HomeMy WebLinkAbout20250249 538 Union Ave Deomlition and Construction Updated Construction PlansBREEZEWAY ELEVATION
BREEZEWAY PLAN
DWG4
A R C H I T E C T S, LLC
REAR ELEVATION
FRONT ELEVATION
(25.0 16.0 0.75 1.5 0.75 4.0 2 2 2 2 0 1.0 "T" 0.625 "A-GLAZ" 1 "F" "W") (25.0 16.0 0.75 1.5 0.75 4.0 2 2 2 2 0 1.0 "T" 0.625 "A-GLAZ" 1 "F" "W")
DWG2
SIDE ELEVATION
SIDE ELEVATION
A R C H I T E C T S, LLC DWG3