Engineering Report
Water and Sanitary Sewer
For
19 Washington Spa Building
Saratoga Springs, New York
PB # 20251031
Prepared For:
Adelphi Owner, LLC
353 Broadway
Saratoga Springs, NY 12866
Prepared By:
The LA Group, P.C.
40 Long Alley
Saratoga Springs, New York 12866
January 16, 2026
PROJECT DESCRIPTION
The project is located at 19 Washington Street in the City of Saratoga Springs, New York. It
involves relocating the existing stone building to the Bethesda Church site and constructing a
new two-story spa building with an associated pool on the original site. The new spa building is
intended to serve approximately 30 patrons per day from the Adelphi condominium and hotel
building.
EXISTING CONDITIONS
Water Distribution – A 10” City of Saratoga Springs watermain is located on the south side of
Washington Street. The size of the water service to the stone building is unknown but is believed
to be serviced off the 10” watermain. An existing curb stop is located at the southeast corner of
the building, directly behind the Washington Street curb.
Sanitary Sewer – A 12” vitrified clay sanitary main runs along the center of Washington Street.
This sanitary main flows via gravity to the Saratoga County Sewer District Pump Station at High
Rock Avenue and Warren Street. From the pump station the wastewater is pumped to County
trunk lines and the treatment plant in Mechanicville. The size and location of the existing sewer
service to the stone building is unknown. A 6” SDR PVC sewer line is located to the east of the
stone building that services a portion of the Adelphi condo building.
SEWER AND WATER USAGE
The table below provides information on the anticipated average potable water use and
wastewater flow rates for the project. Water use and wastewater flow are estimated to be equal
for this study.
Table - Average Daily Flow (ADF)
Pool and Bath House: (30 patrons) x (10 gpd/patron)1 300 gpd
Total 300 gpd
Summary of Design Flows
Peak flow is estimated to be 20.45 gallons per minute (gpm) per Table 604.3 of the 2025 NYS
Plumbing Code based on all building fixtures simultaneously being used.
PROPOSED CONDITIONS
Water Distribution – To serve the project, the existing water service to the stone building will be
uncovered to evaluate the pipe size and condition. If the pipe is found to be in satisfactory
condition, it will be reused. If the existing lateral is not in good condition then a new 1” copper
water service will be provided to service the building. The proposed building will not be
sprinklered and will require domestic water service only. The nearest fire hydrant is located on
the south side of Washington Street, directly across from the site.
Sanitary Sewer – Sanitary sewer service for the spa building will connect to the existing 6-inch
PVC sewer line that serves the condominium building. A portion of the new building will be
constructed over this line, requiring protection of the pipe during construction. The new sewer
connection to the existing 6-inch line will be made within the building footprint. The existing
sewer service will be capped and abandoned at the property line.
1. From Table B-3, NYSDEC Design Standards for Intermediate Sized Wastewater Treatment Systems,
dated March 5, 2014