HomeMy WebLinkAbout20250989 Rt 9 / South Broadway Special Use Permit Traffic Impact Assessment 12/26/2025
1396 White Bridge Road
Chittenango, NY 13037
Tel: (315) 391-5110
November 22, 2025
Bohler Engineering
17 Computer Drive West
Albany, NY 12205
Attn: Mr. Steve Wilson
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
Dear Mr. Wilson:
I have completed my review of traffic operations associated with the proposed mixed use development
on the east side of US Route 9 in Saratoga Springs, NY. This letter summarizes the work completed in
this review as well as my findings.
Project Understanding
The project site is located on the east side of US Route 9 (South Broadway), immediately south of the
Homewood Suites hotel, in Saratoga Springs, NY. The site is currently vacant. The proposed
development includes approximately 200 apartments with a mix of retail/office uses on the first floor
of each building, and an 80 room hotel. Access will be provided to/from US Route 9 via two full
access driveways located approximately 310 feet and 580 feet to the south of Homewood Suites
driveway.
Conceptual site plans prepared by Bohler have been attached.
Data Collection
Site visits were conducted on Thursday, November 6th and Saturday, November 8th, 2025 to collect the
following information:
• Existing Traffic Volume Counts – Traffic turning movement counts were collected at
intersections of US Route 9 with Crescent Avenue and E West Road during the weekday
morning (7-9am) and evening (4-6pm) peak travel periods on the 6th, and during the Saturday
midday (11am-1pm) peak travel period on the 8th, to ensure that actual peak hours of the
adjacent street were captured. The traffic counts included separate heavy vehicle counts on
each approach and pedestrians.
• US Route 9 Gap Data – Gap data was collected to assess the ability for vehicles to turn in and
out of the site driveways on US Route 9. In order for a vehicle to turn right out of either
driveway, or left into either driveway, the vehicle only requires a gap in the northbound
direction on US Route 9. A vehicle requires a gap in traffic in both directions at the same time
to turn left out of either driveway onto US Route 9. These gaps in traffic were observed and
Mr. Wilson
November 22, 2025
Page 2 of 8
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
timed on US Route 9 passing the site during the three traffic count periods. The gaps were then
converted to a number of vehicles that could turn left or right out of the proposed site
driveways during each gap and then totaled for the peak hour. For example, one vehicle can
turn from the driveway with a 6-9 second gap in traffic, two can turn with a 10-13 second gap,
3 with a 14-17 second gap, 4 with an 18-19 second gap, etc.
• Spot Speed Measurements – 50 speed measurements were collected in each direction on US
Route 9 to identify average and 85th percentile operating speeds in the area passing the site.
The data was collected for free flow traffic during off-peak times. The weather was sunny and
the roadway was dry.
• Sight Distance Measurements – Sight lines looking north/south along US Route 9 from the site
driveways were collected for comparison to design standards in order to confirm that adequate
sight lines are available for safe ingress and egress from the site.
• Operational Data - Other data needed to evaluate traffic operations, such as intersection
geometry, control, and speeds limits were also collected. Existing signal timing data was
obtained from NYSDOT to ensure that the signals at the study area intersections were properly
modeled.
Existing Operations
US Route 9 is classified as a principal urban arterial roadway that has two lanes in each direction with
a two way center left turn lane through the study area. There is an auxiliary southbound left turn lane
at the Crescent Avenue intersection. There is an auxiliary northbound left turn lane and an auxiliary
southbound right turn lane at the E West Road intersection. The posted speed limit on US Route 9 is
35 mph.
The US Route 9/Crescent Avenue intersection is control by a fully actuated, uncoordinated traffic
signal under the jurisdiction of NYSDOT (#5011). The signal operation includes protected/permitted
southbound left turn phasing.
The US Route 9/E West Road intersection is control by a fully actuated, uncoordinated traffic signal
under the jurisdiction of NYSDOT (#5038). The signal operation includes protected/permitted
northbound left turn phasing.
Based on the traffic counts collected, the peak hours were identified as follows:
Weekday Morning Peak Hour – 7:30 am to 8:30am
Weekday Evening Peak Hour – 4:30pm to 5:30pm
Saturday Midday Peak Hour – 12:00pm to 1:00pm
Mr. Wilson
November 22, 2025
Page 3 of 8
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
The 2025 existing traffic volumes collected in November are shown in the attached Figure 1 for the
weekday morning, weekday evening, and Saturday midday peak hours. The traffic count data has been
attached
The existing traffic counts were reviewed and compared to historical traffic volume data on US Route
9 to identify necessary adjustments, if any, to account for seasonal variations. Specifically, July 9th,
10th, and 11th, 2024 directional traffic counts on US Route 9 to the north of E West Road were taken
from the NYSDOT Traffic Data Viewer website and reviewed.
The averaged July 2024 traffic counts on US Route 9 had 969 vehicles northbound/680 vehicles
southbound during the weekday morning peak hour, and 952 vehicles northbound/950 vehicles
southbound during the weekday evening peak hour passing the site. Based on the 2025 counts
collected for this study, there were 959 vehicles northbound/752 vehicles southbound during the
weekday morning peak hour, and 961 vehicles northbound/1019 vehicles southbound during the
weekday evening peak hour. The combined directional counts collected in 2025 are 4% higher than
the 2024 counts during both peak hours. The historical count data has been attached.
Since the 2025 traffic counts collected in November are higher than the 2024 July traffic counts during
both the morning and evening peak hours, there were no adjustments made to the existing traffic
volumes.
Based on the gap data collected, there are sufficient gaps in traffic to accommodate over 260 vehicles
turning right onto US Route 9 from either driveway during each peak hour. These gaps would also be
available for vehicles turning left into either driveway. There were sufficient gaps observed to
accommodate 100 or more vehicles turning left out of either driveway onto US Route 9 during the
three peak hours. There are no concerns with available gaps in traffic to accommodate the proposed
development. The gap data is attached.
The posted speed limit passing the site is 55 mph on US Route 9. The speed data collected on US
Route 9 indicates that the average speeds passing the site are 53 mph northbound and 55 mph
southbound. The 85th percentile speeds based on the data collected are 57 mph northbound/57.5 mph
southbound on US Route 9 passing the site. The speed data has been attached.
The following table provides a summary of the recommended sight distances along US Route 9 from
the AASHTO A Policy on Design of Highways and Streets as well as the available sight distances at
the two driveway locations based on field measurements. The speed limit in the area is 55 mph on US
Route 9, however the speed data collected indicates that the operating speed is closer to 60 mph in both
directions. Therefore 60 mph was used for the sight distance review. The recommended sight distance
for vehicles turning left out of the driveways was adjusted to account for the second northbound lane
and center turn lane that need to be crossed when exiting the site.
Mr. Wilson
November 22, 2025
Page 4 of 8
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
Sight Distance Summary
Location
Operating
Speed
Direction
AASHTO
Recommended
Sight Distance
Available
Sight Distance
North Access @
US Route 9 – Turning Left 60 mph Looking Left
Looking Right
750 feet
750 feet
1,500+ feet
1,500+ feet
North Access @
US Route 9 – Turning Right 60 mph Looking Left 575 feet 1,500+ feet
South Access @
US Route 9 – Turning Left 60 mph Looking Left
Looking Right
750 feet
750 feet
1,500+ feet
1,500+ feet
South Access @
US Route 9 – Turning Right 60 mph Looking Left 575 feet 1,500+ feet
There are more than adequate sight distances available in both directions on US Route 9 from both
driveways. There are no concerns with sight distances and safety for ingress and egress from either
roadway.
Capacity analysis of the existing traffic operations was completed using Synchro12, the industry
accepted standard for the analysis of both signalized and unsignalized intersections that is based on
methodologies developed in the Highway Capacity Manual. Intersection and individual movement
operations are graded in terms of Level of Service ranging from A to F, as described in the HCM. For
example, an unsignalized intersection movement with an average delay of 5 seconds per vehicle is
considered a Level of Service A while an average delay per vehicle of 20 seconds is considered a C. A
Level of Service D or better is generally considered acceptable for a signalized intersection while a
Level of Service E or better is generally considered acceptable for an unsignalized intersection.
The Synchro capacity analysis of the existing traffic operations indicates that all traffic movements in
the study area are operating at an acceptable Level of Service C or better during all three peak hours.
The detailed Level of Service and queue summary, and capacity analysis printouts, have been attached.
There are no concerns with existing traffic operations on US Route 9 in the vicinity of the project site
as there are ample gaps in traffic and clear sight lines in both directions. There are no capacity
concerns with traffic turning on or off US Route 9 at the study area intersections. These findings are
consistent with observations made during the data collection effort.
Accident Analysis
An accident analysis was completed for US Route 9 between Crescent Avenue and E West Road using
history reports obtained for a three year period from March 2022 through February 2025.
Mr. Wilson
November 22, 2025
Page 5 of 8
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
Over the three year period, there were 19 total accidents in the study area. There were 5 accidents at
the Crescent Avenue intersection (3 rearend accidents and 2 left turn accidents), 4 accidents at the E
West Road intersection (4 rearend accidents), and 10 midblock accidents along US Route 9 (5 animal
related accidents, 3 fixed object accidents, 1 right angle accident, and 1 left turn accident).
Based on the US Route 9/Crescent Avenue intersection geometry and annual average daily traffic
volumes, the predicted NYSDOT Safety Performance Function is 2.58 total accidents per year and
0.87 injury/fatality accidents per year. The calculated number of total accidents per year were 1.66.
The calculated number of injury/fatality accidents per year were 0.00. This intersection has been
identified to have a LOSS 2 rating based on total accident history and LOSS 2 rating based on injury
accident history. This is not considered a severe accident location.
Based on the US Route 9/E West Road intersection geometry and annual average daily traffic volumes,
the predicted NYSDOT Safety Performance Function is 1.59 total accidents per year and 0.56
injury/fatality accidents per year. The calculated number of total accidents per year were 1.33. The
calculated number of injury/fatality accidents per year were 0.33. This intersection has been identified
to have a LOSS 2 rating based on total accident history and LOSS 2 rating based on injury accident
history. This is not considered a severe accident location.
Based on the US Route 9 roadway geometry and annual average daily traffic volumes, the predicted
NYSDOT Safety Performance Function is 21.74 total accidents per year and 4.46 injury/fatality
accidents per year. The calculated number of total accidents per year were 3.33. The calculated
number of injury/fatality accidents per year were 0.33. This roadway segment has been identified to
have a LOSS 2 rating based on total accident history and LOSS 2 rating based on injury accident
history. This is not considered a severe accident roadway.
Overall, there were 17 property damage only accidents with 2 injury accidents and no fatality
accidents.
The detailed accident summary and calculations have been attached.
2028 Background Operations
The proposed mixed use development is expected to be completed over approximately 3 years,
therefore 2028 was used as the design year for this study. In order to fully understand the impacts of
the development on the adjacent roadway system, analysis of the operations immediately before the
project completion must first be completed. The existing traffic volumes were first adjusted by a
growth rate to account for any unknown development that may occur prior to completion of the
project.
Mr. Wilson
November 22, 2025
Page 6 of 8
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
Historical traffic volumes along US Route 9 passing the site, and along Crescent Avenue to the east of
US Route 9, were taken from the NYSDOT Traffic Data Viewer website and reviewed in order to
identify an appropriate background growth rate. Long term growth rates in the area have been positive
on US Route 9 around +1.1% per year and negative on Crescent Avenue around -2.8% per year
between 2015 and 2024. In order to maintain a conservative analysis, a positive +1.0% per year
growth was chosen and used to grow the 2025 existing traffic volumes to the 2028 background
condition.
There are no known specific approved developments in the area that need to be included in the growth
projections.
The 2030 background traffic volumes with 1% growth per year (3% total) are shown in Figure 2.
Capacity analysis of the background operations indicates that there will be minor increases in delay
during all three peak hours. The analysis indicates that all traffic movements in the study area will
continue to operate at an acceptable Level of Service C or better during the three peak hours. The
detailed Level of Service and queue summary, and capacity analysis printouts, have been attached.
Trip Generation Estimate and Distribution
The proposed development includes approximately 200 apartments with a mix of retail/office uses on
the first floor of each building, and an 80 room hotel. Trips generated by the proposed development
were estimated using the ITE Trip Generation, 12th Edition, which is the industry accepted standard for
estimating traffic generated by new developments. Land Use 231 – Mid-Rise Residential with
Ground-Floor Commercial (25-65K), and Land Use 310 – Hotel, were used.
The following table summarizes the trip generation estimate for the proposed mixed use development
on US Route 9 in the Saratoga Springs.
Trip Generation Summary
Morning
Peak Hour
Evening
Peak Hour
Saturday
Peak Hour
Entering Exiting Entering Exiting Entering Exiting
Apartments – 200 Units 25 57 105 45 72 70
Hotel – 80 Rooms 14 13 19 18 19 18
Total Trips Generated 39 70 124 63 92 88
Many people expect that residential land uses will generate an average of 2 trips per unit during peak
hours. The trip generation rates for residential land uses are generally less than 1 trip per unit for a
number of reasons. The primary reason is that people work different times, some may leave for work
Mr. Wilson
November 22, 2025
Page 7 of 8
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
at 6:30 in the morning while others may leave at 7:30 or 8:30. Subsequently, the arrival patterns home
in the evening will also be staggered over multiple hours. Some people work evenings while others
may stay at home or work from home. The rates contained in the ITE Trip Generation have been
verified and provide an accurate representation of what may be expected for this development during
the peak hours of the adjacent streets.
The detailed trip generation calculations have been attached.
Overall, the mixed use development is expected to be a moderate traffic generator with 39 trips
entering/70 trips exiting during the morning peak hour, 124 trips entering/63 trips exiting during the
evening peak hour, and 92 trips entering/88 trips exiting during the Saturday peak hour.
Based on existing traffic patterns and population centers in the area, 50% of the new trips generated are
expected to travel to/from the south on US Route 9, 40% are expected to travel to/from the north on
US Route 9, and 10% are expected to travel to/from the east on Crescent Avenue. 10% of the traffic
traveling to the south is expected to Crescent Avenue to access I-87. The expected arrival/departure
distribution is shown in Figure 3. The trips generated are shown in Figure 4. The resultant full build
traffic volumes are shown in Figure 5.
Build Operations
Based on the projected turning movements on US Route 9 at the site driveways, there are more than
sufficient gaps available to accommodate the proposed development.
Capacity analysis of the build condition with the proposed mixed use development indicates that the
development will have only minor impacts on traffic operations at the existing signalized US Route 9
intersections with Crescent Avenue and E West Road. All traffic movements will continue to operate
at acceptable Levels of Service C or better during all three peak hours with the following minor drops
in Level of Service noted:
• US Route 9 @ Crescent Avenue
o WB Left/Right – LOS B to C - +3 seconds average delay – Morning Peak Hour
• US Route 9 @ E West Road
o EB Left/Right – LOS B to C - +1 seconds average delay – Evening Peak Hour
The site driveways are projected to operate at Level of Service C during all three peak hours with
minimal delays on US Route 9.
The detailed Level of Service and queue summary, and capacity analysis printouts, have been attached.
Mr. Wilson
November 22, 2025
Page 8 of 8
Re: Traffic Impact Study – Proposed Mixed Use Development
US Route 9, Saratoga Springs, NY
Conclusions
The additional traffic generated by the proposed mixed use development will have no notable or
significant impact on traffic operations on US Route 9. The development will only average 1-2
vehicles entering and exiting minute during the peak hours. There are excellent site lines at both
driveways exiting onto US Route 9, more than sufficient gaps in traffic to accommodate the
development, and no notable accident history in the area. There are no capacity concerns noted.
There are no off-site mitigation measures recommended.
If you have any questions or need additional information, please call.
Sincerely,
Gordon T. Stansbury, P.E., P.T.O.E.
GTS Consulting
Attachments – Site Plan Traffic Volume Figures 1-5
Gap Calculations Spot Speed Data
Growth Rate Calculations Trip Generation Estimate
Accident Data Count Data
Synchro Capacity Printouts
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Live / Work
9K SF
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Hotel
Future Parking Spaces
Additional Parking
August 1, 2025Mixed-Use Development, Route 9, Saratoga Springs, NY / Conceptual Site Plan
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Live / Work
9K SF
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Li
v
e
/
W
o
r
k
10
.
5
K
S
F
Hotel
Future Parking Spaces
Additional Parking
August 1, 2025Mixed-Use Development, Route 9, Saratoga Springs, NY / Conceptual Site Plan
Proposed Mixed Use Development
US Route 9 – Saratoga Springs, NY
Intersection Level of Service Summary
Weekday Morning Peak Hour
Intersection
Available
Storage
2023
Existing
2025
Background
2025
Build
LOS
Max
Queue
LOS
Max
Queue
LOS
Max
Queue
US Route 9 @
Crescent Avenue
B(11) B(11) B(12)
WB Left/Right - B(18) 45 B(19) 49 C(22) 61
NB Through/Right - B(16) 261 B(16) 274 B(16) 301
SB Left 200 A(5) 27 A(5) 28 A(6) 29
SB Through - A(5) 101 A(5) 107 A(5) 116
US Route 9 @
E West Road
A(3) A(3) A(3)
EB Left 400 B(16) 6 B(16) 6 B(17) 6
EB Right - B(13) 4 B(13) 4 B(13) 4
NB Left 375 A(2) 6 A(2) 6 A(2) 6
NB Through - A(1) 82 A(1) 85 A(1) 87
SB Through - A(6) 176 A(6) 183 A(6) 191
SB Right 200 A(6) 4 A(6) 4 A(6) 4
US Route 9 @
North Access
WB Left/Right - - - - - c(19) 18
NB Through - - - - - a(0) 0
SB Left 150 - - - - b(11) 3
SB Through - - - - - a(0) 0
US Route 9 @
South Access
WB Left/Right - - - - - c(18) 5
NB Through - - - - a(0) 0
SB Left 150 - - - - b(11) 0
SB Through - - - - - a(0) 0
B(12) – Signalized Level of Service (Average Delay per Vehicle in Seconds)
a(9) – Unsignalized Level of Service (Average Delay per Vehicle in Seconds)
Max Queue – 95th Percentile Queue in Feet
Proposed Mixed Use Development
US Route 9 – Saratoga Springs, NY
Intersection Level of Service Summary
Weekday Evening Peak Hour
Intersection
Available
Storage
2023
Existing
2025
Background
2025
Build
LOS
Max
Queue
LOS
Max
Queue
LOS
Max
Queue
US Route 9 @
Crescent Avenue
B(12) B(12) B(13)
WB Left/Right - C(24) 101 C(25) 108 C(29) 131
NB Through/Right - B(17) 272 B(17) 288 B(18) 316
SB Left 200 A(6) 33 A(6) 34 A(6) 37
SB Through - A(5) 118 A(5) 125 A(5) 145
US Route 9 @
E West Road
A(6) A(6) A(6)
EB Left 400 B(19) 14 B(20) 14 C(21) 14
EB Right - A(9) 9 A(9) 10 A(10) 10
NB Left 375 A(1) 3 A(1) 3 A(1) 3
NB Through - A(4) 76 A(4) 79 A(4) 86
SB Through - A(8) 235 A(8) 244 A(8) 252
SB Right 200 A(6) 5 A(6) 5 A(6) 5
US Route 9 @
North Access
WB Left/Right - - - - - c(21) 18
NB Through - - - - - a(0) 0
SB Left 150 - - - - b(12) 8
SB Through - - - - - a(0) 0
US Route 9 @
South Access
WB Left/Right - - - - - c(20) 5
NB Through - - - - a(0) 0
SB Left 150 - - - - b(11) 3
SB Through - - - - - a(0) 0
B(12) – Signalized Level of Service (Average Delay per Vehicle in Seconds)
a(9) – Unsignalized Level of Service (Average Delay per Vehicle in Seconds)
Max Queue – 95th Percentile Queue in Feet
Proposed Mixed Use Development
US Route 9 – Saratoga Springs, NY
Intersection Level of Service Summary
Saturday Midday Peak Hour
Intersection
Available
Storage
2023
Existing
2025
Background
2025
Build
LOS
Max
Queue
LOS
Max
Queue
LOS
Max
Queue
US Route 9 @
Crescent Avenue
B(13) B(13) B(14)
WB Left/Right - C(22) 96 C(23) 105 C(26) 124
NB Through/Right - B(18) 254 B(19) 273 B(20) 307
SB Left 200 A(6) 39 A(6) 42 A(7) 44
SB Through - A(5) 79 A(5) 86 A(5) 98
US Route 9 @
E West Road
A(7) A(7) A(7)
EB Left 400 C(21) 33 C(21) 34 C(22) 35
EB Right - B(11) 17 B(11) 18 B(11) 18
NB Left 375 A(2) 8 A(2) 8 A(2) 8
NB Through - A(3) 73 A(3) 77 A(3) 84
SB Through - B(11) 145 B(11) 151 B(11) 161
SB Right 200 A(7) 8 A(7) 8 A(7) 9
US Route 9 @
North Access
WB Left/Right - - - - - c(19) 23
NB Through - - - - - a(0) 0
SB Left 150 - - - - b(11) 5
SB Through - - - - - a(0) 0
US Route 9 @
South Access
WB Left/Right - - - - - c(18) 5
NB Through - - - - a(0) 0
SB Left 150 - - - - b(11) 3
SB Through - - - - - a(0) 0
B(12) – Signalized Level of Service (Average Delay per Vehicle in Seconds)
a(9) – Unsignalized Level of Service (Average Delay per Vehicle in Seconds)
Max Queue – 95th Percentile Queue in Feet
O
N
EW
GTS Consulting
Proposed Mixed Use Development - US Route 9 - Saratoga Springs,NY
Not to Scale
2025 Existing Traffic Volumes Collected November 6th & 8th, 2025
Weekday Morning (Weekday Evening) {Saturday Midday} Peak Hour
Figure 1
Proposed
Development
US Route 9
US Route 9
Crescent Avenue
E West Road
21
(7)
{29}
957
(952)
{871}
2 (9){33}2 (25){29}
2
(4)
{11}
750
(1015)
{644}
88 (87){101}
30 (53) {51}
959
(961)
{904}
0
(0)
{0}
836
(829){687}
71
(115)
{146}
752
(1019)
{655}
0
(0)
{0}
727
(871)
{584}
83
(112)
{127}
Weekday Morning Peak Hour -7:30-8:30pm
Weekday Evening Peak Hour - 4:30-5:30pm
Saturday Midday Peak hour - 12:00am-1:00pm
0 (0) {0}
0 (0) {0}
959
(961)
{904}
0
(0)
{0}
752
(1019)
{655}
0
(0)
{0}
0 (0) {0}
0 (0) {0}
O
N
EW
GTS Consulting
Proposed Mixed Use Development - US Route 9 - Saratoga Springs,NY
Not to Scale
2028 Background Traffic Volumes - With 1% Growth per Year (3% Total)
Weekday Morning (Weekday Evening) {Saturday Midday} Peak Hour
Figure 2
Proposed
Development
US Route 9
US Route 9
Crescent Avenue
E West Road
22
(7)
{30}
986
(981)
{897}
2 (9){34}2 (26){30}
2
(4)
{11}
773
(1045)
{663}
91 (90){104}
31 (55) {53}
988
(990)
{931}
0
(0)
{0}
861
(854){708}
73
(118)
{150}
775
(1049)
{674}
0
(0)
{0}
749
(897)
{602}
85
(115)
{131}
0 (0) {0}
0 (0) {0}
988
(990)
{931}
0
(0)
{0}
775
(1049)
{674}
0
(0)
{0}
0 (0) {0}
0 (0) {0}
O
N
EW
GTS Consulting
Proposed Mixed Use Development - US Route 9 - Saratoga Springs,NY
Not to Scale
Arrival / Departure Trip Distribution
New Trip Percentage
Figure 3
Proposed
Development
US Route 9
US Route 9
Crescent Avenue
E West Road
50%
40%
10%
40%
10%
40%
20%
30%
10%
40%
10%
10%
10%
40%
10%
40%
50%
30%
O
N
EW
GTS Consulting
Proposed Mixed Use Development - US Route 9 - Saratoga Springs,NY
Not to Scale
Trips Generated
Weekday Morning (Weekday Evening) {Saturday Midday} Peak Hour
Figure 4
Proposed
Development
US Route 9
US Route 9
Crescent Avenue
E West Road
20
(62)
{46}
28
(26)
{35}
4 (12) {9}
16
(50)
{37}
4
(12)
{9}
28
(25)
{35}
14
(12)
{18}
21
(19)
{26}
4
{12)
{9}
15
(50)
{37}
7 (6) {9}
7 (7) {9}
7
(6)
{9}
16
(50)
{37}
4
(12)
{9}
15
(50)
{37}
35 (31) {44}
21 (19) {26}
O
N
EW
GTS Consulting
Proposed Mixed Use Development - US Route 9 - Saratoga Springs,NY
Not to Scale
2028 Build Traffic Volumes
Weekday Morning (Weekday Evening) {Saturday Midday} Peak Hour
Figure 5
Proposed
Development
US Route 9
US Route 9
Crescent Avenue
E West Road
22
(7)
{30}
1006
(1043)
{943}
2 (9){34}2 (26){30}
2
(4)
{11}
802
(1071)
{698}
91 (90){104}
35 (67) {62}
1004
(1040)
{968}
4
(12)
{9}
889
(879){743}
87
(130)
{168}
796
(1068)
{700}
4
(12)
{9}
764
(947)
{639}
85
(115)
{131}
995
(996)
{940}
16
(50)
{37}
779
(1061)
{683}
15
(50)
{37}
7 (6) {9}
7 (7) {9}
35 (31) {44}
21 (19) {26}
Intersection Gap Study
Project: Proposed Mixed Use Development - US Route 9 - Saratoga Springs, NY
Date: 11/6/2025 & 11/8/2025
Intersection: Proposed Site Access @ US Route 9
Movement: Right Turns Exiting / Left Turns Entering
6-9 sec 10-13 sec 14-17 sec 18-19 sec 20-23 sec 24-25 sec 26-29 sec >29 sec Interval Hour
Time Interval x 1 x 2 x 3 x 4 x 5 x 6 x 7 x 8 Total Total
Morning Peak Hour
7:30-7:45am # of Gaps 17 8 6 1 1 0 2 1
# of Vehicles 17 16 18 4 5 0 14 8 82
7:45-8:00am # of Gaps 20 7 3 2 1 1 0 0
# of Vehicles 20 14 9 8 5 6 0 0 62
8:00-8:15am # of Gaps 15 7 4 3 1 1 0 1
# of Vehicles 15 14 12 12 5 6 0 8 72
8:15-8:30am # of Gaps 18 7 3 1 4 1 0 1
# of Vehicles 18 14 9 4 20 6 0 8 79 295
Evening Peak Hour
4:30-4:45pm # of Gaps 15 8 6 0 1 1 0 2
# of Vehicles 15 16 18 0 5 6 0 16 76
4:45-5:00pm # of Gaps 16 3 2 0 0 0 0 0
# of Vehicles 16 6 6 0 0 0 0 0 28
5:00-5:15pm # of Gaps 9 12 6 2 4 1 0 1
# of Vehicles 9 24 18 8 20 6 0 8 93
5:15-5:30pm # of Gaps 14 9 6 0 3 0 1 0
# of Vehicles 14 18 18 0 15 0 7 0 72 269
Saturday Peak Hour
12:00-12:15pm # of Gaps 16 7 5 3 0 3 0 1
# of Vehicles 16 14 15 12 0 18 0 8 83
12:15-12:30pm # of Gaps 17 7 4 1 0 1 1 2
# of Vehicles 17 14 12 4 0 6 7 16 76
12:30-12:45pm # of Gaps 12 7 1 0 2 2 4 2
# of Vehicles 12 14 3 0 10 12 28 16 95
12:45-1:00pm # of Gaps 11 8 4 4 3 0 0 1
# of Vehicles 11 16 12 16 15 0 0 8 78 332
Intersection Gap Study
Project: Proposed Mixed Use Development - US Route 9 - Saratoga Springs, NY
Date: 11/6/2025 & 11/8/2025
Intersection: Proposed Site Access @ US Route 9
Movement: Left Turns Exiting
6-9 sec 10-13 sec 14-17 sec 18-19 sec 20-23 sec 24-25 sec 26-29 sec >29 sec Interval Hour
Time Interval x 1 x 2 x 3 x 4 x 5 x 6 x 7 x 8 Total Total
Morning Peak Hour
7:30-7:45am # of Gaps 14 6 4 0 0 0 0 0
# of Vehicles 14 12 12 0 0 0 0 0 38
7:45-8:00am # of Gaps 10 3 1 0 0 0 0 0
# of Vehicles 10 6 3 0 0 0 0 0 19
8:00-8:15am # of Gaps 13 3 1 0 0 0 0 0
# of Vehicles 13 6 3 0 0 0 0 0 22
8:15-8:30am # of Gaps 15 5 1 1 0 0 0 0
# of Vehicles 15 10 3 4 0 0 0 0 32 111
Evening Peak Hour
4:30-4:45pm # of Gaps 14 3 1 0 0 0 0 0
# of Vehicles 14 6 3 0 0 0 0 0 23
4:45-5:00pm # of Gaps 9 1 2 1 0 0 0 0
# of Vehicles 9 2 6 4 0 0 0 0 21
5:00-5:15pm # of Gaps 12 8 1 0 0 0 0 0
# of Vehicles 12 16 3 0 0 0 0 0 31
5:15-5:30pm # of Gaps 12 5 1 0 0 0 0 0
# of Vehicles 12 10 3 0 0 0 0 0 25 100
Saturday Peak Hour
12:00-12:15pm # of Gaps 13 4 1 2 0 0 0 1
# of Vehicles 13 8 3 8 0 0 0 8 40
12:15-12:30pm # of Gaps 18 5 0 1 2 0 0 0
# of Vehicles 18 10 0 4 10 0 0 0 42
12:30-12:45pm # of Gaps 17 5 4 0 3 0 0 0
# of Vehicles 17 10 12 0 15 0 0 0 54
12:45-1:00pm # of Gaps 11 7 3 1 0 0 0 0
# of Vehicles 11 14 9 4 0 0 0 0 38 174
Distance Travelled (ft) =275 50 Speed Measurements per Direction Speed Limit 30 mph
NB Time Calculated NB Time Calculated SB Time Calculated SB Time Calculated
Seconds Speed Seconds Speed Seconds Speed Seconds Speed
4.21 45 3.58 52 4.09 46 3.41 55
4.05 46 3.57 53 4.00 47 3.40 55
3.99 47 3.55 53 3.82 49 3.37 56
3.87 48 3.55 53 3.81 49 3.36 56
3.84 49 3.55 53 3.78 50 3.36 56
3.77 50 3.52 53 3.76 50 3.35 56
3.77 50 3.48 54 3.73 50 3.35 56
3.75 50 3.46 54 3.66 51 3.32 56
3.75 50 3.45 54 3.65 51 3.32 56
3.74 50 3.43 55 3.63 52 3.32 56
3.74 50 3.42 55 3.62 52 3.31 57
3.71 51 3.42 55 3.56 53 3.31 57
3.71 51 3.36 56 3.53 53 3.29 57
3.71 51 3.36 56 3.52 53 3.28 57
3.67 51 3.34 56 3.52 53 3.28 57
3.67 51 3.30 57 3.50 54 3.28 57
3.65 51 3.30 57 3.47 54 3.28 57
3.64 52 3.27 57 3.45 54 3.25 58
3.64 52 3.24 58 3.44 55 3.25 58
3.64 52 3.23 58 3.43 55 3.25 58
3.64 52 3.21 58 3.43 55 3.22 58
3.58 52 3.21 58 3.42 55 3.22 58
3.58 52 3.18 59 3.41 55 3.19 59
3.58 52 3.15 60 3.41 55 3.12 60
3.58 52 3.14 60 3.41 55 3.00 63
Northbound Southbound
Average Speed =53 mph Average Speed =55 mph
85th Percentile Speed =57 mph 85th Percentile Speed =57.5 mph
Proposed Mixed Use Development - US Route 9 - Saratoga Springs, NY
Speed Study Measurements - US Route 9 Passing Site
11/6/2025
Background Traffic Grow th Calculations
Proposed Mixed Use Development
US Route 9 -Saratoga Springs,NY
Historical Traffic Counts Taken from the NYSDOT Traffic Data Viewer Wesbsite
US Route 9 - Between Crescent Avenue and South City Line
2024 2021 2018 2015
21,338 veh 17,438 veh 21,854 veh 19,358 veh
Crescent Avenue - Between US Route 9 and County Route 64
2024 2021 2018 2015
4,279 veh 4,711 veh 5,330 veh 5,740 veh
Use +1.0% annual growth for traffic projections
+7.5% per year -6.7% per year
-3.1% per year
-2.8% per year
-3.3% per year
-2.4% per year-3.9% per year
-0.4% per year
+4.3% per year
+1.1% per year
Proposed Development 200 Apartments (with retail/office on First Floors)
80 Room - Hotel
ITE Trip Generation - 12th Edition
Land Use 231 - Mid-Rise Residential with Ground-Floor Commercial (25-65K)
Morning Peak Hour 0.41 Trips/Unit 30%Enter*70%Exit*
Evening Peak Hour 0.75 Trips/Unit 70%Enter*30%Exit*
Saturday Peak Hour 0.71 Trips/Unit**51%Enter**49%Exit **
* - Directional Distribution Not Available - Used Distributribution Based on Mid-Rise Residential with Ground-Floor Commercial (1-25K)
** - Not Data Available for Saturday Peak, Used Comparison for Land Use 221 - Multfamily Housing - Sat = 94.7% of PM Rate, Used Same Directional Split as Land Use 221
Land Use 310 - Hotel
Morning Peak Hour 0.34 Trips/Room 52%Enter 48%Exit
Evening Peak Hour 0.47 Trips/Room 51%Enter 49%Exit
Saturday Peak Hour 0.47 Trips/Room 51%Enter 49%Exit
Development Size Total Trips Entering Exiting Total Trips Entering Exiting Total Trips Entering Exiting
Apartments 200 Units 82 25 57 150 105 45 142 72 70
Hotel 80 Rooms 27 14 13 38 19 18 38 19 18
109 39 70 188 124 63 180 92 88
Trip Generation Estimate - Proposed Mixed Use Development
Total Trips Generated
Saturday Peak HourMorning Peak Hour Evening Peak Hour
Proposed Mixed Use Development
US Route 9 - Saratoga Springs, NY
Trip Generation Estimate
Accident #Date Location Type # Cars Severity Direction Conditions Contributing Factors
1 3./4/22 US 9 - 100' N of Crescent Fixed Object 1 PDO SB / Light Pole Dry Reaction to Another Vehicle
2 5/4/2022 US 9 - 300' S of Crescent Right Angle 2 PDO SB Uturn / SB Wet Failure to Yield ROW
3 7/9/2022 US 9 - 300' S of Crescent Animal 1 PDO NB / Deer Dry Animal's Actions
4 9/10/2022 Crescent Ave @ US 9 Left Turn 2 PDO SB Left / NB Dry Failure to Yield ROW
5 10/24/2022 Crescent Ave @ US 9 Rearend 2 PDO NB / NB Dry Following Too Closely
6 3/16/2022 US 9 - 1800' S of Crescent Left Turn 2 INJ SB Left / NB Dry Failure to Yield ROW
7 12/31/2022 US 9 - 0.1mi S of Crescent Animal 1 PDO SB / Deer Wet Animal's Actions
8 6/10/2023 E West Rd @ US 9 Rearend 2 PDO NB / NB Stopped Dry Following Too Closely
9 6/15/2023 US 9 - 100' N of E West Animal 1 PDO NB / Deer Dry Animal's Actions
10 8/16/2023 E West Rd @ US 9 Rearend 2 PDO SB / SB Stopped Dry Following Too Closely
11 8/29/2023 Crescent Ave @ US 9 Rearend 2 PDO SB / SB Left Stopped Dry Following Too Closely
12 8/14/2023 US 9 - 100' S of E West Fixed Object 1 PDO SB / Fence Dry Unknown
13 2/10/2024 E West Rd @ US 9 Rearend 2 PDO SB / SB Stopped Wet Following Too Closely
14 1/25/2024 US 9 - 100' N of Crescent Fixed Object 1 PDO SB / Median Wet Reaction to Another Vehicle
15 4/19/2024 E West Rd @ US 9 Rearend 3 INJ SB / SB Stopped (2) Dry Alcohol Involvement
16 5/11/2024 Crescent Ave @ US 9 Rearend 2 PDO NB / NB Dry Following Too Closely
17 12/14/2023 US 9 - 400' N of E West Animal 1 PDO SB / Coyote Dry Animal's Actions
18 11/8/2024 US 9 - 0.5mi N of E West Animal 1 PDO NB / Deer Dry Animal's Actions
19 8/3/2024 Crescent Ave @ US 9 Left Turn 2 PDO SB Uturn / NB Dry Turning Improper
US 9 @ Crescent Avenue - 5 Accidents US 9 @ E West Road - 4 Accidents US Route 9 Midblock - 10 Accidents
3 - Rearend Accidents 4 - Rearend Accidents 5 - Animal Accidents
2 - Left Turn Accidents 3 - Fixed Object Accidents
1 - Right Angle Accident
1 - Left Turn Accident
US 9 @ Crescent Avenue Intersection - Evening Peak Hour - 140 Veh EW / 1927 Veh NS. Assumed PM Peak is 9% of AADT, AADT = 1556 Veh EW / 21411 Veh N/S
US 9 @ E West Road Intersection - Evening Peak Hour - 34 Veh EW / 1978 Veh NS. Assumed PM Peak is 9% of AADT, AADT = 378 Veh EW / 21978 Veh N/S
US Route 9 - NYSDOT Traffic Data Viewer - AADT = 21,338 Vehicles.
Accident History Summaries - March 2022 Through February 2025
Proposed Mixed Use Development - US Route 9 - Saratoga Springs, NY
Intersection Accident Severity
Basic
US 9 @ Crescent Avenue - 5 Accidents LOSS
5 Total Accidents NYSDOT Saftey Performance Function = 2.58 Accidents/Year Calculated Rate = 1.66 Accidents/Year 2
0 Injury Accidents / 0 Fatality Accident NYSDOT Saftey Performance Function = 0.87 Accidents/Year Calculated Rate = 0.00 Accidents/Year 2
High Accident Location / Low Severity
US 9 @ E West Road - 4 Accidents
4 Total Accidents NYSDOT Saftey Performance Function = 1.59 Accidents/Year Calculated Rate = 1.33 Accidents/Year 2
1 Injury Accidents / 0 Fatality Accidents NYSDOT Saftey Performance Function = 0.56 Accidents/Year Calculated Rate = 0.33 Accidents/Year 2
Not a Severe Accident Location
Link Accident Severity
Basic
US Route 9 Midblock - 10 Accidents LOSS
10 Total Accidents NYSDOT Saftey Performance Function = 21.74 Accidents/Year Calculated Rate = 3.33 Accidents/Year 2
1 Injury Accidents / 0 Fatality Accidents NYSDOT Saftey Performance Function = 4.46 Accidents/Year Calculated Rate = 0.33 Accidents/Year 2
Not a Severe Accident Location
HourlyDirectionReportNYSDOT_SC150050000000Tuesday,July9,2024toThursday,July11,2024
SiteName
SiteID
Description
Region
County
DOTID
CountyOrder
Excludedata:
Time NB1 NB2 SB2 SB1 Total
00:00:00 37 16 33 15 102
01:00:00 20 9 16 11 56
02:00:00 13 6 15 6 40
03:00:00 15 6 31 7 60
04:00:00 41 18 50 14 123
05:00:00 100 50 119 44 312
06:00:00 322 181 256 121 880
07:00:00 496 304 424 264 1487
08:00:00 604 365 423 257 1649
09:00:00 515 332 382 212 1441
10:00:00 507 303 374 201 1385
11:00:00 575 352 410 225 1562
12:00:00 564 351 406 242 1563
13:00:00 513 347 389 240 1489
14:00:00 492 311 429 262 1494
15:00:00 524 330 499 352 1705
16:00:00 554 398 555 395 1902
17:00:00 602 411 495 352 1861
18:00:00 484 352 385 218 1439
19:00:00 294 156 308 168 926
20:00:00 246 101 243 134 725
21:00:00 173 81 240 123 618
22:00:00 132 56 190 86 465
23:00:00 65 28 87 46 225
7am-7pm 6429 4158 5171 3219 18977
6am-10pm 7465 4677 6218 3766 22126
6am-12am 7662 4761 6495 3898 22816
12am-12am 7888 4867 6760 3995 23510
amPeak 8:00:00 8:00:00 7:00:00 7:00:00 8:00:00
PeakVolume 604 365 424 264 1649
pmPeak 17:00:00 17:00:00 16:00:00 16:00:00 16:00:00
9
None
150050
150050000000
US9fromCITYOFSARATOGASPRINGStoCRESCENTAVE
1
Saratoga
100514
File Name : US Route 9 @ Crescent Avenue - AMPM
Site Code : 00000001
Start Date : 11/6/2025
Page No : 1
Groups Printed- Cars & HV
US Route 9
Southbound
Crescent Avenue
Westbound
US Route 9
Northbound Eastbound
Start Time Right Thru Left HV Right Thru Left HV Right Thru Left HV Right Thru Left HV Int. Total
07:00 AM 0 182 18 1 15 0 5 1 10 125 0 8 0 0 0 0 365
07:15 AM 0 175 21 8 26 0 10 1 9 155 0 9 0 0 0 0 414
07:30 AM 0 193 9 7 35 0 12 1 11 211 0 11 0 0 0 0 490
07:45 AM 0 203 29 7 21 0 8 0 19 236 0 11 0 0 0 0 534
Total 0 753 77 23 97 0 35 3 49 727 0 39 0 0 0 0 1803
08:00 AM 0 185 30 6 14 0 5 2 14 190 0 9 0 0 0 0 455
08:15 AM 0 146 15 6 18 0 5 0 27 199 0 11 0 0 0 0 427
08:30 AM 0 161 27 9 23 0 14 1 24 209 0 10 0 0 0 0 478
08:45 AM 0 137 29 8 17 0 7 1 29 229 0 12 0 0 0 0 469
Total 0 629 101 29 72 0 31 4 94 827 0 42 0 0 0 0 1829
04:00 PM 0 170 33 4 30 0 21 1 28 183 0 2 0 0 0 0 472
04:15 PM 0 209 22 4 35 0 12 0 21 169 0 3 0 0 0 0 475
04:30 PM 0 223 41 5 23 0 6 0 24 185 0 0 0 0 0 0 507
04:45 PM 0 200 22 5 20 0 17 1 31 246 0 1 0 0 0 0 543
Total 0 802 118 18 108 0 56 2 104 783 0 6 0 0 0 0 1997
05:00 PM 0 231 22 2 21 0 16 0 28 200 0 4 0 0 0 0 524
05:15 PM 0 217 27 3 23 0 14 0 32 198 0 0 0 0 0 0 514
05:30 PM 0 132 28 2 17 0 16 1 30 172 0 2 0 0 0 0 400
05:45 PM 0 132 27 3 15 0 9 0 24 215 0 3 0 0 0 0 428
Total 0 712 104 10 76 0 55 1 114 785 0 9 0 0 0 0 1866
Grand Total 0 2896 400 80 353 0 177 10 361 3122 0 96 0 0 0 0 7495
Apprch %0 85.8 11.8 2.4 65.4 0 32.8 1.9 10.1 87.2 0 2.7 0 0 0 0
Total %0 38.6 5.3 1.1 4.7 0 2.4 0.1 4.8 41.7 0 1.3 0 0 0 0
File Name : US Route 9 @ Crescent Avenue - AMPM
Site Code : 00000001
Start Date : 11/6/2025
Page No : 2
US Route 9
Southbound
Crescent Avenue
Westbound
US Route 9
Northbound Eastbound
Start Time Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 0 193 9 7 209 35 0 12 1 48 11 211 0 11 233 0 0 0 0 0 490
07:45 AM 0 203 29 7 239 21 0 8 0 29 19 236 0 11 266 0 0 0 0 0 534
08:00 AM 0 185 30 6 221 14 0 5 2 21 14 190 0 9 213 0 0 0 0 0 455
08:15 AM 0 146 15 6 167 18 0 5 0 23 27 199 0 11 237 0 0 0 0 0 427
Total Volume 0 727 83 26 836 88 0 30 3 121 71 836 0 42 949 0 0 0 0 0 1906
% App. Total 0 87 9.9 3.1 72.7 0 24.8 2.5 7.5 88.1 0 4.4 0 0 0 0
PHF .000 .895 .692 .929 .874 .629 .000 .625 .375 .630 .657 .886 .000 .955 .892 .000 .000 .000 .000 .000 .892
US Route 9
Crescent
Avenue
US Route 9
Right
0
Thru
727
Left
83
HV
26
InOut Total
924 836 1760
Right
88
Thru 0
Left 30
HV
3
Out
Total
In
154
121
275
Left
0
Thru
836
Right
71
HV
42
Out TotalIn
757 949 1706
Left0
Thru0
Right0
HV
0
Total
Out
In
0
0
0
Peak Hour Begins at 07:30 AM
Cars & HV
Peak Hour Data
North
File Name : US Route 9 @ Crescent Avenue - AMPM
Site Code : 00000001
Start Date : 11/6/2025
Page No : 3
US Route 9
Southbound
Crescent Avenue
Westbound
US Route 9
Northbound Eastbound
Start
Time Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Int. Total
Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 0 223 41 5 269 23 0 6 0 29 24 185 0 0 209 0 0 0 0 0 507
04:45 PM 0 200 22 5 227 20 0 17 1 38 31 246 0 1 278 0 0 0 0 0 543
05:00 PM 0 231 22 2 255 21 0 16 0 37 28 200 0 4 232 0 0 0 0 0 524
05:15 PM 0 217 27 3 247 23 0 14 0 37 32 198 0 0 230 0 0 0 0 0 514
Total Volume 0 871 112 15 998 87 0 53 1 141 115 829 0 5 949 0 0 0 0 0 2088
% App. Total 0 87.3 11.2 1.5 61.7 0 37.6 0.7 12.1 87.4 0 0.5 0 0 0 0
PHF .000 .943 .683 .750 .928 .946 .000 .779 .250 .928 .898 .842 .000 .313 .853 .000 .000 .000 .000 .000 .961
US Route 9
Crescent
Avenue
US Route 9
Right
0
Thru
871
Left
112
HV
15
InOut Total
916 998 1914
Right
87
Thru 0
Left 53
HV
1
Out
Total
In
227
141
368
Left
0
Thru
829
Right
115
HV
5
Out TotalIn
924 949 1873
Left0
Thru0
Right0
HV
0
Total
Out
In
0
0
0
Peak Hour Begins at 04:30 PM
Cars & HV
Peak Hour Data
North
File Name : US Route 9 @ Crescent Avenue - AMPM
Site Code : 00000001
Start Date : 11/6/2025
Page No : 1
Groups Printed- Peds
US Route 9
Southbound
Crescent Avenue
Westbound
US Route 9
Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total
04:00 PM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1
04:30 PM 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 1
Total 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 2
05:15 PM 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 3
Total 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 3
Grand Total 0 0 0 0 0 0 0 5 0 0 0 0 0 0 0 0 5
Apprch %0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0
Total %0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0
File Name : US Route 9 @ Crescent Avenue - Sat
Site Code : 00000001
Start Date : 11/8/2025
Page No : 1
Groups Printed- Cars & HV
US Route 9
Southbound
Crescent Avenue
Westbound
US Route 9
Northbound Eastbound
Start Time Right Thru Left HV Right Thru Left HV Right Thru Left HV Right Thru Left HV Int. Total
11:00 AM 0 136 18 0 16 0 9 4 25 149 0 1 0 0 0 0 358
11:15 AM 0 135 26 0 17 0 11 0 28 134 0 1 0 0 0 0 352
11:30 AM 0 156 29 1 29 0 14 0 33 154 0 5 0 0 0 0 421
11:45 AM 0 119 26 2 16 0 10 0 33 174 0 2 0 0 0 0 382
Total 0 546 99 3 78 0 44 4 119 611 0 9 0 0 0 0 1513
12:00 PM 0 175 30 4 22 0 10 0 33 140 0 0 0 0 0 0 414
12:15 PM 0 146 34 0 27 0 17 0 45 186 0 2 0 0 0 0 457
12:30 PM 0 134 31 0 29 0 10 0 38 193 0 3 0 0 0 0 438
12:45 PM 0 129 32 3 23 0 14 0 30 168 0 3 0 0 0 0 402
Total 0 584 127 7 101 0 51 0 146 687 0 8 0 0 0 0 1711
Grand Total 0 1130 226 10 179 0 95 4 265 1298 0 17 0 0 0 0 3224
Apprch %0 82.7 16.5 0.7 64.4 0 34.2 1.4 16.8 82.2 0 1.1 0 0 0 0
Total %0 35 7 0.3 5.6 0 2.9 0.1 8.2 40.3 0 0.5 0 0 0 0
File Name : US Route 9 @ Crescent Avenue - Sat
Site Code : 00000001
Start Date : 11/8/2025
Page No : 2
US Route 9
Southbound
Crescent Avenue
Westbound
US Route 9
Northbound Eastbound
Start Time Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Int. Total
Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 12:00 PM
12:00 PM 0 175 30 4 209 22 0 10 0 32 33 140 0 0 173 0 0 0 0 0 414
12:15 PM 0 146 34 0 180 27 0 17 0 44 45 186 0 2 233 0 0 0 0 0 457
12:30 PM 0 134 31 0 165 29 0 10 0 39 38 193 0 3 234 0 0 0 0 0 438
12:45 PM 0 129 32 3 164 23 0 14 0 37 30 168 0 3 201 0 0 0 0 0 402
Total Volume 0 584 127 7 718 101 0 51 0 152 146 687 0 8 841 0 0 0 0 0 1711
% App. Total 0 81.3 17.7 1 66.4 0 33.6 0 17.4 81.7 0 1 0 0 0 0
PHF .000 .834 .934 .438 .859 .871 .000 .750 .000 .864 .811 .890 .000 .667 .899 .000 .000 .000 .000 .000 .936
US Route 9
Crescent
Avenue
US Route 9
Right
0
Thru
584
Left
127
HV
7
InOut Total
788 718 1506
Right
101
Thru 0
Left 51
HV
0
Out
Total
In
273
152
425
Left
0
Thru
687
Right
146
HV
8
Out TotalIn
635 841 1476
Left0
Thru0
Right0
HV
0
Total
Out
In
0
0
0
Peak Hour Begins at 12:00 PM
Cars & HV
Peak Hour Data
North
File Name : US Route 9 @ Crescent Avenue - Sat
Site Code : 00000001
Start Date : 11/8/2025
Page No : 1
Groups Printed- Peds
US Route 9
Southbound
Crescent Avenue
Westbound
US Route 9
Northbound Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total
11:00 AM 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 3
11:15 AM 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
11:45 AM 0 0 0 2 0 0 0 5 0 0 0 0 0 0 0 0 7
Total 0 0 0 3 0 0 0 8 0 0 0 0 0 0 0 0 11
12:00 PM 0 0 0 0 0 0 0 7 0 0 0 0 0 0 0 0 7
12:45 PM 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 2
Total 0 0 0 0 0 0 0 9 0 0 0 0 0 0 0 0 9
Grand Total 0 0 0 3 0 0 0 17 0 0 0 0 0 0 0 0 20
Apprch %0 0 0 100 0 0 0 100 0 0 0 0 0 0 0 0
Total %0 0 0 15 0 0 0 85 0 0 0 0 0 0 0 0
File Name : US Route 9 @ E West Road - AMPM
Site Code : 00000002
Start Date : 11/6/2025
Page No : 1
Groups Printed- Cars & HV
US Route 9
Southbound
Driveway
Westbound
US Route 9
Northbound
E West Road
Eastbound
Start Time Right Thru Left HV Right Thru Left HV Right Thru Left HV Right Thru Left HV Int. Total
07:00 AM 0 159 0 1 0 0 0 0 0 124 3 12 1 0 0 1 301
07:15 AM 1 177 0 6 0 0 0 0 0 150 3 9 0 0 0 0 346
07:30 AM 0 182 1 8 0 0 0 0 0 220 7 12 2 0 1 1 434
07:45 AM 1 207 0 7 0 0 0 0 0 267 4 11 0 0 0 0 497
Total 2 725 1 22 0 0 0 0 0 761 17 44 3 0 1 2 1578
08:00 AM 0 194 1 7 0 0 0 0 0 227 7 10 0 0 0 0 446
08:15 AM 1 167 0 6 0 0 1 0 0 243 3 9 0 0 1 0 431
08:30 AM 2 157 0 9 0 0 0 0 0 228 2 7 1 0 0 0 406
08:45 AM 3 133 0 10 0 0 0 0 0 274 3 12 0 0 0 0 435
Total 6 651 1 32 0 0 1 0 0 972 15 38 1 0 1 0 1718
04:00 PM 4 217 0 6 1 0 0 0 1 191 5 3 11 0 1 0 440
04:15 PM 0 253 0 5 0 0 0 0 0 192 1 2 4 0 0 0 457
04:30 PM 1 243 0 2 0 0 0 0 0 207 3 2 11 0 5 0 474
04:45 PM 0 244 0 5 0 0 0 0 0 257 3 1 4 0 1 0 515
Total 5 957 0 18 1 0 0 0 1 847 12 8 30 0 7 0 1886
05:00 PM 1 271 0 3 1 0 0 0 4 260 1 3 7 1 2 0 554
05:15 PM 2 257 1 5 0 0 0 0 0 228 0 0 3 0 1 0 497
05:30 PM 0 158 0 1 0 0 0 0 0 204 0 0 1 0 1 0 365
05:45 PM 1 140 0 3 0 0 0 0 0 250 1 1 1 1 3 0 401
Total 4 826 1 12 1 0 0 0 4 942 2 4 12 2 7 0 1817
Grand Total 17 3159 3 84 2 0 1 0 5 3522 46 94 46 2 16 2 6999
Apprch %0.5 96.8 0.1 2.6 66.7 0 33.3 0 0.1 96 1.3 2.6 69.7 3 24.2 3
Total %0.2 45.1 0 1.2 0 0 0 0 0.1 50.3 0.7 1.3 0.7 0 0.2 0
File Name : US Route 9 @ E West Road - AMPM
Site Code : 00000002
Start Date : 11/6/2025
Page No : 2
US Route 9
Southbound
Driveway
Westbound
US Route 9
Northbound
E West Road
Eastbound
Start Time Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 0 182 1 8 191 0 0 0 0 0 0 220 7 12 239 2 0 1 1 4 434
07:45 AM 1 207 0 7 215 0 0 0 0 0 0 267 4 11 282 0 0 0 0 0 497
08:00 AM 0 194 1 7 202 0 0 0 0 0 0 227 7 10 244 0 0 0 0 0 446
08:15 AM 1 167 0 6 174 0 0 1 0 1 0 243 3 9 255 0 0 1 0 1 431
Total Volume 2 750 2 28 782 0 0 1 0 1 0 957 21 42 1020 2 0 2 1 5 1808
% App. Total 0.3 95.9 0.3 3.6 0 0 100 0 0 93.8 2.1 4.1 40 0 40 20
PHF .500 .906 .500 .875 .909 .000 .000 .250 .000 .250 .000 .896 .750 .875 .904 .250 .000 .500 .250 .313 .909
US Route 9
E
West
Road
Driveway
US Route 9
Right
2
Thru
750
Left
2
HV
28
InOut Total
959 782 1741
Right 0
Thru 0
Left 1
HV
0
Out
Total
In
2
1
3
Left
21
Thru
957
Right
0
HV
42
Out TotalIn
753 1020 1773
Left2
Thru0
Right2
HV
1
Total
Out
In
23
5
28
Peak Hour Begins at 07:30 AM
Cars & HV
Peak Hour Data
North
File Name : US Route 9 @ E West Road - AMPM
Site Code : 00000002
Start Date : 11/6/2025
Page No : 3
US Route 9
Southbound
Driveway
Westbound
US Route 9
Northbound
E West Road
Eastbound
Start
Time Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Int. Total
Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 1 243 0 2 246 0 0 0 0 0 0 207 3 2 212 11 0 5 0 16 474
04:45 PM 0 244 0 5 249 0 0 0 0 0 0 257 3 1 261 4 0 1 0 5 515
05:00 PM 1 271 0 3 275 1 0 0 0 1 4 260 1 3 268 7 1 2 0 10 554
05:15 PM 2 257 1 5 265 0 0 0 0 0 0 228 0 0 228 3 0 1 0 4 497
Total Volume 4 1015 1 15 1035 1 0 0 0 1 4 952 7 6 969 25 1 9 0 35 2040
% App. Total 0.4 98.1 0.1 1.4 100 0 0 0 0.4 98.2 0.7 0.6 71.4 2.9 25.7 0
PHF .500 .936 .250 .750 .941 .250 .000 .000 .000 .250 .250 .915 .583 .500 .904 .568 .250 .450 .000 .547 .921
US Route 9
E
West
Road
Driveway
US Route 9
Right
4
Thru
1015
Left
1
HV
15
InOut Total
962 1035 1997
Right 1
Thru 0
Left 0
HV
0
Out
Total
In
6
1
7
Left
7
Thru
952
Right
4
HV
6
Out TotalIn
1040 969 2009
Left9
Thru1
Right
25
HV
0
Total
Out
In
11
35
46
Peak Hour Begins at 04:30 PM
Cars & HV
Peak Hour Data
North
File Name : US Route 9 @ E West Road - AMPM
Site Code : 00000002
Start Date : 11/6/2025
Page No : 1
Groups Printed- Peds
US Route 9
Southbound
Driveway
Westbound
US Route 9
Northbound
E West Road
Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total
Grand Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Apprch %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total %
File Name : US Route 9 @ E West Road - Sat
Site Code : 00000002
Start Date : 11/8/2025
Page No : 1
Groups Printed- Cars & HV
US Route 9
Southbound
Driveway
Westbound
US Route 9
Northbound
E West Road
Eastbound
Start Time Right Thru Left HV Right Thru Left HV Right Thru Left HV Right Thru Left HV Int. Total
11:00 AM 5 164 0 1 0 0 2 0 2 162 5 1 4 1 4 0 351
11:15 AM 4 129 0 0 1 0 0 0 0 168 9 3 11 0 0 0 325
11:30 AM 2 173 0 2 0 0 0 0 1 192 4 5 5 0 3 0 387
11:45 AM 3 144 1 1 0 0 0 0 0 223 1 2 4 0 4 0 383
Total 14 610 1 4 1 0 2 0 3 745 19 11 24 1 11 0 1446
12:00 PM 2 202 1 5 0 0 1 0 0 182 7 0 9 0 3 0 412
12:15 PM 3 157 2 0 2 0 0 0 3 241 7 3 3 0 12 0 433
12:30 PM 3 145 1 0 4 0 1 0 1 218 7 5 9 0 11 0 405
12:45 PM 3 140 1 5 6 0 0 0 9 230 8 3 8 0 7 0 420
Total 11 644 5 10 12 0 2 0 13 871 29 11 29 0 33 0 1670
Grand Total 25 1254 6 14 13 0 4 0 16 1616 48 22 53 1 44 0 3116
Apprch %1.9 96.5 0.5 1.1 76.5 0 23.5 0 0.9 94.9 2.8 1.3 54.1 1 44.9 0
Total %0.8 40.2 0.2 0.4 0.4 0 0.1 0 0.5 51.9 1.5 0.7 1.7 0 1.4 0
File Name : US Route 9 @ E West Road - Sat
Site Code : 00000002
Start Date : 11/8/2025
Page No : 2
US Route 9
Southbound
Driveway
Westbound
US Route 9
Northbound
E West Road
Eastbound
Start Time Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Right Thru Left HV App. Total Int. Total
Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 12:00 PM
12:00 PM 2 202 1 5 210 0 0 1 0 1 0 182 7 0 189 9 0 3 0 12 412
12:15 PM 3 157 2 0 162 2 0 0 0 2 3 241 7 3 254 3 0 12 0 15 433
12:30 PM 3 145 1 0 149 4 0 1 0 5 1 218 7 5 231 9 0 11 0 20 405
12:45 PM 3 140 1 5 149 6 0 0 0 6 9 230 8 3 250 8 0 7 0 15 420
Total Volume 11 644 5 10 670 12 0 2 0 14 13 871 29 11 924 29 0 33 0 62 1670
% App. Total 1.6 96.1 0.7 1.5 85.7 0 14.3 0 1.4 94.3 3.1 1.2 46.8 0 53.2 0
PHF .917 .797 .625 .500 .798 .500 .000 .500 .000 .583 .361 .904 .906 .550 .909 .806 .000 .688 .000 .775 .964
US Route 9
E
West
Road
Driveway
US Route 9
Right
11
Thru
644
Left
5
HV
10
InOut Total
916 670 1586
Right
12
Thru 0
Left 2
HV
0
Out
Total
In
18
14
32
Left
29
Thru
871
Right
13
HV
11
Out TotalIn
675 924 1599
Left33
Thru0
Right
29
HV
0
Total
Out
In
40
62
102
Peak Hour Begins at 12:00 PM
Cars & HV
Peak Hour Data
North
File Name : US Route 9 @ E West Road - Sat
Site Code : 00000002
Start Date : 11/8/2025
Page No : 1
Groups Printed- Peds
US Route 9
Southbound
Driveway
Westbound
US Route 9
Northbound
E West Road
Eastbound
Start Time Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Right Thru Left Peds Int. Total
Grand Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Apprch %0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total %
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2025 Existing Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 30 88 836 71 83 727
Future Volume (vph) 30 88 836 71 83 727
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1637 0 3429 0 1752 3505
Flt Permitted 0.987 0.161
Satd. Flow (perm) 1637 0 3429 0 297 3505
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 111 7
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Peak Hour Factor 0.63 0.63 0.89 0.89 0.87 0.87
Heavy Vehicles (%) 3% 3% 4% 4% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 188 0 1019 0 95 836
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 9.5 26.3 36.9 36.9
Actuated g/C Ratio 0.17 0.46 0.65 0.65
v/c Ratio 0.52 0.65 0.23 0.37
Control Delay (s/veh) 17.6 15.5 5.1 5.1
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2025 Existing Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 17.6 15.5 5.1 5.1
LOS B B A A
Approach Delay (s/veh) 17.6 15.5 5.1
Approach LOS B B A
Queue Length 50th (ft) 24 142 9 52
Queue Length 95th (ft) 45 261 27 101
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1537 3206 746 3505
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.12 0.32 0.13 0.24
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 57.2
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.65
Intersection Signal Delay (s/veh): 11.1 Intersection LOS: B
Intersection Capacity Utilization 50.0% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2025 Existing Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 2 2 21 957 750 2
Future Volume (vph) 2 2 21 957 750 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1504 1346 1736 3471 3471 1553
Flt Permitted 0.950 0.335
Satd. Flow (perm) 1504 1346 612 3471 3471 1553
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 4 2
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.50 0.50 0.88 0.88 0.91 0.91
Heavy Vehicles (%) 20% 20% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 4 4 24 1088 824 2
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.0 7.0 25.6 27.3 18.1 18.1
Actuated g/C Ratio 0.24 0.24 0.89 0.94 0.63 0.63
v/c Ratio 0.01 0.01 0.02 0.33 0.38 0.00
Control Delay (s/veh) 15.5 12.5 1.5 1.3 6.0 6.0
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2025 Existing Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 15.5 12.5 1.5 1.3 6.0 6.0
LOS B B A A A A
Approach Delay (s/veh) 14.0 1.3 6.0
Approach LOS B A A
Queue Length 50th (ft) 0 0 0 0 2 0
Queue Length 95th (ft) 6 4 6 82 176 4
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1439 1288 1478 3471 3322 1486
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.00 0.00 0.02 0.31 0.25 0.00
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 28.9
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.38
Intersection Signal Delay (s/veh): 3.3 Intersection LOS: A
Intersection Capacity Utilization 39.8% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2025 Existing Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 53 87 829 115 112 871
Future Volume (vph) 53 87 829 115 112 871
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1690 0 3499 0 1770 3539
Flt Permitted 0.981 0.131
Satd. Flow (perm) 1690 0 3499 0 244 3539
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 62 11
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Confl. Peds. (#/hr) 4 4
Peak Hour Factor 0.93 0.93 0.85 0.85 0.93 0.93
Heavy Vehicles (%) 1% 1% 1% 1% 2% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 151 0 1110 0 120 937
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 9.7 28.8 44.0 44.0
Actuated g/C Ratio 0.15 0.45 0.69 0.69
v/c Ratio 0.49 0.71 0.30 0.39
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2025 Existing Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Control Delay (s/veh) 23.7 17.3 5.5 4.9
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 23.7 17.3 5.5 4.9
LOS C B A A
Approach Delay (s/veh) 23.7 17.3 4.9
Approach LOS C B A
Queue Length 50th (ft) 31 167 12 63
Queue Length 95th (ft) 101 272 33 118
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1525 3146 665 3522
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.10 0.35 0.18 0.27
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 64.2
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.71
Intersection Signal Delay (s/veh): 12.1 Intersection LOS: B
Intersection Capacity Utilization 53.6% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2025 Existing Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 9 25 7 952 1015 4
Future Volume (vph) 9 25 7 952 1015 4
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1787 1599 1787 3574 3574 1599
Flt Permitted 0.950 0.219
Satd. Flow (perm) 1787 1599 412 3574 3574 1599
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 45 3
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.55 0.55 0.90 0.90 0.94 0.94
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 16 45 8 1058 1080 4
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.1 7.1 29.7 25.2 19.2 19.2
Actuated g/C Ratio 0.21 0.21 0.88 0.75 0.57 0.57
v/c Ratio 0.04 0.12 0.01 0.40 0.53 0.00
Control Delay (s/veh) 19.2 9.3 1.3 3.9 8.3 6.3
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2025 Existing Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 19.2 9.3 1.3 3.9 8.3 6.3
LOS B A A A A A
Approach Delay (s/veh) 11.9 3.9 8.3
Approach LOS B A A
Queue Length 50th (ft) 2 0 0 55 57 0
Queue Length 95th (ft) 14 9 3 76 235 5
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1679 1505 1332 3574 3359 1503
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.03 0.01 0.30 0.32 0.00
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 33.8
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.53
Intersection Signal Delay (s/veh): 6.3 Intersection LOS: A
Intersection Capacity Utilization 41.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2025 Existing Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 51 101 687 146 127 584
Future Volume (vph) 51 101 687 146 127 584
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1684 0 3462 0 1787 3574
Flt Permitted 0.984 0.167
Satd. Flow (perm) 1684 0 3462 0 314 3574
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 75 19
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Confl. Peds. (#/hr) 9 9
Peak Hour Factor 0.86 0.86 0.90 0.90 0.86 0.86
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 176 0 925 0 148 679
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 9.9 23.6 39.6 39.6
Actuated g/C Ratio 0.17 0.39 0.66 0.66
v/c Ratio 0.52 0.67 0.31 0.29
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2025 Existing Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Control Delay (s/veh) 21.5 18.2 5.8 4.7
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.5 18.2 5.8 4.7
LOS C B A A
Approach Delay (s/veh) 21.5 18.2 4.9
Approach LOS C B A
Queue Length 50th (ft) 32 131 15 41
Queue Length 95th (ft) 96 254 39 79
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1567 3212 721 3574
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.11 0.29 0.21 0.19
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 60
Natural Cycle: 45
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.67
Intersection Signal Delay (s/veh): 12.8 Intersection LOS: B
Intersection Capacity Utilization 52.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2025 Existing Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 33 29 29 871 644 11
Future Volume (vph) 33 29 29 871 644 11
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1787 1599 1787 3574 3539 1583
Flt Permitted 0.950 0.322
Satd. Flow (perm) 1787 1599 606 3574 3539 1583
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 37 13
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.78 0.78 0.91 0.91 0.80 0.80
Heavy Vehicles (%) 1% 1% 1% 1% 2% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 42 37 32 957 805 14
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.2 7.2 32.0 29.5 19.4 19.4
Actuated g/C Ratio 0.19 0.19 0.85 0.78 0.52 0.52
v/c Ratio 0.12 0.11 0.03 0.34 0.44 0.02
Control Delay (s/veh) 21.0 10.4 2.3 3.2 10.6 7.1
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2025 Existing Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.0 10.4 2.3 3.2 10.6 7.1
LOS C B A A B A
Approach Delay (s/veh) 16.1 3.2 10.6
Approach LOS B A B
Queue Length 50th (ft) 6 0 1 48 38 0
Queue Length 95th (ft) 33 17 8 73 145 8
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1648 1478 1285 3574 3264 1461
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.03 0.03 0.02 0.27 0.25 0.01
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 37.6
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.44
Intersection Signal Delay (s/veh): 6.9 Intersection LOS: A
Intersection Capacity Utilization 37.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Background Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 31 91 861 73 85 749
Future Volume (vph) 31 91 861 73 85 749
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1637 0 3429 0 1752 3505
Flt Permitted 0.987 0.155
Satd. Flow (perm) 1637 0 3429 0 286 3505
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 111 7
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Peak Hour Factor 0.63 0.63 0.89 0.89 0.87 0.87
Heavy Vehicles (%) 3% 3% 4% 4% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 193 0 1049 0 98 861
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 9.8 27.5 38.3 38.3
Actuated g/C Ratio 0.17 0.47 0.65 0.65
v/c Ratio 0.53 0.65 0.24 0.38
Control Delay (s/veh) 18.5 15.7 5.2 5.2
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Background Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 18.5 15.7 5.2 5.2
LOS B B A A
Approach Delay (s/veh) 18.5 15.7 5.2
Approach LOS B B A
Queue Length 50th (ft) 27 152 10 56
Queue Length 95th (ft) 49 274 28 107
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1521 3170 729 3505
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.13 0.33 0.13 0.25
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 59
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.65
Intersection Signal Delay (s/veh): 11.3 Intersection LOS: B
Intersection Capacity Utilization 50.9% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Background Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 2 2 22 986 773 2
Future Volume (vph) 2 2 22 986 773 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1504 1346 1736 3471 3471 1553
Flt Permitted 0.950 0.324
Satd. Flow (perm) 1504 1346 592 3471 3471 1553
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 4 2
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.50 0.50 0.88 0.88 0.91 0.91
Heavy Vehicles (%) 20% 20% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 4 4 25 1120 849 2
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.0 7.0 25.6 27.4 18.2 18.2
Actuated g/C Ratio 0.24 0.24 0.88 0.94 0.63 0.63
v/c Ratio 0.01 0.01 0.02 0.34 0.39 0.00
Control Delay (s/veh) 16.0 12.5 1.5 1.3 6.0 6.0
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Background Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 16.0 12.5 1.5 1.3 6.0 6.0
LOS B B A A A A
Approach Delay (s/veh) 14.3 1.3 6.0
Approach LOS B A A
Queue Length 50th (ft) 0 0 1 0 1 0
Queue Length 95th (ft) 6 4 6 85 183 4
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1437 1286 1472 3471 3316 1484
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.00 0.00 0.02 0.32 0.26 0.00
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 29
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.39
Intersection Signal Delay (s/veh): 3.3 Intersection LOS: A
Intersection Capacity Utilization 40.6% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Background Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 55 90 854 118 115 897
Future Volume (vph) 55 90 854 118 115 897
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1690 0 3499 0 1770 3539
Flt Permitted 0.981 0.126
Satd. Flow (perm) 1690 0 3499 0 235 3539
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 62 11
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Confl. Peds. (#/hr) 4 4
Peak Hour Factor 0.93 0.93 0.85 0.85 0.93 0.93
Heavy Vehicles (%) 1% 1% 1% 1% 2% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 156 0 1144 0 124 965
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 10.0 30.9 46.5 46.5
Actuated g/C Ratio 0.15 0.46 0.69 0.69
v/c Ratio 0.51 0.71 0.31 0.39
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Background Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Control Delay (s/veh) 25.1 17.4 5.7 4.9
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 25.1 17.4 5.7 4.9
LOS C B A A
Approach Delay (s/veh) 25.1 17.4 5.0
Approach LOS C B A
Queue Length 50th (ft) 34 181 13 68
Queue Length 95th (ft) 108 288 34 125
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1490 3071 643 3497
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.10 0.37 0.19 0.28
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 67
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.71
Intersection Signal Delay (s/veh): 12.3 Intersection LOS: B
Intersection Capacity Utilization 54.9% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Background Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 9 26 7 981 1045 4
Future Volume (vph) 9 26 7 981 1045 4
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1787 1599 1787 3574 3574 1599
Flt Permitted 0.950 0.209
Satd. Flow (perm) 1787 1599 393 3574 3574 1599
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 47 3
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.55 0.55 0.90 0.90 0.94 0.94
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 16 47 8 1090 1112 4
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.1 7.1 29.6 25.6 19.6 19.6
Actuated g/C Ratio 0.21 0.21 0.87 0.75 0.57 0.57
v/c Ratio 0.04 0.13 0.01 0.41 0.54 0.00
Control Delay (s/veh) 19.7 9.4 1.3 3.9 8.3 6.0
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Background Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 19.7 9.4 1.3 3.9 8.3 6.0
LOS B A A A A A
Approach Delay (s/veh) 12.0 3.9 8.3
Approach LOS B A A
Queue Length 50th (ft) 2 0 0 57 59 0
Queue Length 95th (ft) 14 10 3 79 244 5
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1675 1502 1323 3574 3351 1499
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.03 0.01 0.30 0.33 0.00
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 34.2
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.54
Intersection Signal Delay (s/veh): 6.3 Intersection LOS: A
Intersection Capacity Utilization 42.2% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Background Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 53 104 708 150 131 602
Future Volume (vph) 53 104 708 150 131 602
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1685 0 3462 0 1787 3574
Flt Permitted 0.983 0.159
Satd. Flow (perm) 1685 0 3462 0 299 3574
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 74 19
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Confl. Peds. (#/hr) 9 9
Peak Hour Factor 0.86 0.86 0.90 0.90 0.86 0.86
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 183 0 954 0 152 700
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 10.4 24.9 41.4 41.4
Actuated g/C Ratio 0.17 0.40 0.66 0.66
v/c Ratio 0.53 0.68 0.33 0.30
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Background Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Control Delay (s/veh) 22.7 18.7 6.1 4.8
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 22.7 18.7 6.1 4.8
LOS C B A A
Approach Delay (s/veh) 22.7 18.7 5.1
Approach LOS C B A
Queue Length 50th (ft) 36 142 16 45
Queue Length 95th (ft) 105 273 42 86
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1543 3159 700 3568
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.12 0.30 0.22 0.20
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 62.4
Natural Cycle: 45
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.68
Intersection Signal Delay (s/veh): 13.2 Intersection LOS: B
Intersection Capacity Utilization 53.6% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Background Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 34 30 30 897 663 11
Future Volume (vph) 34 30 30 897 663 11
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1787 1599 1787 3574 3539 1583
Flt Permitted 0.950 0.311
Satd. Flow (perm) 1787 1599 585 3574 3539 1583
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 38 13
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.78 0.78 0.91 0.91 0.80 0.80
Heavy Vehicles (%) 1% 1% 1% 1% 2% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 44 38 33 986 829 14
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.3 7.3 32.3 29.8 19.8 19.8
Actuated g/C Ratio 0.19 0.19 0.85 0.79 0.52 0.52
v/c Ratio 0.13 0.11 0.03 0.35 0.45 0.02
Control Delay (s/veh) 21.2 10.4 2.3 3.3 10.6 7.0
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Background Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.2 10.4 2.3 3.3 10.6 7.0
LOS C B A A B A
Approach Delay (s/veh) 16.2 3.2 10.6
Approach LOS B A B
Queue Length 50th (ft) 7 0 1 50 40 0
Queue Length 95th (ft) 34 18 8 77 151 8
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1641 1472 1279 3574 3251 1455
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.03 0.03 0.03 0.28 0.25 0.01
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 37.9
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.45
Intersection Signal Delay (s/veh): 7.0 Intersection LOS: A
Intersection Capacity Utilization 38.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 35 91 889 87 85 764
Future Volume (vph) 35 91 889 87 85 764
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1642 0 3426 0 1752 3505
Flt Permitted 0.986 0.144
Satd. Flow (perm) 1642 0 3426 0 266 3505
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 97 8
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Peak Hour Factor 0.63 0.63 0.89 0.89 0.87 0.87
Heavy Vehicles (%) 3% 3% 4% 4% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 200 0 1097 0 98 878
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 10.8 29.8 40.7 40.7
Actuated g/C Ratio 0.17 0.48 0.65 0.65
v/c Ratio 0.55 0.67 0.25 0.39
Control Delay (s/veh) 21.5 16.3 5.6 5.4
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.5 16.3 5.6 5.4
LOS C B A A
Approach Delay (s/veh) 21.5 16.3 5.5
Approach LOS C B A
Queue Length 50th (ft) 36 172 11 63
Queue Length 95th (ft) 61 301 29 116
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1478 3062 698 3483
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.14 0.36 0.14 0.25
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 62.5
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.67
Intersection Signal Delay (s/veh): 12.1 Intersection LOS: B
Intersection Capacity Utilization 52.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 2 2 22 1006 802 2
Future Volume (vph) 2 2 22 1006 802 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1504 1346 1736 3471 3471 1553
Flt Permitted 0.950 0.310
Satd. Flow (perm) 1504 1346 566 3471 3471 1553
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 4 2
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.50 0.50 0.88 0.88 0.91 0.91
Heavy Vehicles (%) 20% 20% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 4 4 25 1143 881 2
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.0 7.0 25.9 27.7 18.5 18.5
Actuated g/C Ratio 0.24 0.24 0.88 0.95 0.63 0.63
v/c Ratio 0.01 0.01 0.02 0.35 0.40 0.00
Control Delay (s/veh) 16.5 13.0 1.4 1.3 6.0 6.0
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 16.5 13.0 1.4 1.3 6.0 6.0
LOS B B A A A A
Approach Delay (s/veh) 14.8 1.3 6.0
Approach LOS B A A
Queue Length 50th (ft) 0 0 1 0 1 0
Queue Length 95th (ft) 6 4 6 87 191 4
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1433 1283 1460 3471 3308 1480
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.00 0.00 0.02 0.33 0.27 0.00
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 29.3
Natural Cycle: 55
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.40
Intersection Signal Delay (s/veh): 3.4 Intersection LOS: A
Intersection Capacity Utilization 41.1% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
3: US Route 9 & North Access 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 5
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 21 35 995 16 15 779
Future Volume (vph) 21 35 995 16 15 779
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 150
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1690 0 3466 0 1787 3471
Flt Permitted 0.982 0.950
Satd. Flow (perm) 1690 0 3466 0 1787 3471
Link Speed (mph) 30 55 55
Link Distance (ft) 298 272 2068
Travel Time (s) 6.8 3.4 25.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Heavy Vehicles (%) 1% 1% 4% 1% 1% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 62 0 1124 0 17 866
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 38.0% ICU Level of Service A
Analysis Period (min) 15
HCM 7th TWSC
3: US Route 9 & North Access 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 6
Intersection
Int Delay, s/veh 0.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 21 35 995 16 15 779
Future Vol, veh/h 21 35 995 16 15 779
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 1 1 4 1 1 4
Mvmt Flow 23 39 1106 18 17 866
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1581 562 0 0 1123 0
Stage 1 1114 - - - - -
Stage 2 466 - - - - -
Critical Hdwy 6.82 6.92 - - 4.12 -
Critical Hdwy Stg 1 5.82 - - - - -
Critical Hdwy Stg 2 5.82 - - - - -
Follow-up Hdwy 3.51 3.31 - - 2.21 -
Pot Cap-1 Maneuver 101 473 - - 623 -
Stage 1 278 - - - - -
Stage 2 601 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 98 473 - - 623 -
Mov Cap-2 Maneuver 209 - - - - -
Stage 1 278 - - - - -
Stage 2 585 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 18.88 0 0.21
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 321 623 -
HCM Lane V/C Ratio - - 0.194 0.027 -
HCM Ctrl Dly (s/v) - - 18.9 10.9 -
HCM Lane LOS - - C B -
HCM 95th %tile Q(veh) - - 0.7 0.1 -
Lanes, Volumes, Timings
4: US Route 9 & South Access 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 7
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 7 7 1004 4 4 796
Future Volume (vph) 7 7 1004 4 4 796
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 150
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1711 0 3468 0 1787 3471
Flt Permitted 0.976 0.950
Satd. Flow (perm) 1711 0 3468 0 1787 3471
Link Speed (mph) 30 55 55
Link Distance (ft) 319 2527 272
Travel Time (s) 7.3 31.3 3.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Heavy Vehicles (%) 1% 1% 4% 1% 1% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 16 0 1120 0 4 884
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 37.9% ICU Level of Service A
Analysis Period (min) 15
HCM 7th TWSC
4: US Route 9 & South Access 11/21/2025
2028 Build Conditions - Weekday Morning Peak Hour Synchro 12 Report
GTS Consulting Page 8
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 7 7 1004 4 4 796
Future Vol, veh/h 7 7 1004 4 4 796
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 1 1 4 1 1 4
Mvmt Flow 8 8 1116 4 4 884
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1569 560 0 0 1120 0
Stage 1 1118 - - - - -
Stage 2 451 - - - - -
Critical Hdwy 6.82 6.92 - - 4.12 -
Critical Hdwy Stg 1 5.82 - - - - -
Critical Hdwy Stg 2 5.82 - - - - -
Follow-up Hdwy 3.51 3.31 - - 2.21 -
Pot Cap-1 Maneuver 103 474 - - 625 -
Stage 1 276 - - - - -
Stage 2 611 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 102 474 - - 625 -
Mov Cap-2 Maneuver 211 - - - - -
Stage 1 276 - - - - -
Stage 2 607 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 18 0 0.05
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 292 625 -
HCM Lane V/C Ratio - - 0.053 0.007 -
HCM Ctrl Dly (s/v) - - 18 10.8 -
HCM Lane LOS - - C B -
HCM 95th %tile Q(veh) - - 0.2 0 -
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 67 90 879 130 115 947
Future Volume (vph) 67 90 879 130 115 947
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1700 0 3495 0 1770 3539
Flt Permitted 0.979 0.119
Satd. Flow (perm) 1700 0 3495 0 222 3539
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 51 12
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Confl. Peds. (#/hr) 4 4
Peak Hour Factor 0.93 0.93 0.85 0.85 0.93 0.93
Heavy Vehicles (%) 1% 1% 1% 1% 2% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 169 0 1187 0 124 1018
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 11.3 33.7 49.5 49.5
Actuated g/C Ratio 0.16 0.47 0.69 0.69
v/c Ratio 0.54 0.72 0.32 0.41
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Control Delay (s/veh) 28.9 18.1 6.1 5.3
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 28.9 18.1 6.1 5.3
LOS C B A A
Approach Delay (s/veh) 28.9 18.1 5.4
Approach LOS C B A
Queue Length 50th (ft) 46 202 15 81
Queue Length 95th (ft) 131 316 37 145
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1444 2955 610 3452
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.12 0.40 0.20 0.29
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 71.3
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay (s/veh): 13.0 Intersection LOS: B
Intersection Capacity Utilization 56.6% ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 9 26 7 1043 1071 4
Future Volume (vph) 9 26 7 1043 1071 4
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1787 1599 1787 3574 3574 1599
Flt Permitted 0.950 0.201
Satd. Flow (perm) 1787 1599 378 3574 3574 1599
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 47 3
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.55 0.55 0.90 0.90 0.94 0.94
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 16 47 8 1159 1139 4
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.1 7.1 29.9 26.3 20.1 20.1
Actuated g/C Ratio 0.20 0.20 0.86 0.76 0.58 0.58
v/c Ratio 0.04 0.13 0.01 0.43 0.55 0.00
Control Delay (s/veh) 20.1 9.6 1.3 4.0 8.4 6.0
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 20.1 9.6 1.3 4.0 8.4 6.0
LOS C A A A A A
Approach Delay (s/veh) 12.3 3.9 8.3
Approach LOS B A A
Queue Length 50th (ft) 2 0 0 63 64 0
Queue Length 95th (ft) 14 10 3 86 252 5
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1672 1499 1308 3574 3345 1497
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.03 0.01 0.32 0.34 0.00
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 34.7
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.55
Intersection Signal Delay (s/veh): 6.3 Intersection LOS: A
Intersection Capacity Utilization 42.9% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
3: US Route 9 & North Access 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 5
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 19 31 996 50 50 1061
Future Volume (vph) 19 31 996 50 50 1061
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 150
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1692 0 3549 0 1787 3539
Flt Permitted 0.981 0.950
Satd. Flow (perm) 1692 0 3549 0 1787 3539
Link Speed (mph) 30 55 55
Link Distance (ft) 298 272 2068
Travel Time (s) 6.8 3.4 25.6
Peak Hour Factor 0.90 0.90 0.88 0.88 0.93 0.93
Heavy Vehicles (%) 1% 1% 1% 1% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 55 0 1189 0 54 1141
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 45.8% ICU Level of Service A
Analysis Period (min) 15
HCM 7th TWSC
3: US Route 9 & North Access 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 6
Intersection
Int Delay, s/veh 0.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 19 31 996 50 50 1061
Future Vol, veh/h 19 31 996 50 50 1061
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 88 88 93 93
Heavy Vehicles, % 1 1 1 1 1 2
Mvmt Flow 21 34 1132 57 54 1141
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1838 594 0 0 1189 0
Stage 1 1160 - - - - -
Stage 2 678 - - - - -
Critical Hdwy 6.82 6.92 - - 4.12 -
Critical Hdwy Stg 1 5.82 - - - - -
Critical Hdwy Stg 2 5.82 - - - - -
Follow-up Hdwy 3.51 3.31 - - 2.21 -
Pot Cap-1 Maneuver 68 450 - - 589 -
Stage 1 262 - - - - -
Stage 2 468 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 62 450 - - 589 -
Mov Cap-2 Maneuver 174 - - - - -
Stage 1 262 - - - - -
Stage 2 426 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 20.92 0 0.53
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 281 589 -
HCM Lane V/C Ratio - - 0.198 0.091 -
HCM Ctrl Dly (s/v) - - 20.9 11.7 -
HCM Lane LOS - - C B -
HCM 95th %tile Q(veh) - - 0.7 0.3 -
Lanes, Volumes, Timings
4: US Route 9 & South Access 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 7
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 7 6 1040 12 12 1068
Future Volume (vph) 7 6 1040 12 12 1068
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 150
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1717 0 3567 0 1787 3539
Flt Permitted 0.974 0.950
Satd. Flow (perm) 1717 0 3567 0 1787 3539
Link Speed (mph) 30 55 55
Link Distance (ft) 319 2527 272
Travel Time (s) 7.3 31.3 3.4
Peak Hour Factor 0.90 0.90 0.88 0.88 0.93 0.93
Heavy Vehicles (%) 1% 1% 1% 1% 1% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 15 0 1196 0 13 1148
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 39.5% ICU Level of Service A
Analysis Period (min) 15
HCM 7th TWSC
4: US Route 9 & South Access 11/21/2025
2028 Build Conditions - Weekday Evening Peak Hour Synchro 12 Report
GTS Consulting Page 8
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 7 6 1040 12 12 1068
Future Vol, veh/h 7 6 1040 12 12 1068
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 88 88 93 93
Heavy Vehicles, % 1 1 1 1 1 2
Mvmt Flow 8 7 1182 14 13 1148
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1789 598 0 0 1195 0
Stage 1 1189 - - - - -
Stage 2 600 - - - - -
Critical Hdwy 6.82 6.92 - - 4.12 -
Critical Hdwy Stg 1 5.82 - - - - -
Critical Hdwy Stg 2 5.82 - - - - -
Follow-up Hdwy 3.51 3.31 - - 2.21 -
Pot Cap-1 Maneuver 73 448 - - 585 -
Stage 1 254 - - - - -
Stage 2 514 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 72 448 - - 585 -
Mov Cap-2 Maneuver 182 - - - - -
Stage 1 254 - - - - -
Stage 2 502 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 20.23 0 0.13
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 251 585 -
HCM Lane V/C Ratio - - 0.058 0.022 -
HCM Ctrl Dly (s/v) - - 20.2 11.3 -
HCM Lane LOS - - C B -
HCM 95th %tile Q(veh) - - 0.2 0.1 -
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 1
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 62 104 743 168 131 639
Future Volume (vph) 62 104 743 168 131 639
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 200
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1690 0 3454 0 1787 3574
Flt Permitted 0.982 0.145
Satd. Flow (perm) 1690 0 3454 0 272 3574
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 64 20
Link Speed (mph) 35 55 40
Link Distance (ft) 1221 2068 1199
Travel Time (s) 23.8 25.6 20.4
Confl. Peds. (#/hr) 9 9
Peak Hour Factor 0.86 0.86 0.90 0.90 0.86 0.86
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 193 0 1013 0 152 743
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Turn Type Prot NA pm+pt NA
Protected Phases 3 6 5 1
Permitted Phases 1
Detector Phase 3 6 5 1
Switch Phase
Minimum Initial (s) 6.0 15.0 6.0 15.0
Minimum Split (s) 11.0 20.0 11.0 20.0
Total Split (s) 65.0 65.0 25.0 90.0
Total Split (%) 41.9% 41.9% 16.1% 58.1%
Maximum Green (s) 60.0 60.0 20.0 85.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 2.0 5.0 2.0 5.0
Recall Mode None Min None Min
Act Effct Green (s) 11.6 27.7 44.6 44.6
Actuated g/C Ratio 0.17 0.41 0.67 0.67
v/c Ratio 0.56 0.70 0.34 0.31
Lanes, Volumes, Timings
1: US Route 9 & Crescent Avenue 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 2
Lane Group WBL WBR NBT NBR SBL SBT
Control Delay (s/veh) 25.6 19.6 6.5 5.2
Queue Delay 0.0 0.0 0.0 0.0
Total Delay (s/veh) 25.6 19.6 6.5 5.2
LOS C B A A
Approach Delay (s/veh) 25.6 19.6 5.4
Approach LOS C B A
Queue Length 50th (ft) 46 163 18 53
Queue Length 95th (ft) 124 307 44 98
Internal Link Dist (ft) 1141 1988 1119
Turn Bay Length (ft) 200
Base Capacity (vph) 1492 3036 659 3522
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.13 0.33 0.23 0.21
Intersection Summary
Area Type: Other
Cycle Length: 155
Actuated Cycle Length: 66.8
Natural Cycle: 45
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay (s/veh): 14.1 Intersection LOS: B
Intersection Capacity Utilization 55.7% ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 1: US Route 9 & Crescent Avenue
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 3
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 34 30 30 943 698 11
Future Volume (vph) 34 30 30 943 698 11
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 400 0 375 200
Storage Lanes 1 1 1 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1787 1599 1787 3574 3539 1583
Flt Permitted 0.950 0.292
Satd. Flow (perm) 1787 1599 549 3574 3539 1583
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 38 12
Link Speed (mph) 30 55 55
Link Distance (ft) 781 1752 2527
Travel Time (s) 17.8 21.7 31.3
Peak Hour Factor 0.78 0.78 0.91 0.91 0.80 0.80
Heavy Vehicles (%) 1% 1% 1% 1% 2% 2%
Shared Lane Traffic (%)
Lane Group Flow (vph) 44 38 33 1036 873 14
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Turn Type Prot Perm pm+pt NA NA Perm
Protected Phases 7 2 5 1
Permitted Phases 7 5 1
Detector Phase 7 7 2 5 1 1
Switch Phase
Minimum Initial (s) 6.0 6.0 15.0 15.0 6.0 6.0
Minimum Split (s) 11.0 11.0 20.0 20.0 11.0 11.0
Total Split (s) 50.0 50.0 25.0 75.0 50.0 50.0
Total Split (%) 40.0% 40.0% 20.0% 60.0% 40.0% 40.0%
Maximum Green (s) 45.0 45.0 20.0 70.0 45.0 45.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None Min None None
Act Effct Green (s) 7.4 7.4 32.9 30.4 20.4 20.4
Actuated g/C Ratio 0.19 0.19 0.85 0.79 0.53 0.53
v/c Ratio 0.13 0.11 0.03 0.37 0.46 0.02
Control Delay (s/veh) 21.6 10.6 2.3 3.3 10.7 7.2
Lanes, Volumes, Timings
2: US Route 9 & E West Road 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 4
Lane Group EBL EBR NBL NBT SBT SBR
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 21.6 10.6 2.3 3.3 10.7 7.2
LOS C B A A B A
Approach Delay (s/veh) 16.5 3.3 10.6
Approach LOS B A B
Queue Length 50th (ft) 7 0 1 54 43 0
Queue Length 95th (ft) 35 18 8 84 161 9
Internal Link Dist (ft) 701 1672 2447
Turn Bay Length (ft) 400 375 200
Base Capacity (vph) 1630 1462 1267 3574 3229 1445
Starvation Cap Reductn 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0
Reduced v/c Ratio 0.03 0.03 0.03 0.29 0.27 0.01
Intersection Summary
Area Type: Other
Cycle Length: 125
Actuated Cycle Length: 38.5
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.46
Intersection Signal Delay (s/veh): 7.0 Intersection LOS: A
Intersection Capacity Utilization 39.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: US Route 9 & E West Road
Lanes, Volumes, Timings
3: US Route 9 & North Access 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 5
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 26 44 940 37 37 683
Future Volume (vph) 26 44 940 37 37 683
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 150
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1690 0 3553 0 1787 3574
Flt Permitted 0.982 0.950
Satd. Flow (perm) 1690 0 3553 0 1787 3574
Link Speed (mph) 30 55 55
Link Distance (ft) 298 272 2068
Travel Time (s) 6.8 3.4 25.6
Peak Hour Factor 0.90 0.90 0.90 0.90 0.83 0.83
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 78 0 1085 0 45 823
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 41.6% ICU Level of Service A
Analysis Period (min) 15
HCM 7th TWSC
3: US Route 9 & North Access 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 6
Intersection
Int Delay, s/veh 1
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 26 44 940 37 37 683
Future Vol, veh/h 26 44 940 37 37 683
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 83 83
Heavy Vehicles, % 1 1 1 1 1 1
Mvmt Flow 29 49 1044 41 45 823
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1566 543 0 0 1086 0
Stage 1 1065 - - - - -
Stage 2 501 - - - - -
Critical Hdwy 6.82 6.92 - - 4.12 -
Critical Hdwy Stg 1 5.82 - - - - -
Critical Hdwy Stg 2 5.82 - - - - -
Follow-up Hdwy 3.51 3.31 - - 2.21 -
Pot Cap-1 Maneuver 103 487 - - 644 -
Stage 1 295 - - - - -
Stage 2 577 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 96 487 - - 644 -
Mov Cap-2 Maneuver 213 - - - - -
Stage 1 295 - - - - -
Stage 2 537 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 19.29 0 0.57
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 329 644 -
HCM Lane V/C Ratio - - 0.236 0.069 -
HCM Ctrl Dly (s/v) - - 19.3 11 -
HCM Lane LOS - - C B -
HCM 95th %tile Q(veh) - - 0.9 0.2 -
Lanes, Volumes, Timings
4: US Route 9 & South Access 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 7
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 9 9 968 9 9 700
Future Volume (vph) 9 9 968 9 9 700
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 150
Storage Lanes 1 0 0 1
Taper Length (ft) 25 25
Satd. Flow (prot) 1711 0 3571 0 1787 3574
Flt Permitted 0.976 0.950
Satd. Flow (perm) 1711 0 3571 0 1787 3574
Link Speed (mph) 30 55 55
Link Distance (ft) 319 2527 272
Travel Time (s) 7.3 31.3 3.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.83 0.83
Heavy Vehicles (%) 1% 1% 1% 1% 1% 1%
Shared Lane Traffic (%)
Lane Group Flow (vph) 20 0 1086 0 11 843
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Right Left Left
Median Width(ft) 12 12 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane Yes Yes
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 9 15
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 37.0% ICU Level of Service A
Analysis Period (min) 15
HCM 7th TWSC
4: US Route 9 & South Access 11/21/2025
2028 Build Conditions - Saturday Midday Peak Hour Synchro 12 Report
GTS Consulting Page 8
Intersection
Int Delay, s/veh 0.2
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 9 9 968 9 9 700
Future Vol, veh/h 9 9 968 9 9 700
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - 150 -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 90 90 90 90 83 83
Heavy Vehicles, % 1 1 1 1 1 1
Mvmt Flow 10 10 1076 10 11 843
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1524 543 0 0 1086 0
Stage 1 1081 - - - - -
Stage 2 443 - - - - -
Critical Hdwy 6.82 6.92 - - 4.12 -
Critical Hdwy Stg 1 5.82 - - - - -
Critical Hdwy Stg 2 5.82 - - - - -
Follow-up Hdwy 3.51 3.31 - - 2.21 -
Pot Cap-1 Maneuver 110 487 - - 644 -
Stage 1 289 - - - - -
Stage 2 617 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 108 487 - - 644 -
Mov Cap-2 Maneuver 220 - - - - -
Stage 1 289 - - - - -
Stage 2 606 - - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 17.72 0 0.14
HCM LOS C
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h) - - 303 644 -
HCM Lane V/C Ratio - - 0.066 0.017 -
HCM Ctrl Dly (s/v) - - 17.7 10.7 -
HCM Lane LOS - - C B -
HCM 95th %tile Q(veh) - - 0.2 0.1 -