Loading...
HomeMy WebLinkAbout20250587 63 Henning Rd Site Plan Cost EstimateCost Estimate for Letter of Credit Planning Board No.: PB# XXXX Project: Rood & Riddle Equine Hospital in Saratoga Location: 63 Henning Road Saratoga Springs, NY Date: 6/27/2025 Firm Name & Preparer: The LA Group On Site (All infrastructure & amenities on private property) Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Preparation and Grading 2 Rough Grading 1 LS $15,000.00 $15,000.00 0% $15,000.00 4 Construction Entrance 1 EA $1,500.00 $1,500.00 0% $1,500.00 6 Erosion Control Measures 1 LS $2,000.00 $2,000.00 0% $2,000.00 Demolition 7 Building Removal 1 EA $25,000.00 $25,000.00 0% $25,000.00 8 Asphalt Removal 1 LS $5,600.00 $5,600.00 0% $5,600.00 Hard Scape 10 Crushed Stone Drive 335 SF $3.75 $1,256.25 0% $1,256.25 11 Asphalt Pavement 2,700 SF $5.00 $13,500.00 0% $13,500.00 12 CIP Curbing 32 LF $35.00 $1,120.00 0% $1,120.00 13 Concrete Sidewalk 2,400 SF $7.00 $16,800.00 0% $16,800.00 Site Amenities 15 Traffic Signs 3 EA $500.00 $1,500.00 0% $1,500.00 16 Striping 1 LS $750.00 $750.00 0% $750.00 Item # Item/Remarks Quantity Unit Unit Cost Subtotal % Complete Reduced $ Site Sanitary 17 Leachfield 1 LS $3,000.00 $3,000.00 0% $3,000.00 18 4" Sch. 40 PVC Sanitary Line 100 LF $40.00 $4,000.00 0% $4,000.00 19 1000 Gallon Septic tank 2 EA $5,000.00 $10,000.00 0% $10,000.00 20 Sanitary Cleanout 1 EA $500.00 $500.00 0% $500.00 Site Storm 30 4" HDPE Perforated Storm Drain & Stone 46 LF $75.00 $3,450.00 0% $3,450.00 31 4" HDPE Storm Drain 22 LF $35.00 $770.00 0% $770.00 32 12" HDPE Storm Drain 87 LF $50.00 $4,350.00 0% $4,350.00 Landscaping 33 Topsoil/Seed/Mulch 1 LS $3,000.00 $3,000.00 0% $3,000.00 Total onsite Work $113,096.25 $113,096.25 Total onsite X.25 $28,274.06 $28,274.06 LOC Estimate - 2025-06-25 Off Site (All infrastructure & amenities to be dedicated to the City) Item # Item/Remarks Quantity Unit Subtotal % Complete Reduced $ Misc. 34 As-built Drawing 1 LS $2,500.00 $2,500.00 0% $2,500.00 Total offsite Work $2,500.00 $2,500.00 Total On-Site Work X25%$28,274.06 Total Off-Site work $2,500.00 Total LOC Amount = $30,774.06 * New LOC Reduced Amount = $30,774.06 City LOC Approval / Date City LOC Reduction Approval /Date * LOC cannot be reduced to less than 25% of the original LOC amount. Maximum Reduction 75% = $7,693.52 LOC Estimate - 2025-06-25