Loading...
HomeMy WebLinkAbout20251031 19 Washington St Adelphi/Bethesda Site Plan Cost EstimateCost Estimate for Letter of Credit PB #XX.XXXX Project No: 2020049 Project: 19 Washington Location: 19 Washington Street Saratoga Springs, New York Date: 10/31/2025 ON-SITE WORK Item Quantity Unit Unit Cost Subtotal Site Preparation and Grading Erosion Control (including silt fence & construction access)1 LS $3,000.00 $3,000.00 Demolition 1 LS $15,000.00 $15,000.00 Hardscape Concrete Pavement 148 SF $5.50 $814.00 Pavers 1,065 SF $7.00 $7,455.00 Site Amenities Landscaping 1 LS $10,000.00 $10,000.00 Fence 25 LF $45.00 $1,125.00 Concrete Curb 137 LF $40.00 $5,480.00 Utilities 6" PVC Sanitary line 5 LF $55.00 $275.00 8" HDPE 98 LF $40.00 $3,920.00 6" DIP Waterline 6 LF $90.00 $540.00 Yard Drain 3 EA $1,750.00 $5,250.00 Trench Drain 1 LS $3,000.00 $3,000.00 Storm Connection 1 LS $1,500.00 $1,500.00 On-Site Total $57,359.00 On-Site Total X .25 $14,339.75 OFF-SITE WORK Utilities Traffic Control 1 LS $15,000.00 $15,000.00 6" PVC Sanitary line 22 LF $55.00 $1,210.00 6" DIP Waterline 28 LF $90.00 $2,520.00 Water Service Curb Box 1 EA $750.00 $750.00 Sanitary Connection 1 LS $1,500.00 $1,500.00 10" Water Main Connection 1 EA $4,500.00 $4,500.00 10"x6" Tee / Valve 1 EA $2,800.00 $2,800.00 Hardscape Concrete Sidewalk 460 SF $5.50 $2,530.00 Amenities Decorative Street Light-Relocated 1 EA $1,000.00 $1,000.00 As Built Drawings 1 LS $2,500.00 $2,500.00 Off-Site Total $34,310.00 Total Site Work $91,669.00 Letter of Credit Amounts Total off-site work $34,310.00 Total on-site work x .25 $14,339.75 Subtotal $48,649.75 L.O.C. amount $50,000.00