PLAN
1/4" = 1'-0"
DOOR LEGEND
First Floor
0' - 0"
Second Floor
10' - 0"
Basement-7' - 10"
Third Floor20' - 0"
E01
E01
E02
E01
E01
E02
E02
E02
E02
E01
E03
E03
E01 E02
E04
E04
E04
E04
E04
E12
First Floor0' - 0"
Second Floor10' - 0"
Basement-7' - 10"
Third Floor20' - 0"
E08
E07
E01
E02
E04
E04
E01
E02
E05
E03
E01
E02
E01
E13
E14
E15
Se
a
l
Pr
o
j
e
c
t
N
a
m
e
Dr
a
w
i
n
g
T
i
t
l
e
Pr
o
j
e
c
t
N
o
.
Pr
i
n
t
D
a
t
e
CO
N
T
R
A
C
T
O
R
S
H
A
L
L
V
E
R
I
F
Y
A
L
L
D
I
M
E
N
S
I
O
N
A
T
S
I
T
E
,
U
N
A
U
T
H
O
R
I
Z
E
D
A
L
T
ER
A
T
I
O
N
S
O
R
A
D
D
I
T
I
O
N
S
T
O
T
H
I
S
DO
C
U
M
E
N
T
I
S
A
V
I
O
L
A
T
I
O
N
O
F
T
H
E
N
E
W
Y
O
R
K
S
T
A
T
E
E
D
U
C
A
T
I
O
N
L
A
W
.
De
s
i
g
n
e
d
Dr
a
w
n
Ch
e
c
k
e
d
St
a
t
u
s
Da
t
e
Drawing No.
OF
WW
W
.
R
E
4
O
R
M
A
R
C
H
I
T
E
C
T
U
R
E
.
C
O
M
32
3
C
L
I
N
T
O
N
S
T
R
E
E
T
SC
H
E
N
E
C
T
A
D
Y
,
N
Y
12
3
0
5
P:
5
1
8
.
3
9
9
.
4
1
7
4
F:
5
1
8
.
3
9
9
.
4
1
0
5
2/
1
8
/
2
0
2
6
9
:
5
0
:
4
1
A
M
LH
K
LH
K
Ch
e
c
k
e
r
DR
B
SU
B
M
I
T
2/
1
8
/
2
6
EX
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
NU
M
B
E
R
Ri
s
e
-
M
i
l
e
s
t
o
n
e
Ma
n
o
r
R
e
n
o
v
a
t
i
o
n
A200
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
SA
R
A
T
O
G
A
S
P
R
I
N
G
S
,
N
Y
1
2
8
6
6
ELEVATION NOTES
LABEL NOTE
E01 EXISTING PAINT HAS TESTED POSSITIVE FOR LEAD. PREPAIR EXISTING PAINTED
SURFACES UTILIZING LEAD SAFE WORK PRACTICES. REPAINT ALL EXISTING
PAINTED SURFACES WITH EPA APPROVED ENCAPSULATING PAINT.
E02 REPAIR OR REPLACE ALL DETERIORATED SIDING, TRIM, WINDOW TRIM AND
EXISTING BUILDING ELEMENTS AS REQUIRED. ARCHITECT & CONTRACTOR TO
INSPECT BUILDING TOGETHER TO DETERTMINE AREAS REQUIRED TO BE
ADDRESSED. ALL ITEMS TO BE REPLACED SHALL BE REPLACED WITH MATERIALS
"IN KIND" WITH EXISTING.
E03 EXISTING RAILINGS, LATTICE & DECK SCREENS ARE TO REMAIN. REMOVE AS
REQUIRED DURING DECKING & SUPPORT WORK & REINSTALL. REPAIR OR
REPLACE ALL DETERIORATED ELEMENTS WITH NEW MATERIALS WHICH ARE "IN
KIND" WITH THE EXISTING TO REMAIN. REPAINT FOLLOWING EPA REGULATIONS &
GUIDELINES
E04 REMOVE & REPLACE EXISTING ASPHALT SHINGLE ROOFING COMPLETE. INSPECT
EXISTING ROOF SHEATHING & REPLACE AS REQUIRED. NEW SHINGLES ARE TO
BE ARCHECTURAL ASPHALT SHINGLE COLOR TO MATCH EXISTING.
E05 EXISTING PORCH DECK BOARDS, SUPPORTS, COLUMNS, STAIRS (REAR), AND ALL
ASSOCIATED ITEMS ARE TO BE INSPECTED AND REPAIRED OR REPLACED AS
REQUIRED WITH NEW MATERTIALS WHICH ARE TO BE "IN KIND" WITH THE
EXISTING TO REMAIN. ALL ITEMS ARE TO BE REPAINTED PER EPA REGULATIONS &
GUIDELINES.
E06 EXISTING FRONT DOORS TO REMAIN. REVISE EXISTING DOOR HARDWARE AS
REQUIRED TO ENSURE SAFE EGRESS.
E07 (3) NEW HVAC CONDENSING UNITS MOUNTED ON PREMANUFACTURED STEEL
TUBE STANDS ON A NEW 4" CONCRETE SLAB. SEE MECHANICAL DRAWINGS.
E08 REMOVE EXISTING WINDOW COMPLETE. INFILL EXISTING WINDOW OPENING WITH
GLASS BLOCK & VENTILATION FAN.
E09 EXISTING WOOD STAIR REMOVE & CONSTRUCT NEW TO MATCH EXISTING. PAINT
TO MATCH EXISTING. INSTALL NON SLIP POWDER COATED ALUMINUM
HANDI-TREADS ON EACH TREAD & AT TOP LANDING. COLOR NEW ENGLAND GRAY.
E10 EXISTING CONCRETE STAIR REPAIR AS REQUIRED. INSTALL NON SLIP POWDER
COATED ALUMINUM HANDI-TREADS ON EACH TREAD & AT TOP LANDING. COLOR
NEW ENGLAND GRAY.
E11 INFILL EXISTING WINDOW OPENING WITH GLASS BLOCK & VENTILATION FAN.
E12 INVESTIGATE & REPAIR ANY DAMAGE TO THE PORCH & ROOF SUPPORTS IN THIS
AREA. EXISTING CONDITIONS INDICATE POSSIBLE STRUCTURAL DAMAGE IN THIS
AREA. NOTIFY ARCHITECT OF FINDINGS.
E13 EXISTING FENCE TO BE REPLACED WITH NEW FENCE. NEW FENCE TO MATCH
EXISTING IN MATERIAL, SIZE, & STYLE.
E14 EXISTING GAZEBO TO BE REPLACED WITH NEW. NEW GAZEBO TO MATCH
EXISTING IN MATERIAL, SIZE, & STYLE.
E15 REMOVE & REPLACE EXISTING EXTERIOR LIGHT FIXTURE WITH NEW. SEE
ELECTRICAL DRAWINGS.
3/16" = 1'-0"1 NORTH ELEVATION
3/16" = 1'-0"2 EAST ELEVATION
NO
DE
S
C
R
I
P
T
I
O
N
DA
T
E
GENERAL NOTE:
REFER TO THE LEAD BASED PAINT SURVEY INCLUDED IN THE SPSECIFICATION.
EXTERIOR SURFACES CONTAINING LEAD PAINT ARE INCLUDED IN THIS
DOCUMENT. CONTRACTOR IS TO USE LEAD SAFE WORK PRACTICES IN
COMPLIANCE WITH THE EPA RENOVATION, REPAIR, AND PAINTING RULE, OR
CONFIRM THE ABSENCE OF LEAD-BASED PAINT USING AN EPA RECOGNIZED
TEST KIT. EPA APPROVED DOCUMENTATION FORM TO BE SUBMITTED TO THE
OWNER AND PROGRAM PRIOR TO STARTING PAINT STABILIZATION WORK.
NEW EXTERIOR
LIGHT FIXTURE
First Floor0' - 0"
Second Floor10' - 0"
Basement-7' - 10"
Third Floor
20' - 0"
E04
E04
E04
E01
E02
E03
E05
E03
E05
E01
E02
E06
First Floor0' - 0"
Second Floor10' - 0"
Basement-7' - 10"
Third Floor
20' - 0"
E01
E02
E02
E01
E04
E04
E05
E03
E01
E02 E04
E01
E01
E02
E04
E07
Se
a
l
Pr
o
j
e
c
t
N
a
m
e
Dr
a
w
i
n
g
T
i
t
l
e
Pr
o
j
e
c
t
N
o
.
Pr
i
n
t
D
a
t
e
CO
N
T
R
A
C
T
O
R
S
H
A
L
L
V
E
R
I
F
Y
A
L
L
D
I
M
E
N
S
I
O
N
A
T
S
I
T
E
,
U
N
A
U
T
H
O
R
I
Z
E
D
A
L
T
ER
A
T
I
O
N
S
O
R
A
D
D
I
T
I
O
N
S
T
O
T
H
I
S
DO
C
U
M
E
N
T
I
S
A
V
I
O
L
A
T
I
O
N
O
F
T
H
E
N
E
W
Y
O
R
K
S
T
A
T
E
E
D
U
C
A
T
I
O
N
L
A
W
.
De
s
i
g
n
e
d
Dr
a
w
n
Ch
e
c
k
e
d
St
a
t
u
s
Da
t
e
Drawing No.
OF
WW
W
.
R
E
4
O
R
M
A
R
C
H
I
T
E
C
T
U
R
E
.
C
O
M
32
3
C
L
I
N
T
O
N
S
T
R
E
E
T
SC
H
E
N
E
C
T
A
D
Y
,
N
Y
12
3
0
5
P:
5
1
8
.
3
9
9
.
4
1
7
4
F:
5
1
8
.
3
9
9
.
4
1
0
5
2/
1
8
/
2
0
2
6
9
:
5
0
:
4
4
A
M
LH
K
LH
K
Ch
e
c
k
e
r
DR
B
SU
B
M
I
T
2/
1
8
/
2
6
EX
T
E
R
I
O
R
E
L
E
V
A
T
I
O
N
S
NU
M
B
E
R
Ri
s
e
-
M
i
l
e
s
t
o
n
e
Ma
n
o
r
R
e
n
o
v
a
t
i
o
n
A201
16
2
C
I
R
C
U
L
A
R
S
T
R
E
E
T
SA
R
A
T
O
G
A
S
P
R
I
N
G
S
,
N
Y
1
2
8
6
6
3/16" = 1'-0"1 WEST ELEVATION
3/16" = 1'-0"2 SOUTH ELEVATION
ELEVATION NOTES
LABEL NOTE
E01 EXISTING PAINT HAS TESTED POSSITIVE FOR LEAD. PREPAIR EXISTING PAINTED
SURFACES UTILIZING LEAD SAFE WORK PRACTICES. REPAINT ALL EXISTING
PAINTED SURFACES WITH EPA APPROVED ENCAPSULATING PAINT.
E02 REPAIR OR REPLACE ALL DETERIORATED SIDING, TRIM, WINDOW TRIM AND
EXISTING BUILDING ELEMENTS AS REQUIRED. ARCHITECT & CONTRACTOR TO
INSPECT BUILDING TOGETHER TO DETERTMINE AREAS REQUIRED TO BE
ADDRESSED. ALL ITEMS TO BE REPLACED SHALL BE REPLACED WITH MATERIALS
"IN KIND" WITH EXISTING.
E03 EXISTING RAILINGS, LATTICE & DECK SCREENS ARE TO REMAIN. REMOVE AS
REQUIRED DURING DECKING & SUPPORT WORK & REINSTALL. REPAIR OR
REPLACE ALL DETERIORATED ELEMENTS WITH NEW MATERIALS WHICH ARE "IN
KIND" WITH THE EXISTING TO REMAIN. REPAINT FOLLOWING EPA REGULATIONS &
GUIDELINES
E04 REMOVE & REPLACE EXISTING ASPHALT SHINGLE ROOFING COMPLETE. INSPECT
EXISTING ROOF SHEATHING & REPLACE AS REQUIRED. NEW SHINGLES ARE TO
BE ARCHECTURAL ASPHALT SHINGLE COLOR TO MATCH EXISTING.
E05 EXISTING PORCH DECK BOARDS, SUPPORTS, COLUMNS, STAIRS (REAR), AND ALL
ASSOCIATED ITEMS ARE TO BE INSPECTED AND REPAIRED OR REPLACED AS
REQUIRED WITH NEW MATERTIALS WHICH ARE TO BE "IN KIND" WITH THE
EXISTING TO REMAIN. ALL ITEMS ARE TO BE REPAINTED PER EPA REGULATIONS &
GUIDELINES.
E06 EXISTING FRONT DOORS TO REMAIN. REVISE EXISTING DOOR HARDWARE AS
REQUIRED TO ENSURE SAFE EGRESS.
E07 (3) NEW HVAC CONDENSING UNITS MOUNTED ON PREMANUFACTURED STEEL
TUBE STANDS ON A NEW 4" CONCRETE SLAB. SEE MECHANICAL DRAWINGS.
E08 REMOVE EXISTING WINDOW COMPLETE. INFILL EXISTING WINDOW OPENING WITH
GLASS BLOCK & VENTILATION FAN.
E09 EXISTING WOOD STAIR REMOVE & CONSTRUCT NEW TO MATCH EXISTING. PAINT
TO MATCH EXISTING. INSTALL NON SLIP POWDER COATED ALUMINUM
HANDI-TREADS ON EACH TREAD & AT TOP LANDING. COLOR NEW ENGLAND GRAY.
E10 EXISTING CONCRETE STAIR REPAIR AS REQUIRED. INSTALL NON SLIP POWDER
COATED ALUMINUM HANDI-TREADS ON EACH TREAD & AT TOP LANDING. COLOR
NEW ENGLAND GRAY.
E11 INFILL EXISTING WINDOW OPENING WITH GLASS BLOCK & VENTILATION FAN.
E12 INVESTIGATE & REPAIR ANY DAMAGE TO THE PORCH & ROOF SUPPORTS IN THIS
AREA. EXISTING CONDITIONS INDICATE POSSIBLE STRUCTURAL DAMAGE IN THIS
AREA. NOTIFY ARCHITECT OF FINDINGS.
E13 EXISTING FENCE TO BE REPLACED WITH NEW FENCE. NEW FENCE TO MATCH
EXISTING IN MATERIAL, SIZE, & STYLE.
E14 EXISTING GAZEBO TO BE REPLACED WITH NEW. NEW GAZEBO TO MATCH
EXISTING IN MATERIAL, SIZE, & STYLE.
E15 REMOVE & REPLACE EXISTING EXTERIOR LIGHT FIXTURE WITH NEW. SEE
ELECTRICAL DRAWINGS.
NO
DE
S
C
R
I
P
T
I
O
N
DA
T
E
GENERAL NOTE:
REFER TO THE LEAD BASED PAINT SURVEY INCLUDED IN THE SPSECIFICATION.
EXTERIOR SURFACES CONTAINING LEAD PAINT ARE INCLUDED IN THIS
DOCUMENT. CONTRACTOR IS TO USE LEAD SAFE WORK PRACTICES IN
COMPLIANCE WITH THE EPA RENOVATION, REPAIR, AND PAINTING RULE, OR
CONFIRM THE ABSENCE OF LEAD-BASED PAINT USING AN EPA RECOGNIZED
TEST KIT. EPA APPROVED DOCUMENTATION FORM TO BE SUBMITTED TO THE
OWNER AND PROGRAM PRIOR TO STARTING PAINT STABILIZATION WORK.