Loading...
HomeMy WebLinkAbout20250341 3/26 Finley St. Rise Housing Demolition and Construction CorrespondanceOutlook RE: RISE Finley streety apar tments solar amended DRC application From Laura Koss <laura@re4ormarchitecture.com> Date Thu 9/4/2025 8:45 AM To Julia Destino <Julia.Destino@saratoga-springs.org> Cc Lindsey Connors <lconnors@riseservices.org>; Mike Newman <mnewman@csdhousing.com>; Keri Curtis <KCurtis@csdhousing.com>; Vickie Messner <vmessner@csdhousing.com>; Joe Bodine <joeb@greenrater.com>; mattm@bonacioconst.com <mattm@bonacioconst.com>; thomas@bonacioconst.com <thomas@bonacioconst.com> Caution: This is an external email and may have suspicious content or subject. Please take care when clicking links or opening attachments. When in doubt, contact IT. Hi Julia, Thank you for sharing with the committee & getting back to us. Yes, we can make sure the solar panel supports are black. Yes, we can enclose the equipment in a ventilated cabinet if it is required. The equipment emits heat so if the cabinet could be avoided it would be preferred. Would it be possible to review the need for the cabinet once the system is installed? After installation review If the DRC still wants the enclosure, then it will be detailed & provided. Please advise if after review of these responses if this can be a consent item. Thanks, Laura Laura Koss From: Julia Destino <Julia.Destino@saratoga-springs.org> Sent: Wednesday, September 3, 2025 7:17 PM To: Laura Koss <laura@re4ormarchitecture.com> Subject: Re: RISE Finley streety apartments solar amended DRC application 9/5/25, 9:32 AM Mail - Julia Destino - Outlook https://outlook.office365.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AxlDIuR%2FRMEO89B%2FMS6nl%2BQABPnf3UwAA 1/4 Hi Laura, We reviewed this at the workshop this evening, and I can most likely move this to consent. Just need you to confirm a couple of things for me: 1. is the framing for the solar panels black? 2. since the equipment cannot be painted, please confirm that you will enclose it in a paintable enclosure. I will check with Tamie, but I should be able to get the actual enclosure administratively approved at a later date. Thank you! Julia Destino Planner City of Saratoga Springs 474 Broadway Saratoga Springs, NY 12866 Phone: 518-587-3550 ext. 2533 From: Laura Koss <laura@re4ormarchitecture.com> Sent: Tuesday, September 2, 2025 2:45 PM To: Julia Destino <Julia.Destino@saratoga-springs.org> Cc: Sybil Newell <snewell@riseservices.org>; Lindsey Connors <lconnors@riseservices.org>; Mike Newman <mnewman@csdhousing.com>; Keri Curtis <KCurtis@csdhousing.com>; Vickie Messner <vmessner@csdhousing.com>; thomas@bonacioconst.com <thomas@bonacioconst.com>; mattm@bonacioconst.com <mattm@bonacioconst.com> Subject: RE: RISE Finley streety apartments solar amended DRC application Caution: This is an external email and may have suspicious content or subject. Please take care when clicking links or opening attachments. When in doubt, contact IT. Hi Julia, Attached are new drawings with the solar panels & the equipment shown. On page 2 & 3 of the drawings I showed the panels & equipment in red so it is easily spotted. But the reality is from the ground you will not really see the equipment, as it is pretty well hidden and the distance. The solar company said the conduit to & from the inverters would be 2” for feeds with an additional 1” for controls, so the wiring for all three inverts will be located in (1) 2” & (1) 1” conduit located low on the mechanical equipment roof area. The conduit can be painted to match the siding, but the equipment can not be. I located it so it will not be very visible, but if needed we can enclose them all together in a ventilated enclosure. I am also including cut sheets on the panels & the equipment. Laura Koss 9/5/25, 9:32 AM Mail - Julia Destino - Outlook https://outlook.office365.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AxlDIuR%2FRMEO89B%2FMS6nl%2BQABPnf3UwAA 2/4 From: Julia Destino <Julia.Destino@saratoga-springs.org> Sent: Tuesday, September 2, 2025 9:19 AM To: Laura Koss <laura@re4ormarchitecture.com> Subject: Re: RISE Finley streety apartments solar amended DRC application Good Morning Laura, Checking in on the information regarding the equipment and conduit locations for the solar panel array. Please get that to me asap. Thank you, Julia Destino Planner City of Saratoga Springs 474 Broadway Saratoga Springs, NY 12866 Phone: 518-587-3550 ext. 2533 From: Laura Koss <laura@re4ormarchitecture.com> Sent: Wednesday, August 27, 2025 9:50 AM To: Julia Destino <Julia.Destino@saratoga-springs.org>; Susan Barden <Susan.Barden@saratoga-springs.org> Cc: Sybil Newell <snewell@riseservices.org>; Lindsey Connors <lconnors@riseservices.org>; Mike Newman <mnewman@csdhousing.com>; Keri Curtis <KCurtis@csdhousing.com>; Vickie Messner <vmessner@csdhousing.com> Subject: RE: RISE Finley streety apartments solar amended DRC application Caution: This is an external email and may have suspicious content or subject. Please take care when clicking links or opening attachments. When in doubt, contact IT. Julia & Susan, Attached are 2 more documents for the application: Site plan Roof plan Thanks, Laura 9/5/25, 9:32 AM Mail - Julia Destino - Outlook https://outlook.office365.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AxlDIuR%2FRMEO89B%2FMS6nl%2BQABPnf3UwAA 3/4 Laura Koss From: Laura Koss <laura@re4ormarchitecture.com> Sent: Wednesday, August 27, 2025 9:37 AM To: 'Julia Destino' <Julia.Destino@saratoga-springs.org>; 'Susan Barden' <Susan.Barden@saratoga-springs.org> Cc: 'Sybil Newell' <snewell@riseservices.org>; 'Lindsey Connors' <lconnors@riseservices.org>; Mike Newman <mnewman@csdhousing.com>; 'Keri Curtis' <KCurtis@csdhousing.com>; 'Vickie Messner' <vmessner@csdhousing.com> Subject: RISE Finley streety apartments solar amended DRC application HI Julia & Susan, Attached please find a new DRC application to amend The Finley project to include a solar array. Due to a requirement by the state funding the project is applying for the solar is requirement. The solar array is proposed for the south facing roof of the 3 story apartment building. We are showing the solar array in the attached rendering. The asphalt shingles proposed for the roof will be black in color & the panels should blend in. Any conduits required will be painted to match the roof or siding as required to make them blend in with the surrounding materials also. Lindsey Connor & Susan discussed this amended application last week. Our funding application is due 9/11/2025, and we are requesting to be included on the 9/10/2025 DRC agenda. I understand this is short notice but if the solar array is not approved, we will need to amend our funding application to remove solar. Thank you in advance for your assistance with this application. I will hand deliver the amended application, site plan & building rendering later today. Thanks, Laura Laura Koss 9/5/25, 9:32 AM Mail - Julia Destino - Outlook https://outlook.office365.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AxlDIuR%2FRMEO89B%2FMS6nl%2BQABPnf3UwAA 4/4