HomeMy WebLinkAbout20260091 Lexington Rd & Bemis Heights Rd Subdivision Modification Cost EstimateCost Estimate for Letter of Credit (Template) (Note: This is not an all inclusive list. Please adjust for project specifics.) Planning Board No.: Project: Bemis Point Subdivision Location: Lexington Road and Bemis Heights Road Saratoga Springs, NY Date: 12.16.25 Firm Name & Preparer: Crandall Construction Services for Arico Associates Page 1 of 3 On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 3.5 AC $16,000.00 $56,000.00 0%$56,000.00 2 Rough Grading 2,100 CY $15.00 $31,500.00 0%$31,500.00 3 Silt Fence 2,000 LF $23.50 $47,000.00 0%$47,000.00 4 Construction Entrance 1 EA $10,000.00 $10,000.00 0%$10,000.00 5 Finish Grading 1 EA $11,400.00 $11,400.00 0%$11,400.00 6 Misc. Erosion Control Measures 0 EA $0.00 $0.00 0%$0.00 Demolition 7 Building Removal 0 EA $0.00 $0.00 0%$0.00 8 Asphalt Removal 0 SF $0.00 $0.00 0%$0.00 9 Concrete Removal 0 SF $0.00 $0.00 0%$0.00 Hard Scape 10 Stone Subbase 1,100 CY $90.00 $99,000.00 0%$99,000.00 11 Asphalt Pavement 30,000 SF $3.80 $114,000.00 0%$114,000.00 12 CIP Curbing 0 LF $0.00 $0.00 0%$0.00 13 Concrete Sidewalk 0 SF $0.00 $0.00 0%$0.00 14 Retaining Wall 100 LF $35.00 $3,500.00 0%$3,500.00 Site Amenities 15 Traffic Signs 1 EA $500.00 $500.00 0%$500.00 16 Striping 0 LS $0.00 $0.00 0%$0.00 17 Crosswalk 0 LS $0.00 $0.00 0%$0.00 18 Bench 0 EA $0.00 $0.00 0%$0.00 19 Bike Rack 0 EA $0.00 $0.00 0%$0.00 20 Site Lighting 0 EA $0.00 $0.00 0%$0.00 21 Fencing 0 LF $0.00 $0.00 0%$0.00 Site Water 22 8" DIP Class 52 Water Main 1100 LF $235.00 $258,500.00 0%$258,500.00 23 3/4" Type K Copper Water Service 13 EA $2,500.00 $32,500.00 0%$32,500.00 24 1" Type K Copper Water Service 0 EA $0.00 $0.00 0%$0.00 25 Water Fittings 0 LS $0.00 $0.00 0%$0.00 26 Fire Hydrant Assembly 2 EA $2,500.00 $5,000.00 0%$5,000.00 LOC Bemis Point_12.22.25 Page 2 of 3 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary 27 3" Low-Pressure Sanitary Line & Stone 1100 LF $200.00 $220,000.00 0%$220,000.00 28 8" SDR-26 Sanitary Line & Stone 0 LF $0.00 $0.00 0%$0.00 29 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Site Storm 30 6" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 31 12" HDPE Storm Drain & Stone 400 LF $300.00 $120,000.00 0%$120,000.00 32 Catch Basin 9 EA $1,500.00 $13,500.00 0%$13,500.00 33 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 34 Yard Drains 0 EA $0.00 $0.00 0%$0.00 Stormwater Management 35 Bioretention Area 0 EA $0.00 $0.00 0%$0.00 36 UG Infiltration Chambers 0 EA $0.00 $0.00 0%$0.00 37 Hydrodynamic Separator 0 EA $0.00 $0.00 0%$0.00 38 Wet Pond 0 EA $0.00 $0.00 0%$0.00 Landscaping 39 Topsoil/Seed/Mulch 0 CY $0.00 $0.00 0%$0.00 40 Deciduous Trees 25 EA $1,200.00 $30,000.00 0%$30,000.00 41 Shrubs 0 EA $0.00 $0.00 0%$0.00 Total onsite Work $1,052,400.00 $1,052,400.00 Total onsite X.25 $263,100.00 $263,100.00 Off Site (All infrastructure & amenities to be dedicated to the City) Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Road Construction 42 Stonel Subbase 0 CY $0.00 $0.00 0%$0.00 43 Asphalt Pavement (Binder)0 SF $0.00 $0.00 0%$0.00 44 Asphalt Pavement (Top)0 SF $0.00 $0.00 0%$0.00 45 Concrete Curbing 0 LF $0.00 $0.00 0%$0.00 46 Concrete Sidewalk 0 SF $0.00 $0.00 0%$0.00 Site Amenities 47 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 48 Striping 0 LS $0.00 $0.00 0%$0.00 49 Crosswalk 0 LS $0.00 $0.00 0%$0.00 50 Street Signs 0 EA $0.00 $0.00 0%$0.00 51 Decrotive Street Light 0 EA $0.00 $0.00 0%$0.00 LOC Bemis Point_12.22.25 Off Site Water 52 6" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 53 6" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 54 8" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 55 8" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 56 S.S. Tapping Sleeve and Valve Connection 0 EA $0.00 $0.00 0%$0.00 57 3/4" Corp, WSO and Type K water service to PL 0 EA $0.00 $0.00 0%$0.00 58 1" Corp, WSO and Type K water service to PL 0 EA $0.00 $0.00 0%$0.00 59 Water Fittings 0 LS $0.00 $0.00 0%$0.00 60 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 61 Testing & Disinfection 0 LS $0.00 $0.00 0%$0.00 Page 3 of 3 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Site Sanitary 62 SDR-35 6" Sanitary Service to PL & Stone 0 EA $0.00 $0.00 0%$0.00 63 SDR-35 8" Sanitary Main & Stone 0 LF $0.00 $0.00 0%$0.00 64 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 65 Kor N' Seal connection 0 EA $0.00 $0.00 0%$0.00 Site Storm 66 12" HDPE Storm Line & Stone 0 LF $0.00 $0.00 0%$0.00 67 Catch Basin 0 EA $0.00 $0.00 0%$0.00 68 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Landscaping 69 Topsoil/Seed/Mulch 0 CY $0.00 $0.00 0%$0.00 70 Street Trees 0 EA $0.00 $0.00 0%$0.00 Misc. 71 As-built Drawing 0 LS $0.00 $0.00 0%$0.00 Total offsite Work $0.00 $0.00 Total On-Site Work X25%$263,100.00 Total Off-Site work $0.00 Total LOC Amount = $263,100.00 * New LOC Reduced Amount = $263,100.00 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $65,775.00 LOC Bemis Point_12.22.25