HomeMy WebLinkAbout20190497 South Broadway Hotel Balzer and Tuck Response 10-10-19 BALZ ER E$ TUCK
i, lLIlitectuiv
October 10, 2019
Mark Torpey, Planning Board Chair
City of Saratoga Springs
474 Broadway
Saratoga Springs, NY 12866
Mr.Torpey,
In response to the questions raised at the October 3`d, 2019 Planning Board meeting regarding the
energy efficiency of the proposed South Broadway Hotel,we offer the following:
1. What kind of building heating and cooling systems has the development team considered?
a. We have evaluated multiple HVAC systems for this building including traditional PTAC
units,Variable Refrigerant Package(VRP)units as well as a central Water Source Heat Pump
system. The proposed VRP system is 25% more efficient (13.0 EER) than the minimum
efficiency requirements(10.4 EER)set forth by the International Energy Conservation Code.
We are also currently exploring the possibility of installing photovoltaic panels on the roof
as a source of renewable energy for the building,but the logistical and financial implications
have not been fully vetted at this time. We anticipate a decision on photovoltaics before
site plan approval is sought.
2. What are the hotel brand requirements for the building?
a. The VRP system we are proposing is the system preferred by Marriott International based
on their extensive experience with multiple different types of systems for similar
occupancies.
3. Will there be continuous building commissioning to make ensure that the HVAC systems are
running correctly?
a. Building commissioning is required by the International Energy Conservation Code and a
commissioning agent will be enlisted by the development team to oversee the
commissioning process. All systems will be reviewed and commissioned by this agent
throughout design and construction.As for the operation of the units after construction,the
guest room units will be individually controlled and will be programmed to'set back'when
unoccupied based on continuous monitoring from an occupancy sensor in the room. All
central building systems will be controlled by a Building Management System that will
provide continuous monitoring and alarms upon failure.
If you have additional questions regarding the energy efficiency of the proposed building, we will
happily address them at the October 17`h meeting.
Thanks,
Shawn Corp
Senior Associate
468 Broadway
Saratoga Springs,New York 12866
p 518.580.8818 w balzertuck.com
Draft- October 10,2019
AGREEMENT
The date of this Agreement (this "Agreement") is , 2019. The parties to
this Agreement are:
Wesley Realty Company,Inc.
6867 Rt 89
Ovid, NY 14521
a New York corporation (the"Restaurant Owner"); and
Larkin Saratoga Property,LLC
410 Shelburne Road
South Burlington, VT 05403
a New York limited liability company (the "Hotel Owner").
Recitals
A. The Restaurant Owner is the owner of lands and premises in the City of Saratoga
Springs more particularly described on Exhibit A(the "Restaurant Parcel"). The Hotel Owner is
the owner of lands and premises in the City of Saratoga more particularly described on Exhibit B
(the"Hotel Parcel").
B. The Restaurant Parcel and the Hotel Parcel share a common boundary.
C. Currently customers and agents of the Restaurant Owner access the Restaurant
Parcel through Lincoln Avenue and vehicles are parked in parking spaces on the Restaurant Parcel.
D. The Hotel Owner has proposed that the access to the Restaurant Parcel be
eliminated and that a new vehicle parking arrangement be established for the Restaurant Parcel
and the Hotel Parcel.
Terms and Provisions
In consideration of Ten and More Dollars and for other good and valuable consideration,
the receipt and sufficiency of which is acknowledged by the parties, the parties agree as follows:
1
Section 1. Condition Precedent.
The obligations of the parties set forth in Sections 2 and 3 are subject to receipt by the
Hotel Owner of final approvals from all governmental authorities having jurisdiction for its
proposed approximately 120-room,four-story hotel project,including approval from the municipal
Planning Board. "Approval" means approval, in form acceptable to the Hotel Owner, without an
appeal.
Section 2. Grant of Easement.
The Hotel Owner shall grant and convey to the Restaurant Owner a non-exclusive easement
in customary form (the"Easement"), for the parking of customer and agent motor vehicles during
business hours in the parking area on the Hotel Parcel, together with ingress and egress from and
to Lincoln Avenue. The text of the easement will provide for
(a) six designated shared parking spaces adjacent to the Restaurant Parcel and
(b) provide for directional signs (in size, shape and location as approved by the Design
Review Commission) indicating the parking location for the Restaurant Parcel; attached hereto as
Exhibit A are a draft plan showing the proposed location of two signs and drawings depicting the
signs). If the municipality does not approve the size, shape or location of the signs, the parties
shall work together in good faith to establish an appropriate alternative.
(c) The Easement shall be subject to such reasonable, non-discriminatory rules as the
Hotel Owner may, from time to time, impose on all users of its parking area. To the extent not
prohibited by the hotel franchise agreement contemplated by the Hotel Owner, the Hotel Owner
shall cooperate with the Restaurant Owner to allow for overflow parking on the Hotel Parcel on
terms satisfactory to the parties.
The Hotel Owner shall be responsible for (i) the maintenance, repair and replacement of
the parking area, including the surface area and landscaping, on the Hotel Parcel, including line
striping and snow removal and(ii)for so long as the Restaurant Parcel is used as a restaurant with
the same or similar menu and service, snow removal from the seven existing parking spaces on
the Restaurant Parcel.
Section 4. Termination of Curb Cut.
The Restaurant Owner shall execute such documents and instruments (the Termination
Documents")as shall be required to terminate the legal and physical access to the Restaurant Parcel
through the curb cut located on the Restaurant Parcel.
Section 4. Delivery of Easement and Termination Documents.
2
(a) At such time as the Hotel Owner shall give notice to the Restaurant Owner that the
condition set forth in Section 1 has been satisfied, at a time and place convenient to the parties and
within five days after delivery of the notice,
(i) the Hotel Owner shall execute and deliver to the Restaurant Owner the
Easement and all documents and instruments customarily required for
recording in the Registry of Deeds; and
(ii) the Restaurant Owner shall execute and deliver to the Hotel Owner the
Termination Documents and all documents and instruments customarily
required for recording in the Registry of Deeds.
(b) The notice required by subsection (a) shall be in writing and shall be delivered by
hand or mailed by first-class registered or certified mail,postage prepaid,to the Restaurant Owner
at its address set forth at the beginning of this Agreement or at such other address as it may have
furnished to the Hotel Owner in writing.
(c) If the notice required by subsection (a) is not given prior to December 31, 2020,
either party may terminate this Agreement.
Section 5. Successors Bound.
This Agreement shall inure to the benefit of, and be binding on, the Restaurant Owner,the
Hotel Owner and their respective successors and assigns.
Section 6. Amendments.
Neither this Agreement nor any term hereof may be changed, waived, discharged, or
terminated orally, but only by an agreement in writing signed by the parties hereto.
Section 7. Duplicate Originals.
This Agreement may be executed in any number of counterparts, each of which shall be an
original, but all of which together shall constitute one and the same instrument.
Section 7. Further Assurances.
Each party shall do, execute, acknowledge, and deliver all such further acts, instruments
and assurances, and to take all such further action as shall be necessary or desirable to carry out
this Agreement and effect the transactions contemplated hereby.
IN WITNESS WHEREOF,the parties have signed this Agreement.
3
Wesley Realty Company,Inc. Larkin Saratoga Property,
LLC
By: By:
16833\132
4
J 8i
F €QTthN
HA « ,t, q 2, an .51, r3 � x. ., as N
I
133211S 0001 t t I
TAME I
a�s.'' I fI • Alii
� LI - I JJ I ,m. u
_ ___________,__r
® � _
•
,.oz
W
H ,- 101 a
o
m aE
4a
0, ao � o I 5�
FriL 0, I
_ If' o 0
.o�a� oo, ooa� - — vu Eli d Ism
i 1 = fixm
00000001 , Ila o l
330 69, LEL) .�.;, f0%Eco
4211V___!-- ry ac�IA i;i Q. — -
+ m a
R
O
A
_....,,,,..0
, , . ,.%
, „„. ,
, ,
a ,
O I I I
—— (13330—— `,S F-7,/ 0334 OO'OSl I•"%r
111
_––\------ – --)r,'I' -;?: .' '' N
w .
` ppN
'N1"1
– /
\—– ,---, ,--'-'
,
g 2:2 ooeg 7
NU
cn
A#4/4
P
<f p — ,,
,,,-='g
— __ ham
W yAx a
(n 2 a 2 2 a