HomeMy WebLinkAbout20260067 16 Marion / Ave A Subdivision Extension Applicationr.-p.t , CITY OF SARATOGA SPRI NGS CHUCK MARSHALL, Chair PLANNING BOARD MARK PINGEL, Vice Chair r0. 0 KE RRY MAYO i-- .__Y, .__ City Hall -474 Broadway WILLIAM MCTYGUE MICHAEL KING a ,. . .,.; .; Saratoga Spri ngs, New York I 2866 Tel:5 I8-587-3550 fax:5 I8-580-9480 TONY STELLATO i JOSEPH FERRANTEwww.saratoga-springs.org ALEX WH ITE,Alternate NOTICE OF DECISION I N TH E MATTE R OF TH E SUBDIVISION APPLICATION NO. 20240932 oF ALLEN TANNER I 6 MARION AVE. SARATOGA SPRINGS, NY I 2866 Involving the premises with Tax Parcel ID#I 53.I 7-I-8, in the City of Saratoga Springs, on an application for final plat review of a proposed two-lot subdivision within the Urban Residential—2 (UR-2) District with the Planning Board who met on January I 6, 2025 and made the following decision(s): In accordance with SEQRA regulations 6NYCRR Part 6 I 7 and after review and evaluation of the SEQRA short Environmental Assessment Form Parts I and II, made a motion to issue a Negative SEQRA Declaration on January I6, 2025; And, in accordance with the purpose and objectives set forth in the City's Unified Development Ordinance Article I 4 "Subdivision Approval", the Planning Board issued the following decision—passed 6-0 (Marshall, Pingel, Mayo, McTygue, King,White): Q Approve final subdivision plat(dated I 0/08/2024)with the following conditions: I. Add two street trees on lot 2 to the west of the east along Marion Ave. 2. Final plans shall address all of the technical review comments to the satisfaction of the City Engineers Office/DPW. 3. Design Review Board approval of the demolition of the one-story portion of the existing residence shall be obtained followed by removal of that portion of the structure prior to signing by the Chair of the final plat. The applicant is required to complete the following prior to signing of the final plat by the Planning Board Chair: Deliver a letter of credit or cash escrow as a performance guarantee to the City for required on-and off-site improvements. Submit one(I)mylar and two(2)paper copies of the final approved subdivision plat for signature by the Planning Board Chair. File the signed final subdivision plat with the Saratoga County Clerk within sixty-two (62) days as provided in Article 3, Section 32 of General City Law. Approval of the final plat expires within one year after the resolution granting such approval unless all requirements stated in such resolution have been certified and completed per Article I 4 of the UDO. January 3 I, 2025 Date filed with Accounts Dept. Chair cc: Building Dept.,Accounts Dept.,Applicant/Agent, File P LANNING BOARD MINUTES DRAFT THURSDAY, APRIL 10, 2025 6:00 P.M. CITY COUNCIL ROOM CALL TO ORDER: Mark Pingel, Chair called the meeting to order at 6:00 P.M. PRESENT: Mark Pingel, Chair, Bill McTygue, Kerry Mayo, Alex White (alternate), Mike King, Anthony (Tony) Stellato ABSENT: Joe Ferrante, Co-Chair STAFF: Susan Barden, Principal Planner, Leah Everhart, City Counsel, James Sallaway, City Engineer. A. APPROVAL OF MEETING MINUTES: B. POSSIBLE CONSENT AGENDA ITEMS: None Note: The intent of a consent agenda is to identify any applications that appear to be ‘approvable’ without need for further evaluation or discussion. If anyone wishes to further discuss any proposed consent agenda item, then that item would be pulled from the ‘consent agenda’ and dealt with individually. Mark Pingel, Chair announced that James Sallaway is now the City Engineer. Congratulations James! Mark mentioned that it’s his first meeting as chair and it will be tough to follow-up the two past chairs – Mark Torpey and Chuck Marshall. C. PLANNING BOARD APPLICATIONS UNDER CONSIDERATION: NOTE: Agenda item discussion will not begin past 10:00 p.m. 1. #20230877 NYS Route 29 Mixed-Use. Consideration of SEQRA review for a mixed-use project including multi-family residences and a hotel in the Neighborhood Commercial (T-5) District. Bill McTygue recused himself from this project. Mark Pingel, Chair said this application has been before the board in the past. The board won’t be making any decisions tonight. They will listen to the presentation, ask questions and summarize to the applicant what further details are needed. Jamie Easton represented the applicant, Prime Companies and presented the following: City of Saratoga Springs – Planning Board Minutes – April 10, 2025 - Page 4 of 10 Tonya Yasenchak, Y Engineering & Engineering America represented the applicant. Tonya said she was asked by the board to revisit the parking for the existing two-family residence, and she presented two options: Option B – a second driveway that would provide parking for two and would require removing a large tree. Option A – was sent to the applicant from the city engineer’s office showing a parking space (indentation) in front of the two-family residence allowing the tree to be preserved. Mark asked if the applicant has a preference. Tonya said their preference is to have the parking in front of the building so the larger tree can be preserved but they’ll do either option. Mark Pingel, Chair asked if anyone from the public wished to speak. Deb LaCombe, 11 Marion Ave., also an HOA member said they would prefer plan B to have two off-street parking spaces. It will be safer and easier to maintain in the wintertime. Mark Pingel, Chair closed the Public Hearing and asked the individual board members to state their preference and reasoning for their choice. Bill – said he prefers the straight curb without the cutout (option B) from a practical street design standpoint. The cutout presents a problem for 2 cars in the future to be able to park there. The cutout cheapens the design of the project. Alex – agrees with Bill and with keeping the off-street parking consistent with the surrounding neighborhood properties. Kerry – prefers Option A and preserving the trees. Having cars parked close to the street will calm the traffic there. Tony – agreed with Bill and his reasons cited, Option B. Mike – on-street parking with parking bays is bringing the city into the future. It will have to be designed wide enough to accommodate snow/snow plowing. He said the material used for the bay could be a permeable material that would actually help with stormwater runoff. He agrees with Option A. It will calm traffic, make the street safer, and save the large tree from being cut down. After a straw poll it was determined that the board would prefer Option B. Leah said this will be a modification to the previously adopted SEQRA. The board can adopt a motion stating that this is a minor modification to the previously reviewed SEQRA action, and it will have no impacts different or greater than those already considered for SEQRA purposes. Mark Pingel made a motion that this modification to the previously reviewed and adopted SEQRA is minor. The motion was seconded by Kerry Mayo. Vote: M. King-Y, T. Stellato-Y, M. Pingel-Y, K. Mayo-Y, A. White-Y, B. McTygue-Y. 6-0, Motion carried. Mark Pingel made a motion to rescind their previous subdivision approval. The motion was seconded by Bill McTygue. Vote: M. King-Y, T. Stellato-Y, M. Pingel-Y, K. Mayo-Y, A. White-Y, B. McTygue-Y. 6-0, Motion carried. Mark Pingel made a motion to approve the subdivision at 11 Marion Ave. as defined by the drawing package that was submitted to the city, to include the parking plan which includes 2 driveways – one on each side of the two-family residence. The motion was seconded by City of Saratoga Springs – Planning Board Minutes – April 10, 2025 - Page 5 of 10 Tony Stellato. Vote: M. King-N, T. Stellato-Y, M. Pingel-Y, K. Mayo-N, A. White-Y, B. McTygue-Y. 4-2, Motion carried. 3. #2025132 54 Church St. Sketch site plan. Sketch plan of a proposed mixed-use project in the Urban Core (T-6) District. Mark Pingel, Chair said this property is currently a gas station with a small convenience store. Tonya Yasenchak, Y Engineering & Engineering America represented the applicant who purchased the property from Golub Properties. There was a gas station on it that the applicant leased for a period of time. When he purchased the property he was required to put in new fuel tanks and pumps which were done within the last 5 years. The cost for these new utilities for the gas station was over $300,000. The applicant is proposing to remove some pumps and construct a mixed-use building with commercial space on the first floor and apartments on the upper floors. Tonya said they are before the planning board with a sketch plan because the site is unique in size and configuration, and because of the existing utilities on the site. The address of the site is 54 Church, but the narrower frontage of the property is along Clinton St. Tonya said according to the UDO if a property is on a corner the narrowest portion of the lot is considered the front (Clinton St.). Tonya said because there are frontage requirements and possible zoning variances needed they wanted to get the PB’s thought on the project first. She showed photos of the site from various angles and a site plan map. She presented a sketch of the proposed 4-story building to show mass and scale. Tonya said she’s started discussions with the Preservation Foundation regarding rhythm on the building. The building will be brick with balconies, and they will add arches and metal work. The design is in a very preliminary stage. There will be 4 units on each floor 2nd-4th, and a penthouse unit that steps back 10 or 12 ft. for a total of 13 units. Mark Pingel, Chair said this is information enough for initial comments from board members: Mike – in favor of more building downtown. 1. Pointed out that the design standards in the Urban Core district require buildings to be within zero to 12 ft. and to be built out to 80% of the property frontage of both streets. This does not, so variances will be required. 2. The UDO for commercial mixed use district design standards says “all buildings must be oriented toward a primary public street” which in this case (regardless of where the property is narrower) is Church St. and the building is not oriented toward that. 3. “All public entrances must include a direct pedestrian connection which may not be set back more than 10 ft. from the building line” – not sure this design does that. 4.“Commercial store fronts must include traditional pedestrian oriented elements”, this will retain a gas station appearance. Mike pointed out that this board does not consider economic impact ($300,000 spent on new utilities). He is in favor of the development and if the applicant were to present something that looked at the entire buildout of the site instead of just phase 1, post gas station, that might make more sense to the board. Tonya said the plan is very conceptual and they will also be required to go to the ZBA. Tony – a gas station in the Urban Core T-6 is not a permitted use. The gas station that’s currently there is a pre-existing, non-conforming use. There’s a change of use and that’s what’s being considered. If they want to renovate the gas station, that’s permissible. If they want to introduce another use on this property (mixed use ENGINEERING AMERICA CO. 76 WASHINGTON ST. SARATOGA SPRINGS, NY 12866 518 / 587-1340 518 / 580-9783 (FAX) TRANSMITTAL SHEET TO: FROM: Planning Board Tonya Yasenchak COMPANY: DATE: City of Saratoga Springs SEPTEMBER 25, 2024 FAX NUMBER: TOTAL N O. OF PAGES INCLUDING COVER: 6 PHONE NUMBER: SENDER’S REFERENCE NUMBER: RE: YOUR REFERENCE NUMBER: Tanner – (2) Lot Subdivision Water, Sewer & Basic SWPPP  URGENT  FOR REVIEW  PLEASE COMMENT  PLEASE REPLY  AS REQUESTED ENGINEERING REPORT: INTRODUCTION: Engineering America Co. has been retained by the applicants, Allen P. Tanner to provide land planning and site/civil engineering services in connection with the subdivision application for # 16 Marion Ave. at the corner of Marion Ave. & Avenue A in the City of Saratoga Springs, Tax Map # 153.17-1-8. Subdivision approval will be required from the Planning Board which includes all requirements listed on the City of Saratoga’s Preliminary/Final Subdivision Approval Required Submittal Checklist. This report is intended to fulfill items 4 & 6 of the Required Items part of the Preliminary / Final Subdivision approval checklist. DESCRIPTION OF INTENDED SITE DEVELOPMENT & USE: The site, #16 Marion Ave. is located at the North West intersection of Marion Ave (aka NYS Rte. 9) and Avenue A in Saratoga Springs New York. The 14,580 sq.ft. lot currently has two existing structures with (3) total dwelling units. An existing (2) family dwelling is accessed via paved driveway from Avenue A. An existing (1) family dwelling is accessed via gravel driveway from Marion Ave. The lot area is nearly level across the property. The property is mostly grassy with lawn and a few larger mature trees along both street frontages. 2 The proposed subdivision of this parcel would result in dividing the single lot into two lots. The existing (2) family dwelling located on Avenue A would be located on a 6,970 sq.ft lot (designated as Lot 1 on the map). The existing driveway access off of Avenue A would remain unchanged. The existing electrical utility connection overhead from a utility pole on the South side of Avenue A remains unchanged. The new lot (designated as Lot 2 on the map), will be created at the corner of Marion Ave. & Avenue. The existing (1) family dwelling located at the East of the existing property will remain but be modified. The one story portion of this existing structure and exterior stairway will be demolished to allow for the new interior lot line created. The new Lot 2 is proposed to be 7,609 sq.ft. in area. Zoning Variances were granted by the City of Saratoga Zoning Board of Appeals on June 10, 2024 (ZBA #20240196) as follows: - Lot #1: Front Setback – 10’ req./ 3.7’ proposed / 6.3’ variance (63% relief) granted - Lot #2: Rear Setback – 25’ req. / 3.7’ proposed / 21.3’ variance (85.2%) relief granted Compliance with the requirements of Table 3-A of the City of Saratoga Springs Unified Development Ordinance (UDO) for the lots within a UR-2 District is as shown on the subdivision plat pages S2 & S3 WATER REPORT : Currently, there are 2 bedrooms within the existing two-family dwelling which will be on the resulting Lot #1. There are (2) bedrooms within the existing single-family dwelling which will be on the resulting Lot #2. Using a standard demand of 110 gallons per capita day (gpcd) the existing properties can be estimated to have an annual water consumption usage of 160,600 gallons. As the residences are proposed to remain, there is no assumed increase of the water usage. In addition, each structure has it’s own water connection to a water main within Avenue A. The are no proposed modifications to the existing lines or existing connections. SANITARY REPORT : Currently, there are 2 bedrooms within the existing two-family dwelling which will be on the resulting Lot #1. There are (2) bedrooms within the existing single-family dwelling which will be on the resulting Lot #2. Using a standard demand of 110 gallons per capita day (gpcd) the existing properties can be estimated to have an annual sanitary sewer load of approximately 160,600 gallons. 3 Each building has a separate sewer line connection to the sewer main located within Avenue A. As the residences are proposed to remain, there is no assumed increase of the overall sanitary sewer load. There are also no modifications proposed to the existing sewer lines or sewer connections. STORMWATER & BASIC SWPPP / EROSION CONTROL SOIL CONDITIONS: The project site (in location of the proposed current residences is relatively flat. Soils on this site are WnB (Windsor B) according to Saratoga County Soil surveys. the depth to any restrictive feature in this soil type is typically greater than 60”. The soil is classified as very deep, excessively drained, rapid permeability, slow surface runoff and slight erosion hazard. SEDIMENT & EROSION CONTROL: A sediment and erosion control plan has been developed in order to specify minimum controls and measures to reduce sediment runoff during construction. - Construction Entrance: One construction entrance has been specified to accommodate the new driveway off of Avenue A to the proposed existing residence on the new Lot #2. - Topsoil: A potential topsoil storage area for grading backfill will be identified (possibly located at the North East corner of the new lot #2) and will be surrounded by silt fencing. In general, excavation is proposed to be limited to the site modifications as relative to the demolition of the existing one story portion of structure on Lot #2. Excavations following demolition is anticipated to be limited to grading and seeding of a new lawn area. All demolition materials shall be removed from the site & not buried. No soil is proposed to be removed from the site. - Concrete Wash: A Concrete washout location has been proposed at the Eastern portion of the new Lot #2 towards Marion Ave. Concrete washout details and instructions are include on page S-4 of the subdivision development plans. - Sediment Control: Less than 0.06 acres are anticipated to be disturbed during demolition of the existing portion of building and construction of the new driveway on Lot #2. Silt fencing has been specified around the perimeter of the new lot project area to reduce off site erosion migration. Woodland Dwellings with basements Septic Tank Absorption Fields WnB—Windsor loamy sand, undulating Surface layer: Substratum: Soil Properties Permeability: Available water capacity (average for 40-inch profile): Soil reaction: Surface runoff: Erosion hazard: Depth to water table: Depthtobedrock: Flooding hazard: Use and Suitability Cropland Pasture Recreation Woodland Dwellings with basements Septic Tank Absorption Fields WnC—Windsor loamy sand, rolling Surface layer: Subsoil: Substratum: Soil Properties Permeability: Available water capacity (average for 40-inch profile): Soil reaction: Surface runoff: Erosion hazard: Depth to water table: Depthtobedrock: Flooding hazard: Use and Suitability Cropland Pasture Recreation Woodland Dwellings with basements City of Saratoga Springs Complete Streets Checklist 1 City of Saratoga Springs Complete Streets Checklist Project Name: __________________________________________________ Date: ____________________ Project Location / Limits: __________________________________________________________________ Project Description: ______________________________________________________________________ Instructions: For each box checked, please provide a brief description for how the item is addressed, not addressed, or not applicable and include supporting documentation. Street Classification (identify street or streets within the project area) Principal arterial Minor arterial Mixed use collector Mixed use local Residential collector Residential local Special use street EXISTING CONDITIONS Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description Existing Bicycle & Pedestrian Operations Do bicycle and pedestrian accommodations exist? (see page 2 for examples) Existing Transit Operations Do transit facilities exist within the study area, including bus and train stops/stations? Is the project area on a transit route? (CDTA Service Routes) Are there bicycle racks, shelters, or parking for transit riders available? Existing Access and Mobility Do connective opportunities exist with schools, hospitals, senior care or community centers or persons with disabilities within project area? Are there gaps inhibiting continuous access between schools, hospitals, senior care, or community centers or persons with disabilities within project area?” Project Area Context Are there prominent landmarks, recreation, shopping, employment center, cultural centers or other key destinations that offer opportunities to connect this site? Please list and/or describe planning or policy documents addressing bicyclist, pedestrian, transit, or truck/ freight use for the project area. Examples can include: City of Saratoga Springs Comprehensive Plan, City of Saratoga Springs Open Space Plan, Capital District Transportation Committee Bicycle/ Pedestrian Priority Network, City Standard Details, etc. Saratoga Springs Complete Street Policy Vision (May 2012) The City of Saratoga Springs Complete Streets Policy will encourage the development of a complete streets network throughout the City to create a more balanced transportation system. The Policy shall be consistent with and assist in achieving the goals and recommendations set forth in the City’s Comprehensive Plan and other policy documents. The Policy shall ensure new and updated public and private projects are planned, designed, maintained and operated to enable safer, comfortable and convenient travel to the greatest extent possible for users of all abilities including pedestrians, bicyclists, motorists and transit riders. This checklist is intended to assist the City in achieving its vision for complete streets. City of Saratoga Springs Complete Streets Checklist 2 PROPOSED DESIGN Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description Complete Streets Design Bicyclist accommodations? Pedestrian accommodations? Access and Mobility accommodations? Transit accommodations? Truck/ freight accommodations? Streetscape elements? Bike Facilities: Off-roadway bike accommodations Yes No NA Dedicated bike lane Yes No NA Shared-use lane Yes No NA Shoulder Yes No NA Acceptable actuated traffic signal bike detection, including turn lanes Yes No NA Do signals allow adequate minimum green time for bicyclist to safely cross intersection? Yes No NA Signage and pavement markings specific to proposed bike facilities Yes No NA Bicycle safe inlet grates Yes No NA Bicycle parking, eg. bike racks, bike lockers Yes No NA Transit Facilities: Transit shelters Yes No NA Bus turnouts Yes No NA Standing pads Yes No NA Has CDTA been contacted? Yes No NA Access and Mobility Facilities: Adequate sidewalk or paved path Yes No NA Acceptable consideration/provision for accessible pedestrian traffic signal features Yes No NA Curb ramps, including detectable warning surface Yes No NA Acceptable slope and cross-slope for driveway ramps, sidewalks, crossings) Yes No NA Have conflicts been reduced among pedestrian, bicyclists, and motor vehicles (access management)? Yes No NA Pedestrian Facilities: Sidewalks on both sides of the street Yes No NA Striped crosswalks Yes No NA Geometric modifications to reduce crossing distances such as curb extensions (e.g. bulb-outs) Yes No NA Acceptable provision for pedestrian traffic signal features (e.g. ped. buttons) Yes No NA Pedestrian signage for crossing & wayfinding Yes No NA Safety islands/medians on roadways with two or more traffic lanes in each direction Yes No NA Enhanced supplemental pedestrian treatments at uncontrolled marked crossings Yes No NA Connectivity: Are there proposed connections to other bike paths, pedestrian facilities, or transit facilities? Yes No NA Are there proposed connections to any key destinations listed on page 1? Yes No NA Are there proposed connections to neighborhoods? Yes No NA Streetscape Elements: Are streetscape elements proposed such as landscaping, street trees, planters, buffer strips, etc? Yes No NA Pedestrian-level lighting Yes No NA Public seating or benches Yes No NA Design Standards and Guidelines Design meets guidelines such as described below for bicycle/pedestrian/bus/transit facilities? Yes No NA Describe *American Association of State Highway and Transportation Officials (AASHTO) - A Policy on Geometric Design of Highway and Streets, Guide for the Development of Bicycle Facilities and AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities; Public Right-of-Way Accessibility Guide(PROWAG); Manual on Uniform Traffic Control Devices (MUTCD); Americans with Disabilities Act Accessibility Guidelines (ADAAG); National Association of City Transportation Officials (NACTO) - Urban Bikeway Design Guide. New York State Department of Transportation – Highway Design Manual Cost Estimate for Letter of Credit: 16 Marion Ave & Avenue A Planning Board No.: # 2024…. Project: Tanner - (2) Lot Minor Subdivision Location: # 16 Marion Ave. & Avenue A Saratoga Springs, NY Date: 9/24/2024 Firm Name & Preparer: Engineering America Co. - Tonya Yasenchak, PE Page 1 of 3 On Site (All infrastructure & amenities on private property) Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 1 Clearing & Grubbing 0 Lot $1,500.00 $0.00 0%$0.00 2 Rough Grading 103 CY $6.00 $618.00 0%$618.00 3 Silt Fence 252 LF $4.00 $1,008.00 0%$1,008.00 4 Construction Entrance 1 EA $250.00 $250.00 0%$250.00 5 Tree / Buffer Protection 0 LF $0.00 $0.00 0%$0.00 6 Misc. Erosion Control Measures 0 EA $0.00 $0.00 0%$0.00 Demolition 7 Building Removal (House, Garage & Shed)1 EA $8,000.00 $8,000.00 0%$8,000.00 8 Asphalt Removal (Cut for Utilities)0 SF $4.00 $0.00 0%$0.00 9 Concrete Removal (On-Site Sidewalk removal)0 SF $4.00 $0.00 0%$0.00 Hard Scape 10 Stone Subbase (Driveway)9 CY $25.00 $225.00 0%$225.00 11 Asphalt Pavement (Driveway)480 SF $13.00 $6,240.00 0%$6,240.00 12 CIP Curbing 0 LF $20.00 $0.00 0%$0.00 13 Concrete Sidewalk 0 SF $0.00 $0.00 0%$0.00 14 Retaining Wall 0 LF $0.00 $0.00 0%$0.00 Site Amenities 15 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 16 Striping 0 LS $0.00 $0.00 0%$0.00 17 Crosswalk 0 LS $0.00 $0.00 0%$0.00 18 Bench 0 EA $0.00 $0.00 0%$0.00 19 Bike Rack 0 EA $0.00 $0.00 0%$0.00 20 Site Lighting 0 EA $0.00 $0.00 0%$0.00 21 Fencing 0 LF $0.00 $0.00 0%$0.00 Site Water 22 6" DIP Class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 23 3/4" Type K Copper Water Service 0 EA $2,000.00 $0.00 0%$0.00 24 1" Type K Copper Water Service 0 EA $0.00 $0.00 0%$0.00 25 Water Fittings 0 LS $0.00 $0.00 0%$0.00 26 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 Tanner Subdiv - Cost Estimate Rev 8-26-24 Page 2 of 3 Item #Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary 27 6" SDR-26 Sanitary Line & Stone 0 LF $0.00 $0.00 0%$0.00 28 8" SDR-26 Sanitary Line & Stone 0 LF $0.00 $0.00 0%$0.00 29 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Site Storm 30 6" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 31 12" HDPE Storm Drain & Stone 0 LF $0.00 $0.00 0%$0.00 32 Catch Basin 0 EA $0.00 $0.00 0%$0.00 33 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 34 Yard Drains 0 EA $0.00 $0.00 0%$0.00 Stormwater Management 35 Bioretention Area 0 EA $0.00 $0.00 0%$0.00 36 UG Infiltration Chambers 0 EA $0.00 $0.00 0%$0.00 37 Hydrodynamic Separator 0 EA $0.00 $0.00 0%$0.00 38 Wet Pond 0 EA $0.00 $0.00 0%$0.00 Landscaping 39 Topsoil/Seed/Mulch 103 CY $25.00 $2,575.00 0%$2,575.00 40 Deciduous Trees 0 EA $0.00 $0.00 0%$0.00 41 Shrubs 0 EA $0.00 $0.00 0%$0.00 Total onsite Work $18,916.00 $18,916.00 Total onsite X.25 $4,729.00 $4,729.00 Off Site (All infrastructure & amenities to be dedicated to the City) Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Demolition 42 Asphalt Removal (Cut for Utilities)0 SF $4.00 $0.00 0%$0.00 43 Concrete Removal (Cut sidewalk for new drive)0 SF $4.00 $0.00 0%$0.00 Road Construction 44 Stone Subbase 3 CY $30.00 $75.00 0%$75.00 45 Asphalt Pavement (Binder)120 SF $10.00 $1,200.00 0%$1,200.00 46 Asphalt Pavement (Top)120 SF $13.00 $1,560.00 0%$1,560.00 47 Concrete Curbing 130 LF $20.00 $2,600.00 0%$2,600.00 48 Concrete Sidewalk 650 SF $7.50 $4,875.00 0%$4,875.00 Site Amenities 49 Traffic Signs 0 EA $0.00 $0.00 0%$0.00 50 Striping 0 LS $0.00 $0.00 0%$0.00 51 Crosswalk 0 LS $0.00 $0.00 0%$0.00 52 Street Signs 0 EA $0.00 $0.00 0%$0.00 53 Decorative Street Light 2 EA $3,550.00 $7,100.00 0%$7,100.00 Off Site Water 54 6" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 55 6" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 56 8" DIP class 52 Water Main 0 LF $0.00 $0.00 0%$0.00 57 8" Mueller Gate Valve 0 EA $0.00 $0.00 0%$0.00 58 S.S. Tapping Sleeve and Valve Connection 0 EA $0.00 $0.00 0%$0.00 Tanner Subdiv - Cost Estimate Rev 8-26-24 59 3/4" Corp, WSO and Type K water service to PL 0 EA $1,500.00 $0.00 0%$0.00 60 1" Corp, WSO and Type K water service to PL 0 EA $1,500.00 $0.00 0%$0.00 61 Water Fittings 0 LS $0.00 $0.00 0%$0.00 62 Fire Hydrant Assembly 0 EA $0.00 $0.00 0%$0.00 63 Testing & Disinfection 0 LS $250.00 $0.00 0%$0.00 Page 3 of 3 Item #Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Site Sanitary 64 SDR-35 6" Sanitary Service to PL & Stone 0 EA $1,500.00 $0.00 0%$0.00 65 SDR-35 8" Sanitary Main & Stone 0 LF $0.00 $0.00 0%$0.00 66 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 67 Kor N' Seal connection 0 EA $150.00 $0.00 0%$0.00 Site Storm 68 12" HDPE Storm Line & Stone 0 LF $0.00 $0.00 0%$0.00 69 Catch Basin 0 EA $0.00 $0.00 0%$0.00 70 Manhole Structure 0 EA $0.00 $0.00 0%$0.00 Landscaping 71 Topsoil/Seed/Mulch 12 CY $15.00 $180.00 0%$180.00 72 Removal of Trees in R.O. W 0 EA $0.00 $0.00 0%$0.00 73 Street Trees 2 EA $550.00 $1,100.00 0%$1,100.00 Misc. 74 As-built Drawing 1 LS $3,250.00 $3,250.00 0%$3,250.00 Total offsite Work $21,940.00 $21,940.00 Total On-Site Work X25%$4,729.00 Total Off-Site work $21,940.00 Total LOC Amount = $26,669.00 * New LOC Reduced Amount = $26,669.00 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $6,667.25 Tanner Subdiv - Cost Estimate Rev 8-26-24