Loading...
HomeMy WebLinkAbout20251031 19 Washington St Adelphi/Bethesda Site Plan 30 Washington St Engineering Report 1.21.2026 Engineering Report Water and Sanitary Sewer For 30 Washington Street Saratoga Springs, New York PB # 20251025 Prepared For: Adelphi Owner, LLC 353 Broadway Saratoga Springs, NY 12866 Prepared By: The LA Group, P.C. 40 Long Alley Saratoga Springs, New York 12866 January 16, 2026 PROJECT DESCRIPTION The project is located at 30 Washington Street in the City of Saratoga Springs, New York. It involves relocating the existing stone building from the Adelphi site to this location, where it will be installed west of the Bethesda Church. The relocated building will serve as office and gathering space for the church. EXISTING CONDITIONS Water Distribution – A 10” City of Saratoga Springs watermain is located on the south side of Washington Street along the frontage of the subject parcel. Sanitary Sewer – A 12” vitrified clay sanitary main runs along the center of Washington Street. This sanitary main flows via gravity to the Saratoga County Sewer District Pump Station at High Rock Avenue and Warren Street. From the pump station the wastewater is pumped to County trunk lines and the treatment plant in Mechanicville. SEWER AND WATER USAGE The table below provides information on the anticipated average potable water use and wastewater flow rates for the project. Water use and wastewater flow are estimated to be equal for this study. Table - Average Daily Flow (ADF) Office: (10 employees) x (15 gpd/employee)1 150 gpd Total 150 gpd Summary of Design Flows Peak flow is estimated to be 4.8 gallons per minute (gpm) per Table 604.3 of the 2025 NYS Plumbing Code based on all building fixtures simultaneously being used. PROPOSED CONDITIONS Water Distribution – To serve the project a new ¾” copper water service will be provided off the 10” municipal water main in Washington Street. The building will not be sprinklered and will require domestic water service only. The nearest fire hydrant is located at the northwest corner of the church building on the site. Sanitary Sewer – A new 6” SDR-26 sewer lateral will provide sanitary sewer service for the building. The new lateral will connect to the existing 12” City sanitary main in Washington Street. 1. From Table B-3, NYSDEC Design Standards for Intermediate Sized Wastewater Treatment Systems, dated March 5, 2014