Loading...
HomeMy WebLinkAbout20230233 Station Lane Site Plan Nature Trail Cost EstimateLANSING ENGINEERING, PC 2452 NYS Route 9, Suite 301, Malta NY 12020 Tel: 899-5243 Fax: 899-5245 FADEN - WEST AVE SITE PLAN Nature Trail Cost Opinion CITY OF SARATOGA SPRINGS, NEW YORK 2/3/2025 LABOR AND MATERIAL ITEM UNIT QUANTITY UNIT COST SUBTOTAL 8' WIDE PATH EXTENSION Site Prep & Earthwork SELECTIVE BRUSH CLEARING (BRUSH SAW) ACRE 0.15 $ 2,350.00 $ 353 SELECTIVE TREE CLEARING (CHAINSAWS) EA 30 $ 300.00 $ 9,000 STRIP & STOCKPILE 4" TOPSOIL SY 440 $ 3.80 $ 1,672 Trail Construction WOVEN TEXTILE SY 440 $ 1.50 $ 660 4" BARK MULCH (HAND SPREAD) SY 440 $ 10.00 $ 4,400 SIGNAGE EA 1 $ 200.00 $ 200 Erosion Control SILT FENCE LF 225 $ 1.50 $ 338 SUBTOTAL $ 16,622 Miscellaneous 3% Mobilization & Setup 3% $ 16,622.00 $ 499 10%Contingency 10% $ 16,622.00 1$ 1,662 CONSTRUCTION SUBTOTAL $ 18,783 5% Engineering, Legal, & Admin Fees LS 5% $ 18,782.86 $ 1 939 TOTAL $ 19,722 Item costs were determined by referencing the "RS Means Site Work and Landscape Cost Data", "RS Means Heavy Construction Cost Data", the New York State Department of Transportation weighted average bid prive program, as well as similar projects and professional experience.