The West Ave Site Plan project proposes the development of a four-story building featuring
commercial/retail space and multifamily rental units in the City of Saratoga Springs, New York. The
basement level will provide 61 indoor vehicle parking spaces as well as 19 indoor bicycle parking spaces.
The first floor of the building, with a footprint of approximately 23,381 SF, will include 6,134 SF of
commercial/retail space and 13 multifamily rental units. Floors 2 through 4 will provide 63 multifamily
rental units, mechanical rooms, and circulation areas. The applicant for the proposed development is
West Station LLC, 2 Moore Ave, Saratoga Springs, NY 12866.
EXISTING CONDITIONS
Existing Land Use and Zoning
The project site includes one parcel having an area of 2.00± acres located at the northwest corner of
Station Lane and West Ave. The tax map identification number for the parcel is 165.-2-76.2. The parcel is
zoned NC – Neighborhood Center District, as defined by the City of Saratoga Springs Unified Development
Ordinance. A general overview of the surrounding land uses in the area includes urban, commercial,
suburban residential, and multifamily residential uses. The proposed development is consistent with the
current land uses in the surrounding area.
Wetlands and Streams
The project area contains NYSDEC regulated wetlands totaling 0.054± acres and 0.557± acres of associated
NYSDEC 100’ adjacent area. The wetlands continue offsite to the west.
Soils
According to maps from the Natural Resources Conservation Service (NRCS) of Saratoga County, the onsite
soils are classified as follows:
· Deerfield Loamy Fine Sand (DeA, DeB): This is a very deep, moderately well drained soil formed
in glacial fluvial deposits. It is found on outwash terraces, outwash plains, outwash deltas and
kame terraces. The surface runoff is negligible to low. Hydrologic Soil Group A.
pg. 2
· Wareham Loamy Sand (Wa): This is a very deep, nearly level, poorly drained soil formed in
outwash plains. It is found on glacial outwash plains, lake plains, terraces, and deltas. The
permeability is rapid throughout the soil and the surface runoff is negligible or low. The soil has a
slight erosion hazard. Hydrologic Soil Group A/D.
· Windsor Loamy Sand (WnB): This is a very deep, excessively drained soil formed in outwash or
eolian deposits. It is found on dunes, outwash plains, deltas, and outwash terraces. The surface
runoff is low. Hydrologic Soil Group A.
Onsite soil tests showed the presence of silt throughout the in-situ soils and a general lack of permeability.
As such, the soils were modeled as Hydrologic Soil Group C for the purposes of preparing the project
Stormwater Pollution Prevention Plan.
PROPOSED CONDITIONS
The Faden-West Ave Site Plan project proposes the development of a four-story mixed-used building that
will provide commercial/retail space and multifamily rental units located at the northwest corner of West
Ave and Station Lane. The gross floor area of the 1st through 4th floors of the building is approximately
93,524 SF. The basement level will provide 61 indoor parking spaces, a 19-space bicycle parking area that
complies with the requirements of the City of Saratoga Springs Unified Development Ordinance (UDO), a
mechanical room, a trash room, and access to the building stair towers and elevators. The first floor will
provide approximately 6,134 SF of commercial/retail space, 13 apartments, a package and mail room, a
fitness room, a leasing office, a utility room, circulation areas, and access to the two building elevators.
The proposed first floor commercial space will be located entirely along the West Ave frontage to allow
the building to remain consistent with the existing commercial development in this section of the City,
while the first floor residential units will be located along the Station Lane frontage and the rear of the
building. The second through fourth floors will consist of 63 apartments (21 units per floor),
mechanical/utility rooms, and circulation areas. Each residential unit will include a private patio or balcony.
Per discussions with the City of Saratoga Springs Zoning Officer, the proposed use for the building is
classified as “Multi-Family Dwelling – Residential Structure Only” due to the presence of the 13 residential
units on the first floor. The “Multi-Family Dwelling – Residential Structure Only” use is permitted in the
NC - Neighborhood Center district upon the granting of a Special Use Permit by the City of Saratoga Springs
Planning Board.
The West Ave Site Plan project proposes the installation of a sidewalk along the north side of Station Lane
that will link the sidewalk constructed by the adjacent Station Lane Apartments project to the sidewalk
on the west side of West Ave. An internal sidewalk network will provide connections from the parking
areas to the building entrances. Storefront access to the commercial/retail space along West Ave will be
provided by an ADA-compliant ramp, ADA-compliant stairs, and a sidewalk along the West Ave building
frontage. An outdoor patio area for the commercial/retail space will be provided on the south side of the
building near the intersection of West Ave and Station Lane. The project also proposes a hardscape area
with park benches and a grassed and landscaped greenspace area to the north of the sidewalk on Station
Lane to meet the public civic space requirements included in Article 9.3 of the UDO.
pg. 3
The UDO requires 1 parking space per 500 gross square feet of floor area for retail uses. For multifamily
residences in the NC District, the UDO requires a minimum of 1.5 parking spaces per residential unit.
Therefore, the 6,134 SF of commercial/retail space will require 12 spaces and the 76 multifamily units will
require 114 parking spaces, resulting in a total of 126 required parking spaces for the development. The
UDO allows for a reduced number of parking spaces when shared parking demands are accounted for.
The required parking for mixed-use developments is first calculated for each individual use included in the
proposed development. After the initial parking requirements are calculated, the shared parking
calculations are then determined by using Table 10-D of the UDO. For the West Ave Site Plan project, it
was determined that 126 parking spaces are needed to meet the peak parking demand during the 7am-
6pm timeframe on both weekdays and weekends. The project proposes 61 interior basement-level
parking spaces, 58 exterior parking spaces in the parking lot behind the building, and 8 street parking
spaces along the north side of Station Lane. The total number of parking spaces to be provided is 127
spaces, which meets the requirements of the UDO.
ZONING VARIANCES
After a review of the project plans, City planning staff identified two (2) area variances as being needed
to allow for the proposed development. Both variances were granted by the Zoning Board of Appeals on
November 20, 2023.
PROPOSED INFRASTRUCTURE
Driveways & Access
The development will include one new curb cut along Station Lane. Existing vegetation along the north
side of Station Lane will be cleared to improve sight distances at the proposed driveway. The driveway
has been located as far away from the West Ave and Station Lane intersection as possible while also
minimizing impacts to the NYSDEC 100’ adjacent area buffer at the west side of the project parcel.
Preliminary Stormwater Management Drainage Plans
Stormwater will be managed on-site using green infrastructure run-off reduction practices and
stormwater management facilities. Stormwater management practices have been addressed in the
project specific Stormwater Pollution Prevention Plan (SWPPP) included with this submission. Stormwater
control practices have been designed and will be implemented in accordance with all NYSDEC technical
standards and the City of Saratoga Springs guidelines. The stormwater management systems and
appurtenances have been designed and will be constructed in accordance with all local, state, and federal
requirements and are proposed to be operated and maintained by the Owner.
Preliminary Sewer and Water Plans
The total anticipated water and sewage (wastewater) average daily demands for the project are estimated
to be 12,652 gallons per day (gpd) based on the following:
Retail Space (6,134 ft2) x (0.1 gpd/ ft2) x (0.8) = 492 gpd
pg. 4
Multifamily (76 Units) x (200 gpd/ Unit) x (0.8) = 12,160 gpd
TOTAL = 12,652 gpd
There is an existing water main along the south side of Station Lane and another along the west side of
West Ave. The development proposes one new 6” service connection to the 12” watermain along West
Ave to meet the anticipated domestic and fire protection demands of the building. Since the water main
is located close to the curb on the west side of West Ave, the disturbance required to make the service
connection, and any impacts to traffic on West Ave, are anticipated to be minimal.
There is an existing gravity sanitary sewer main that discharges to an existing pump station on the north
side of Station Lane. The development proposes a 6” lateral connection to the existing Station Lane gravity
sanitary sewer main. The gravity main in Station Lane is deeper than the gravity main located in West Ave.
However, it is anticipated that the proposed connection to the Station Lane gravity main will result in less
disturbance than would a connection to the West Ave gravity main due to the proximity of the two pipes
in relation to the project parcel. Station Lane carries a lower volume of traffic and the gravity main is
located on the north (project side) of the right-of-way, while West Ave carries a higher volume of traffic
and the gravity main is located in the eastern portion of the right-of-way.
The existing pump station was identified to have capacity deficiencies as outlined by Bergmann Associates
in an Engineer’s Report dated August 16, 2017. At the time of the Bergmann Associates report, four
projects were proposed along Station Lane. One of the projects did not advance, however the remaining
three projects continued. The Intrada Development and Station Lane Apartments projects have been
completed. The required upgrades to the pump station to meet the anticipated flows generated by the
three projects were completed in 2019 by the owner of the Intrada Development. The proponents of the
Intrada Development, Station Lane Apartments development, and the West Ave Site Plan project agreed
to participate in a cost sharing agreement to cover the costs of the pump station upgrades proportionate
to the contributing flows from each project to the existing pump station. The applicant for the West Ave
Site Plan project is committed to providing the appropriate funds per the cost sharing agreement for the
pump station upgrades upon the project being granted site plan approval by the City of Saratoga Springs
Planning Board.
SUMMARY
The West Ave Site Plan project is proposed in accordance with the NC zoning district requirements and
the City of Saratoga Springs Comprehensive Master Plan. The project is anticipated to meet the current
multifamily and retail needs in the area and is not anticipated to have an adverse impact on surrounding
property owners or businesses. The development will uphold the City’s vision by working with existing
land features, employing existing guidelines, and appropriately enhancing the West Ave corridor in the
City of Saratoga Springs. The applicant and the applicant’s engineer look forward to advancing this project