HomeMy WebLinkAbout20251025 30 Washington St. Bethesda SPR NOD
Page 1 of 2
CITY OF SARATOGA SPRINGS
P LANNING B OARD
❖
City Hall - 474 Broadway
Saratoga Springs, New York 12866
Tel: 518-587-3550
www.saratoga-springs.org
MARK PINGEL, Chair
JOSEPH FERRANTE, Vice Chair
KERRY MAYO
BILL MCTYGUE
MICHAEL KING
TONY STELLATO
ALEX WHITE
NOTICE OF DECISION
In the matter of the application - #20251025
Adelphi Owner LLC
365 Broadway
Saratoga Springs, NY 12866
Involving the premises with tax parcel no. 165.67-1-22 in the City of Saratoga Springs, on an application
for site plan review to move and relocate the existing stone parish house at 19 Washington St. to the
Bethesda Episcopal Church property at 30 Washington Street for future use by the church in the Urban
Core (T-6) District.
In accordance with 6 NYCRR Part 617, the Planning Board classified the action as Type 1 and issued a
Negative SEQRA Declaration on January 22, 2026 passed 7-0 in favor: Pingel, Ferrante, Mayo,
McTygue, King, Stellato, White;
And, in accordance with Site Plan Review approval standards in the Unified Development Ordinance,
Article 13.5, the Planning Board issued the following decision on January 22, 2026 passed 7-0 in favor:
Pingel, Ferrante, Mayo, McTygue, King, Stellato, White:
Approve site plan set dated October 31, 2025 with the following revisions and conditions:
1. Consider relocating the street trees to be located on the property and in front of the relocated
parish building, subject to approval by DPW.
2. Install a City-standard bench within the ROW.
3. Final plans are subject to DPW approval, which includes the physical relocation of the parish
house structure.
The applicant is required to:
1. Provide documentation of conformance with all required conditions of approval.
2. Deliver a letter of credit or cash escrow in the amount approved by the City Engineer to
the City. This must occur prior to final signature by the Planning Board Chair.
3. Submit two (2) paper copies and one (1) electronic copy of the final approved site plan
set for signature by the Planning Board Chair within eighteen (18) months of approval as
per Article 13.5 of the Unified Development Ordinance.
Note: this approval shall expire within eighteen (18) months of the signature of final plans if the applicant
has not started actual construction as per Article 13.5 of the UDO.
January 22, 2026
Date filed with Accounts Dept. Chair