Loading...
HomeMy WebLinkAbout20250975 20 Empire Ave Area Variance Presentation (PowerPoint) Saratoga Zoning Board Presentation Timothy Mumford 20 Empire Ave 12/8/2025 1 History & Scope History: Home was built in 2002 and purchased in July, 2021 as seen in upcoming images. Scope: Front deck with timber frame gable roof, approximately 14.5’ x 17.5’ tied into existing structure at porch and garage with extension 7’ to front door. Back deck with timber frame gable roof, approximately 36’ x 25’ (as part of main body) with side extension back to primary bedroom 8’ 2 Variance required to align roof to existing structure for overhang 3 4 Existing roof line at overhang corner to property line = 7.5’ Existing building corner to property line = 8.5’ 5 Pre-build survey from Aug 27, 2021 at build by Bonacio 6 Tie in is important to the aesthetic of the continual roofline. 7 Thank you! 8